Resolution - 5725•
E
RESOLUTION NO. 5725
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
WEST COVINA, ADOPTING A SCHEDULE OF FEES FOR
MECHANICAL PERMITS.
THE CITY -COUNCIL OF THE CITY OF WEST COVINA DOES RESOLVE AS
FOLLOWS:
SECTION 1. 'A fee for each mechanical permit shall be paid
to the Building Official asset forth in the following Schedule
of Fees:
Schedule of'Fees
For the issuance of each permit. .... ................. $ 7.00
For the installation cr relocation of each forced=air or gravity -
type furnace or burner, including ducts and vents attached to
such appliance, up to and including 100,000 Btu/h................ 6.00
For the installation or relocation of each forced -air or gravity -
type fur.,naoe_'or burner, including. ducts and vents attached to
such appliance over 100,000 Btu/h................................... 10.00
For the installation or relocation of each floorfi�rnaee - in-
cluding vent ...................... 6.00
For the installation or relocation of each suspended heater,
recessed wall heater or floor mounted unit heater ................ 6.00
For the installation, relocation or replacement of each appliance
vent installed and not included in an appliance permit........... 6.00
For the repair of, alteration of, or addition to each heating ap-
pliance, refrigeration unit, cooling unit, absorption unit, or
each heating, cooling, absorption, or evaporative cooling system,
including installation of controls regulated by.the Code......... 6.00
For the installation or relocation.of.each:.boiler or compressor
to and including three horsepower, or..each absorption system to
and including 100,000 Btu/h...................................... 6.00
For the installation or relocation of each boiler or compressor
over three horsepower to and including 15 horsepower, or each
absorption system over 100,000 Btu/h to and including 1,000,000
Btu/h............................................................ 10.00
For the installation or relocation of each boiler or compressor
over 15 horsepower to and including 30 horsepower, or each ab-
sorption system. over 1,000,000 Btu/h............................. 20.00
For the installation or relocation of each boiler or compressor
over 30 horsepower to and including 50 horsepower, or for each
absorption system'over-1,000,000,Btu/h to and including 1,750,000
Btu/h............................................................ 30.00
For the installation or relocation of each boiler or refrigeration
compressor over 50 horsepower, or each absorption system over
1:,750,000 Btu/h................................................... 40.00
For each air handling unit to and including 10,000 cubic feet per
minute, including ducts attached thereto .......................... $
6'.'OV
NOTE: This fee shall not apply -to an air handling unit which is
a portion of a factory assembled appliance, cooling unit,
evaporative cooler or absorption unit for which a permit
• is required elsewhere in this Code.
For each air handling unit over 10,000 cfm........................
10.00
For each evaporative cooler other than portable type ..............
6.00
For each ventilation fan connected to a single duct ...............
4.00
For each ventilation system which is not a portion of any heating
or air conditioning system authorized by a permit .................
8.00
For each alteration to a duct system ..............................
6.00
For each commercial spray;booth...................................
10.00
For the installation of each hood which is served by mechanical
exhaust, including the ducts for such hood ........................
10.00
For the installation or relocation of each domestic type incinerator
5.00
For the installation or relocation of each commercial or industrial
typeincinerator ..................................................
20.00
For each appliance or piece of equipment regulated by this Code but
not classed in other appliance categories, or for which no�' other
fee is listed in this Code ........................................
6.00
SECTION 2. Where additional inspections are made necessary due
to work not being ready at the time specified or due to work not cor-
rected after prior written correction notice, an"'-' additional fee of
$20.00 may be required by the Building Official prior to reinspection.
SECTION 3. This resolution shall be effective upon the effec-
tive date of Ordinance No. 1381
A&4k LF
Mayor
ATTEST
(/ J d�i/�ci V(' 4 4 Z [i(�fG�(/YL
T City Clerk
'I HEREBY CERTIFY that the foregoing Resolution_ No. 5725 was duly
adopted by the City Council of the City of West Covina at a regular
meeting thereof, held on the 26th day of June 1978, by the
following vote of the Council:
AYES: Councilmen: Miller, Shearer, Browne, Chappell, Tice.
NOES: Councilmen: None
• ABSENT: Councilmen: None
ity Clerk
Approved as to form:
City Attorney