Loading...
03-16-2021 - AGENDA ITEM 05 CONSIDERATION OF PROFESSIONAL SERVICES AGREEMENT FOR COMPREHENSIVE DEVELOPMENT CODE UPDATEAGENDA ITEM NO. 5 AGENDA STAFF REPORT City of West Covina I Office of the City Manager DATE: March 16, 2021 TO: Mayor and City Council FROM: David Carmany City Manager SUBJECT: CONSIDERATION OF PROFESSIONAL SERVICES AGREEMENT FOR COMPREHENSIVE DEVELOPMENT CODE UPDATE RECOMMENDATION: It is recommended that the City Council take the following actions: 1. Award the contract for the Comprehensive Development Code Update to KTGY Group, Inc.; and 2. Authorize the City Manager to negotiate and execute a Professional Services Agreement with KTGY Group, Inc., in an amount not to exceed $490,429, for a term ending March 31, 2024. BACKGROUND: When a municipality adopts a comprehensive plan - a general policy document - zoning ordinances and subdivision regulations are the two most commonly used legal devices to carry it out. A zoning ordinance divides a community into districts, or zones, and regulates land use activity in each district, specifying the permitted uses of land and buildings, the intensity or density of such uses, and the bulk (size) of buildings on the land. By contrast, subdivision regulations govern both the division of land into two or more lots, parcels, or sites for building and the location, design, and installation of supporting infrastructure Together, these regulatory devices ensure that (1) the future land use pattens incorporated into the comprehensive plan are achieved; (2) existing land uses (such as homes) are shielded from incompatible land uses (such as heavy industry); (3) development is adequately served by streets, schools, parks and recreation, and utility systems; and (4) the city is in compliance with myriad local, state and federal policies & regulations. The City's current Zoning Code and Subdivision Ordinance are decades old and have only been modified through minor amendments in order to keep up with State requirements. In addition, the codes are poorly organized. With this project, the City is embarking on a complete overhaul of both codes. This would be a repeal and replacement of the existing codes. DISCUSSION: On December 2, 2020, staff issued a Request for Proposals (RFP) for qualified consultants to prepare a comprehensive update to the City's Zoning Ordinance and Subdivision Ordinance and the creation of a consolidated Development Code. The RFP was posted on PlanetBids. On January 14, 2021, the City received proposals from: MIG, Lisa Wise Consulting, Inc., Infrastructure Engineers, and KTGY Group, Inc. (KTGY Architecture and Planning). The proposals were reviewed by two staff members for relevant experience, qualifications of personnel, and schedule of costs. The results of the evaluation of the proposals are as follows: 6.4. Notices. Any notices, documents, correspondence or other communications concerning this Agreement or the work hereunder may be provided by personal delivery, facsimile, Email or by U.S. mail. If by U.S. mail, it shall be addressed as set forth below and placed in a sealed envelope, postage prepaid, and deposited in the United States Postal Service. Such communication shall be deemed served or delivered: a) at the time of delivery if such communication is sent by personal delivery; b) at the time of transmission if such communication is sent by Email; and c) 72 hours after deposit in the U.S. Mail as reflected by the official U.S. postmark if such communication is sent through regular United States mail. IF TO CONSULTANT: IF TO CITY: KTGY Group, Inc. City of West Covina 17911 Von Karman Ave., Suite 200 1444 West Garvey Ave. South Irvine, CA 92614 West Covina, CA 91790 Tel: (949) 221-1244 Tel: (626) 939-8422 Email: kryan@ktgy.org Email: jburns@westcovina.org Attn: Ken Ryan Attn: Jo -Anne Burns, Planning Manager 6.5. Attorneys' Fees. If litigation is brought by any party in connection with this Agreement against another party, the prevailing party shall be entitled to recover from the opposing party all costs and expenses, including reasonable attorneys' fees, incurred by the prevailing party in the exercise of any of its rights or remedies hereunder or the enforcement of any of the terms, conditions, or provisions hereof. 6.6. Governing Law. This Agreement shall be governed by and construed under the laws of the State of California without giving effect to that body of laws pertaining to conflict of laws. In the event of any legal action to enforce or interpret this Agreement, the parties hereto agree that the sole and exclusive venue shall be a court of competent jurisdiction located in Los Angeles County, California. 6.7. Assignment. Consultant shall not voluntarily or by operation of law assign, transfer, sublet or encumber all or any part of Consultant's interest in this Agreement without City's prior written consent. Any attempted assignment, transfer, subletting or encumbrance shall be void and shall constitute a breach of this Agreement and cause for termination of this Agreement. Regardless of City's consent, no subletting or assignment shall release Consultant of Consultant's obligation to perform all other obligations to be performed by Consultant hereunder for the term of this Agreement. 6.8. Indemnification and Hold Harmless. Consultant agrees to defend, with counsel of City's choosing, indemnify, hold free and harmless the City, its elected and appointed officials, officers, agents and employees, at Consultant's sole expense, from and against any and all claims, demands, actions, suits or other legal proceedings brought against the City, its elected and appointed officials, officers, agents and employees arising out of the performance of the Consultant, its employees, and/or authorized subcontractors, of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of negligence or wrongdoing by the Consultant, its employees, and/or authorized subcontractors, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subcontractors, and/or whenever any claim, action, complaint or suit asserts liability against the City, its elected and appointed officials, officers, agents and employees based upon 8 KTGY Group, Inc. Form Revised November 2020 the work performed by the Consultant, its employees, and/or authorized subcontractors under this Agreement, whether or not the Consultant, its employees, and/or authorized subcontractors are specifically named or otherwise asserted to be liable. Notwithstanding the foregoing, the Consultant shall not be liable for the defense or indemnification of the City for claims, actions, complaints or suits arising out of the sole active negligence or willful misconduct of the City. This provision shall supersede and replace all other indemnity provisions contained either in the City's specifications or Consultant's Proposal, which shall be of no force and effect. 6.9. Independent Contractor. Consultant is and shall be acting at all times as an independent contractor and not as an employee of City. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act on behalf of City as an agent. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant's employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its agents or employees are in any manner agents or employees of City. Consultant shall secure, at its sole expense, and be responsible for any and all payment of Income Tax, Social Security, State Disability Insurance Compensation, Unemployment Compensation, and other payroll deductions for Consultant and its officers, agents, and employees, and all business licenses, if any are required, in connection with the services to be performed hereunder. Consultant shall indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Consultant further agrees to indemnify and hold City harmless from any failure of Consultant to comply with the applicable worker's compensation laws. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Consultant's failure to promptly pay to City any reimbursement or indemnification arising under this paragraph. 6.10. PERS Eligibility Indemnification. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits. 6.11. Cooperation. In the event any claim or action is brought against City relating to Consultant's performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation which City might require. 6.12. Ownership of Documents. All findings, reports, documents, information and data including, but not limited to, computer tapes or discs, files and tapes furnished or prepared by Consultant or any of its subcontractors in the course of performance of this Agreement, shall be 9 KTGY Group, Inc. Form Revised November 2020 and remain the sole property of City. Consultant agrees that any such documents or information shall not be made available to any individual or organization without the prior consent of City. Any use of such documents for other projects not contemplated by this Agreement, and any use of incomplete documents, shall be at the sole risk of City and without liability or legal exposure to Consultant. City shall indemnify and hold harmless Consultant from all claims, damages, losses, and expenses, including attorneys' fees, arising out of or resulting from City's use of such documents for other projects not contemplated by this Agreement or use of incomplete documents furnished by Consultant. Consultant shall deliver to City any findings, reports, documents, information, data, in any form, including but not limited to, computer tapes, discs, files audio tapes or any other related items as requested by City or its authorized representative, at no additional cost to the City. Consultant or Consultant's agents shall execute such documents as may be necessary from time to time to confirm City's ownership of the copyright in such documents. 6.13. Electronic Safeguards. Consultant shall identify reasonably foreseeable internal and external risks to the privacy and security of personal information that could result in the unauthorized disclosure, misuse, alteration, destruction or other compromise of the information. Consultant shall regularly assess the sufficiency of any safeguards and information security awareness training in place to control reasonably foreseeable internal and external risks, and evaluate and adjust those safeguards in light of the assessment. 6.14. Economic Interest Statement. Consultant hereby acknowledges that pursuant to Government Code Section 87300 and the Conflict of Interest Code adopted by City, Consultant is designated in said Conflict of Interest Code and is therefore required to file an Economic Interest Statement (Form 700) with the City Clerk, for each employee providing advice under this Agreement, prior to the commencement of work, unless waived by the City Manager. 6.15. Conflict of Interest. Consultant and its officers, employees, associates and subconsultants, if any, will comply with all conflict of interest statutes of the State of California applicable to Consultant's services under this agreement, including, but not limited to, the Political Reform Act of 1974 (Government Code Section 81000, et seq.) and Government Code Sections 1090-1092. Consultant covenants that none of Consultant's officers or principals have any interest in, or shall acquire any interest, directly or indirectly, which will conflict in any manner or degree with the performance of the services hereunder, including in any manner in violation of the Political Reform Act. Consultant further covenants that in the performance of this Agreement, no person having such interest shall be used by Consultant as an officer, employee, agent, or subconsultant. Consultant further covenants that Consultant has not contracted with nor is performing any services, directly or indirectly, with any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) owning property in the City and further covenants and agrees that Consultant and/or its subconsultants shall provide no service or enter into any agreement or agreements with a/any developer(s) and/or property owner(s) and/or firm(s) and/or partnership(s) owning property in the City prior to the completion of the work under this Agreement. 6.16. Prohibited Employment. Consultant will not employ any regular employee of City while this Agreement is in effect. 6.17. Order of Precedence. In the event of an inconsistency in this Agreement and any of the attached Exhibits, the terms set forth in this Agreement shall prevail. If, and to the extent this Agreement incorporates by reference any provision of any document, such provision shall be deemed a part of this Agreement. Nevertheless, if there is any conflict among the terms and conditions of this Agreement and those of any such provision or provisions so incorporated by reference, this Agreement shall govern over the document referenced. 10 KTGY Group, Inc. Form Revised November 2020 6.18. Costs. Each party shall bear its own costs and fees incurred in the preparation and negotiation of this Agreement and in the performance of its obligations hereunder except as expressly provided herein. 6.19. No Third Party Beneficiary Rights. This Agreement is entered into for the sole benefit of City and Consultant and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right in, under or to this Agreement. 6.20. Headings. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement. 6.21. Construction. The parties have participated jointly in the negotiation and drafting of this Agreement and have had an adequate opportunity to review each and every provision of the Agreement and submit the same to counsel or other consultants for review and comment. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement. 6.22. Amendments. Only a writing executed by the parties hereto or their respective successors and assigns may amend this Agreement. 6.23. Waiver. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought. The waiver of any right or remedy in respect to any occurrence or event shall not be deemed a waiver of any right or remedy in respect to any other occurrence or event, nor shall any waiver constitute a continuing waiver. 6.24. Severability. If any provision of this Agreement is determined by a court of competent jurisdiction to be unenforceable in any circumstance, such determination shall not affect the validity or enforceability of the remaining terms and provisions hereof or of the offending provision in any other circumstance. Notwithstanding the foregoing, if the value of this Agreement, based upon the substantial benefit of the bargain for any party, is materially impaired, which determination made by the presiding court or arbitrator of competent jurisdiction shall be binding, then both parties agree to substitute such provision(s) through good faith negotiations. 6.25. Counterparts and Electronic Signatures. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original. All counterparts shall be construed together and shall constitute one agreement. Counterpart written signatures may be transmitted by facsimile, email or other electronic means and have the same legal effect as if they were original signatures. 6.26. Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that they are duly authorized to execute this Agreement on behalf of said parties and that by doing so the parties hereto are formally bound to the provisions of this 11 KTGY Group, Inc. Form Revised November 2020 Agreement 6.27. Taxpayer Identification Number. Consultant shall provide City with a complete Request for Taxpayer Identification Number and Certification, Form W9, as issued by the Internal Revenue Service. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by and through their respective authorized officers, as of the date first above written. CITY OF WEST COVINA, A municipal corporation Date: David Carmany City Manager CONSULTANT Date: Signature Name and Title Date: Signature Name and Title ATTEST: Lisa Sherrick Assistant City Clerk APPROVED AS TO FORM: Date: Thomas P. Duarte City Attorney 12 KTGY Group, Inc. Form Revised November 2020 APPROVED AS TO INSURANCE: Date: Helen Tran Human Resources and Risk Management Director 13 KTGY Group, Inc. Form Revised November 2020 EXHIBIT A CONSULTANT'S PROPOSAL Bolsa Row Specific mm�Westminster, CA Aw - 1 ■ All n f�i I in - rilk, r., C Queen of the Valley _Specific P �^ psi Covina, CA �Ro— Village Baton Rouge, L 17911 Von Karman Ave Suite 200 1 rvi ne, CA 92614 949.851.2133 January14,2021 Jo -Anne Burns City of West Covina 1444 West Garvey Avenue South West Covina, CA 91790 Re: Letter of Transmittal —Comprehensive Development Code Update Dear Mrs. Burns: It is with great pleasure that KTGY Group, Inc. submits our team's qualifications and proposal for the Comprehensive Development Code Update project. My Planning Director, John Moreland, will personally lead the KTGY project team in this important endeavor. John's experience in working with both the public and private sectors is extensive, and he offers unique and strategic insight gained through numerous complex land use policy projects over his 15 plus -year career. Having previously worked at the City of West Covina and most recently as a consultant for the Queen of the Valley Specific Plan project, John has a deep understanding of the City's existing Zoning Code and all of its unique elements. His experience in working with over 100 California jurisdictions will yield policy solutions crafted exclusively for West Covina. Our team also includes another former West Covina employee, Jihad Othman, who has extensive experience with permitting and working with complex intra-department procedures. Our combined KTGY team will ensure that the final Development Code will anticipate numerous development scenarios and procedures while our efforts will come in on -time and on -budget. In working with comprehensive development codes, we found it easier and more efficient to break up the topics into sections, rather than trying to tackle the entire code at one time. This would allow for more in-depth discussion for each item, but not impact the overall project timeline. Our scope of work also includes an extensive outreach campaign — not with just the public, but with also City staff. We understand that not only the Planning Department uses the Zoning and Subdivision Codes, but also Code Enforcement, Engineering, Building, and Public Safety to a certain extent. Our work efforts will include streamlined procedures, similar to the provisions we wrote for the County of Orange. Our work will also include provisions for newer uses such as escape rooms, distilleries/breweries, and allowances for outdoor dining (including pandemic -related provisions). Furthermore, our firm has in-house architectural experience, across a wide variety of styles and densities. KTGY's architectural experience in the City includes The Colony at the Lakes and Cameron 56. Some key qualifications of our team include: • One of this country's most successful planning, urban design, and architectural firms. • Established experience in planning unique, lively, and well -crafted communities and destinations that incorporate enduring design, solid market fundamentals, flexible land use policies, and smart growth principles. • Proven experience with functional, budgetary, and scheduling requirements for planning projects. • Experience in crafting land use policy documents, such as zoning code amendments and Specific Plans, that are implementable, clear, concise, and allow for flexible and creative development. • An open and collaborative approach to planning and design. No. Firms 0 KTGY Architecture and Planning 0 MIG 0 Lisa Wise Consulting, Inc. ® Infrastructure Engineers KTGY Architecture and Planning scored the highest in the review of the proposals. KTGY submitted an exemplary proposal that addressed each aspect of the RFP. KTGY has completed similar projects in the Cities of Irvine and Rialto, and most recently completed the Queen of the Valley Specific Plan for the City. The project scope of work contemplates extensive meaningful community outreach and participation. Staff is recommending the City Council approve a Professional Services Agreement with KTGY Group, Inc. in an amount not to exceed $490,429.00. LEGAL REVIEW: The City Attorney's Office has reviewed and approved the proposed agreement as to form. OPTIONS: The City Council has the following options: 1. Approve staff's recommendation; or 2. Provide alternative direction. Prepared by: Jo -Anne Burns, Planning Manager Fiscal Impact FISCAL IMPACT: Funding for the Professional Services Agreement with KTGY Architecture and Planning will be paid out of funding received from the California Department of Housing and Community Development from the LEAP Grant. Attachments Attachment No. 1 - Professional Services Agreement with KTGY Group, Inc. CITY Enhance the City Image and Effectiveness COUNCIL Engage in Proactive Economic Development GOALS & OBJECTIVES: 17911 Von Karman Ave Suite 200 Irvine, CA 92614 949.851.2133 10 Mw In the enclosed materials, you will find descriptions of our firm, team members, and scope of work, all of which demonstrate our commitment to innovation and collaboration. We appreciate this opportunity and look forward to working with you on this project. If you have any questions regarding the content of this proposal, please contact John Moreland at 562.216.3850 or via email at jmoreland@ktgy.com. This proposal will remain valid for 180 days from the date on this letter. Sincerely, Ken Ryan Principal KTGY Architecture + Planning 949.221.1244 1 kryan@ktgy.com Chapman University Specific Plan Orange, CA pp PROJECT SUMMRY, i & APPROCH M E XmIli _ d moor ''' ,'��, • — - r PROJECT APPROACH The Comprehensive Development Code Update (Project) will create a new streamlined Development Code for the City of West Covina. This Project will simplify the range of zones and entitlement procedures currently found within the existing Zoning Code. The goal will also be to present the Code in a simple and straightforward manner, eliminating Planned Community Development text and Single -Family Area Districts. Uses will also be consolidated and updated to reflect current market trends. Consideration will also be given to emerging uses as a result of the pandemic. Another objective would be to make uses more resilient but also balance the need for public safety and high -quality architectural design. In keeping with our firm's philosophy, KTGY's approach will be a highly collaborative, multi- disciplinary effort involving the City, our CEQA consultant, local stakeholders, and the community. We understand that each participant offers unique experience and perspective that will contribute to the overall success and value of any planning effort. Our approach for the Project will focus on three main components: 1) frequent and clear communication with the City and the public; 2) divide the Code into manageable pieces when communicating with the public; and 3) look for innovative ways to spur development (such as allowances for tasteful advertising in commercial centers and density bonuses for residential projects that provide exceptional community benefits). Having previously worked in the planning departments of the City of West Covina and the County of Orange, John Moreland, Project Manager, understands the need to provide clear communication, as well as howto keep a thorough record asthe project progresses. It is imperative that communication does not include planning or technical jargon and that communication is made in a clear, concise, and accurate manner. The Zoning Code will also need to reflect this to avoid any potential ambiguity. KTGY's Queen of the Valley Specific Plan demonstrates our ability to graphically depict tiered setbacks and describes other standards in a clear manner. Our proposal includes frequent communication with the City, including bi-weekly conference calls to keep the City updated on the content and deliverables. These calls will include a brief agenda and minutes in the form of an action item summary. I 100 Acre Development Parcel I Irvine, CA KTGY ARCHITECTURE + PLANNING PROJECT APPROACH Our initial efforts will consist of an extensive audit and evaluation of the existing Zoning and Subdivision Codes. This audit will include our initial recommendation on the framework for the new Code, as well as opportunities for updates as well as sections that should remain. After this audit, KTGY will begin the community outreach process. We will utilize Bang the Table, an online engagement platform, which includes hosting its own website and interactive online features to connect with the public. This website will become the online portal for the Project and contain all of the requested documentation. In addition to the scope requested by the City, KTGY recommends to create a Technical Advisory Committee, consisting of key City Staff to provide input on the future implementation of the Development Code. Some of KTGY's recommended preliminary planning goals include: • Establish a framework for the Development Code that represents the character and identity desired by the City and the community. • Assess uses that typically require little public scrutiny such as general or on -sale service of alcohol in conjunction with a bona -fide restaurant. Consider including standard conditions in the Code or have these uses go through an administrative review process. • Consider incorporating shared parking into the Code, allowing reductions based on a parking study, and/or granting parking reductions for businesses that incorporate Transportation Demand Management (TDM) provisions. • Work closely with Police and Fire to ensure the Code does not impact public safety. • Streamline, simplify, and update signage regulations to reflect current trends in signage design. • Eliminate Area Districts and reduce the variety of residential and commercial zoning designations, while not infringing on existing development rights. • Ensure provisions are easy to understand and limit `legalese." Should a regulation be difficult to describe, use graphics to explain it. KTGY's team includes two people who has formerly worked at the City of West Covina. Additionally, our environmental consultant, Psomas, has extensive experience in the City as well. Combined with our extensive experience in working with both public and private sector clients, KTGY is well positioned to prepare the Code update desired by the City of West Covina in an efficient and innovative manner. Also, as with all of KTGY's policy documents, our work efforts include a training/Q&A session with City staff. For this effort, we believe it will be necessary to include other departments, including Code Enforcement about the components of the new Development Code. KTGY ARCHITECTURE + PLANNING - .1` AR r' e p c 44,75- xr 1, Heritage Square Signal Hill, CA 11 PUMP)ACK'S CAFE c `.� SCOPE OF WORK I1:��. & PR JEC TIMELINE SCOPE OF WORK Note: Tasks identified below may occur sequentially or concurrently. TASK 1- PROJECT MANAGEMENT 1.1 Project Kick -Off Immediately following the notice to proceed, the Project team will attend one Kick -Off Meeting with the City of West Covina (City) to discuss the following: • Confirmation of project objectives, scope of work, schedule, deliverable/milestone dates, communication protocols, and any applicable agency coordination. • Summary of project history, specific desires, and current studies, including updates on relevant studies or information since the RFP was released • Determine schedule for standing bi-weekly conference calls/meetings with City staff. • Data needs, key contacts, and information sources. • Discuss conceptual outreach meeting schedule. • Deliverable formats and organization. 1.2 Project Management To effectively manage the multiple deliverables of the project, the Project Manager will host bi-weekly conference calls to update the City on upcoming deliverables and discuss any potential issues that may impact the scope of work. We will draft agendas in advance of these calls via email to the City. The agendas will identify action items and the responsible party to implement said action item. In addition to these calls, we will be available to City staff to answer questions, address concerns, or to clarify issues as they arise. Having staff that has worked in both politics and as public sector planners, KTGY brings a unique perspective and prides itself in being responsive to address any client needs. Task 1 Work Products (in Electronic Format): Project Schedule Agenda Meeting Minutes Task 1 Meetings: One (1) Project Kick-off Meeting with City staff Bi-weekly Conference Calls Throughout the Project Duration KTGY ARCHITECTURE + PLANNING SCOPE OF WORK TASK 2 - BACKGROUND INFORMATION 2.1 Document Review and Zoning Code Audit Collect and evaluate information pertaining to the Development Code, including, but not limited to, the following: • City of West Covina General Plan • City of West Covina Zoning Code and Zoning Map • Planned Community Development Text • Specific Plans within the City (as applicable) • Working files for City GIS data Develop a working base map using available City GIS map and data. The base map will be used to prepare subsequent maps and exhibits. This task also includes an audit of the City's existing Zoning and Subdivision Codes. A memo will be prepared identifying the provisions of the Zoning and Subdivision Codes that we would recommend keeping, revising, and/or consolidating. This memo will also include our initial potential modifications. This memo will also identify recent State law provisions related to housing production and recommended modifications for consistency purposes. 2.2 Zoning Code Parking Report (in partnership with Psomas): Conductananalysisof parking requirements and evaluate current City parking requirements as well as those for similar/adjacent jurisdictions. Upon completion of the evaluation, we will provide recommendations for new parking requirements for various land use types. In addition, where appropriate, we will develop options for shared parking and other potential performance -based reductions (such as Transportation Demand Management provisions), which may further reduce parking requirements. One draft and one final report will be provided. Task 2 Work Products (in Electronic Format): Zoning Code Audit Zoning Code Parking Report (Prepared by Psomas) KTGY ARCHITECTURE + PLANNING ATTACHMENT NO. 1 CITY OF WEST COVINA PROFESSIONAL SERVICES AGREEMENT WITH KTGY GROUP, INC. FOR COMPREHENSIVE DEVELOPMENT CODE UPDATE THIS AGREEMENT is made and entered into this 16th day of March, 2021 ("Effective Date"), by and between the CITY OF WEST COVINA, a municipal corporation ("City"), and KTGY GROUP, INC., a California corporation ("Consultant"). WITNESSETH: A. WHEREAS, City proposes to utilize the services of Consultant as an independent contractor to City to provide consulting services in connection with a comprehensive Development Code update, as more fully described herein; and B. WHEREAS, Consultant represents that it has that degree of specialized expertise contemplated within California Government Code Section 37103, and holds all necessary licenses to practice and perform the services herein contemplated, except that if Consultant is required to but does not yet hold a City business license, it will promptly obtain a business license and will not provide services to the City until it has done so; and C. WHEREAS, City and Consultant desire to contract for the specific services described in Exhibit "A" and desire to set forth their rights, duties and liabilities in connection with the services to be performed; and D. WHEREAS, no official or employee of City has a financial interest, within the provisions of Sections 1090-1092 of the California Government Code, in the subject matter of this Agreement; and E. WHEREAS, Consultant responded to the City's Request for Proposals dated December 2, 2020, incorporated via this reference as if fully set forth herein, and Consultant's response to the Request for Proposals was a material inducement to the City ultimately entering into this agreement. NOW, THEREFORE, for and in consideration of the mutual covenants and conditions contained herein, the parties hereby agree as follows: 1.0. SERVICES PROVIDED BY CONSULTANT 1.1. Scope of Services. Consultant shall provide the professional services described in the Consultant's Proposal, attached hereto as Exhibit "A" and incorporated herein by this reference. 1.2. Professional Practices. All professional services to be provided by Consultant pursuant to this Agreement shall be provided by personnel experienced in their respective fields and in a manner consistent with the standards of care, diligence and skill ordinarily exercised by professional consultants in similar fields and circumstances in accordance with sound professional practices. Consultant also warrants that it is familiar with all laws that may affect its 1 KTGY Group, Inc. Form Revised November 2020 SCOPE OF WORK TASK 3 - COMMUNITY OUTREACH 3.1 Develop Public Participation Plan (PPP) KTGY will craft a strategic Public Participation Plan (PPP) to facilitate the project's outreach/community meetings. This PPP will outline the specific outreach and engagement approach, strategies, schedule, and milestone dates, in cooperation with the City. The PPP will serve as a public involvement blueprint to guide outreach for the duration of the Project; however, it will remain flexible to the needs of the project to ensure proactive and strategic engagement of the public and interested stakeholders. This task will also begin the formation of the Development Code Working Group. KTGY will work with the City in identifying and communicating with members of this group. Task 3.1 Work Products: Draft Public Participation Plan 3.2 Conduct Community Outreach Meetings Conduct one (1) community outreach meeting for each of the five (5) Council Districts. Each of the meetings are anticipated to be conducted early in the process but after the existing Zoning Code audit has been conducted. This scope also includes up to four (4) workshops before the Planning Commission and City Council. It is anticipated that first set of workshops would occur at roughly the same time, with a second set following later in the process. This task also includes bi-monthly meetings with the Development Code Working Group. KTGY will prepare agendas and minutes for the Development Code Working Group. Specific timing and dates for these meetings will be dependent upon consultation with the City and will be flexible to fit the needs of the Project. These meetings could be held virtuallyvia Zoom (hosted by KTGY) or in -person, depending on the status of the pandemic. If conducted in person, TurningPoint technology (an in -person interactive polling software designed to complement Microsoft PowerPoint) will be used. Should a member of the public miss one of the outreach meetings, the same interactive polling will be available online for the public to take at their convenience. This task assumes that City staff will handle meeting logistics and locations for in -person meetings, and each meeting will be approximately two (2) hours in duration. Task 3.2 Meetings: One (1) Community Meeting per Focus Area (Five (5) Total) One (1) Planning Commission Workshop KTGY ARCHITECTURE + PLANNING SCOPE OF WORK 3.3 Community Outreach Collateral Prepare supporting presentation exhibits and materials for use at the outreach meetings. The exhibits may be in the form of exhibits, presentation material, and handouts. Task 3.3 Work Products: Presentation Collateral, Exhibits, and/or PowerPoint, as Determined in Task 3.1 3.4 Project Website KTGY will utilize Bang the Table to create a webpage that will host all of the content created for the Project. This will become the main portal for the community to review project documents and provide online input. Sharing tools, feedback tools, analytics, and reports would be available to the City and public for a 24-month period. This scope of work includes a secure, branded Project page with a custom domain name. Content will be uploaded onto this page. Task 3.4 Work Products: Project Website 3.5 Social Media Coordination As part of the PPP, key milestones will require advance notification on the City's existing social media accounts. This scope of work assumes that KTGY will prepare draft Twitter and Facebook posts (with exhibits or links as warranted). The City will then post onto their existing Twitter feed and Facebook page. Task 3.5 Work Products: Draft Social Media Posts (as needed for the Project duration) 3.6 Community Outreach Summary A community outreach summary will be prepared that summarizes the public involvement and communication process. This report will summarize all public meetings, Development Code Working Group meetings, and other notification efforts. The summary will also deliver any other relevant documents to support the outreach activities completed, including survey results from Bang the Table and results from outreach polling. Task 3.6 Work Products: Community Outreach Summary (Draft and Final) KTGY ARCHITECTURE + PLANNING SCOPE OF WORK TASK 4 - DEVELOPMENT CODE PREPARATION 4.1 Development Code Preparation Administrative Review Draft of Development Code: Prepare the Administrative Review Draft of the Development Code. The Development Code will consist of both the Zoning and the Subdivision Codes. In addition to meeting the applicable legal and technical requirements, the code will include text, images, and graphics to clearly illustrate any provisions needing additional clarification so that the Code could be easily understood by government officials, land developers, residents, and business owners. It is anticipated that additional exhibits will be necessary to assist with some descriptions. It is also anticipated that the Zoning Code will be Euclidian in nature but will include minimum performance standards. Development standards for residential uses will be objective in nature to conform with recent State Law changes. It is our experience that flexible, but adequately defined development standards can allow for market -driven innovations in urban design and spur creativity from architects and designers. Codes that include strict regulations often sit unused with limited implementation. Provisions for streamlining residential development will be incorporated to meet the intent of the LEAP grant application. Submit the Administrative Review Draft of the Development Code for review. Revise the Administrative Review Draft based on comments received from the City. Revisions will be depicted in strike -through format. For budgetary purposes, a total of two (2) submissions of the Administrative Review Draft are included. It is anticipated that City staff will require three (3) to four (4) weeks for review and comment for each draft. Public Review Draft of the Development Code: Prepare the Public Review Draft of the Development Code for distribution and consideration by the Planning Commission and City Council. Revise the Public Review Draft based on comments received from the Planning Commission prior to going to City Council, then submit a second Public Review Draft. Revisions will be depicted in strike -through format. Final Development Code: Prepare the Final Development Code after City Council approval. Edits will be made as required by final City staff review, City Council action, conditions of approval, etc. KTGY will work with the City and Municode to get the new Development Code published. KTGY has verified that Municode accepts PDFs and no additional fees would be needed to publish the updated Code. If desired by the City, KTGY will provide a complete digital file with bookmarks and embedded hyperlinks in the PDF document. 4.2 General Plan Amendments Due to the comprehensive update of the Development Code, updates to the City's General Plan will be needed to implement it. KTGY will review the General Plan and prepare General Plan Amendments in strike -though format. It is anticipated that the same number of drafts for the Development Code will be needed for the General Plan Amendment. KTGY ARCHITECTURE + PLANNING SCOPE OF WORK 4.3 Zoning Map Update Utilizing the existing City of West Covina GIS database, KTGY will provide the City with a comprehensive updated GIS Zoning Map. All information contained in the existing GIS dataset (zoning, setbacks, etc.) will be included and updated. KTGY also recommends including incorporating older entitlement applications intotheGISdatasetfor ease offuture review. KTGY will need to work with the City, assess the exiting database organization, and the listing of most recent entitlement applications to determine the feasibility of this and extent of this effort. 4.4 Informational Handouts, Applications, and Guides Prepare up to a total of 20 informational handouts, applications, and guides to help describe provisions of the new code, identify procedures, and submittal requirements to the general public. Task 4 Work Products: Two (2) Administrative Review Drafts of the Development Code (PDF, MS Word, and up to five (5) hard copies) Two (2) Public Review Drafts of the Development Code (PDF, MS Word, and up to 10 hard copies for the Planning Commission and up to 15 hard copies for City Council) Final Development Code (Up to 30 hard copies) Two (2) Administrative Review Drafts of the General Plan Amendment (PDF, MS Word, and up to five (5) hard copies) Two (2) Public Review Drafts of the General Plan Amendment (PDF, MS Word, and up to 10 hard copies for the Planning Commission and up to 15 hard copies for City Council) Final General Plan Amendment (Up to 30 hard copies of revised pages for the City to slip sheet into existing General Plan documents) Updated Zoning Map (in GIS format with previous case file numbers entered, if feasible) Up to 20 Informational Handouts (up to 30 hard copies each) KTGY ARCHITECTURE + PLANNING SCOPE OF WORK TASK 5 - CEQA DOCUMENTATION (PREPARED BY PSOMAS) 5.1 Project Description Psomas will prepare a draft Project description in coordination and consultation with KTGY and the City that will correctly reflect the comprehensive update to the Development Code. Upon completion, Psomas will provide the Project description to the City for review. Psomas will revise the Project description to address the comments the City may have, and upon approval by the City, provide it to the team for preparation of the IS Checklist analyses. 5.2 Technical Analyses Psomas assumes that no studies/reports have been or will be prepared by the City. In the absence of a Project description and given that the specific updates to the Development Code are not known at this time, the exact scope for the Air Quality, Energy, Greenhouse Gas (GHG) Emissions, Noise, and Transportation analyses cannot be defined at this time. However, this SOW assumes that Psomas will coordinate with the City, KTGY, and Project team, as appropriate, to define the appropriate levels of analyses for these topics. The Cost Estimate provides a total budget for this coordination as well as preparation of qualitative Air Quality, Energy, GHG Emissions, Noise, and Transportation analyses by Psomas' in-house technical experts in support of the environmental document, consistent with CEQA requirements. The general analyses for these topics will include discussions of the applicable regulations, existing conditions and settings, and potential implications and impacts that the update to the Development Code could have in terms of Air Quality, Energy, GHG Emissions, Noise, and Transportation. 5.3 Initial Study/Mitigated Negative Declaration Administrative Draft Initial Study/Mitigated Negative Declaration: Psomas will prepare an Administrative Draft IS using the CEQA Environmental Checklist Form (Appendix G). In compliance with Section 15063 of the State CEQA Guidelines, the IS will contain the location of the Project site; a discussion of the environmental setting; a description of the Project; identification of the Project's potential environmental effects; and a discussion of any required mitigation. The discussion of the environmental setting will be based on a review of existing information, including the General Plan EIR and technical analyses prepared by Psomas. Each of the topics identified in Environmental Checklist Form will be analyzed to document the nature and extent of any potential environmental impacts for the proposed Project, and the analysis will include an explanation for all checklist responses to provide an understanding of how the conclusions were reached. Project -specific mitigation will be developed for impacts that are determined to be potentially significant. KTGY ARCHITECTURE + PLANNING SCOPE OF WORK The following discussion describes the work effort to be undertaken to assess potential environmental impacts of the Development Code Update in comparison with the analyses and assumptions in the General Plan EIR. These scopes will be further discussed with the City. • Aesthetics. The discussion in the IS will analyze the nature of the potential visual changes that could result with the proposed Project. Given that the Project is a comprehensive update of the Development Code, the analysis will focus on general changes envisioned under the proposed Project and their land use implications that could result in aesthetic and visual impacts. The potential impacts emanating from potential changes in anticipated and allowable lighting and resulting glare associated with the proposed Project will also be analyzed in the IS. • Agricultural and Forest Resources. The City of West Covina does not currently have any areas that are zoned, designated, used, or anticipated to be used for agricultural or forestry activities. The City does not have any areas subject to a Williamson Act contract; and it does not contain Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. Additionally, no forest land occurs within the City boundary. The IS will contain a statement identifying lack of agricultural and forest resources. • Air Quality. Please see Task 5.2, above • Biological Resources. The majority of the City of West Covina is developed; however, the City contains a number of natural hillside areas that provide habitat for sensitive species as well as ecological areas. The analysis will identify the implications of the Development Code Update in terms of biological resources, including sensitive habitats and species that inhabit them. Psomas will conduct a literature review of the existing state of biological resources within the City, and the impacts will be compared to the analysis in the General Plan EIR and assessed against the significance thresholds related to federal, State, and local regulations. • Cultural Resources and Tribal Cultural Resources. Dueto the highly urbanized condition of the City of West Covina, no pedestrian cultural resources survey is proposed. Therefore, the following tasks will meet standard practice in satisfying a CEQA level Cultural Resources analysis. A request will be submitted to the California Historical Resources Information System (CHRIS) at the South -Central Coastal Information Center (SCCIC) to conduct a records search of the City. For purposes of this Project, this search will encompass a A - mile radius of the City. Copies of all previously recorded cultural resources records and relevant cultural resources reports within the search area will be obtained. Psomas will also inspect any historical maps and aerials, USGS survey plats, and Government Land Office (GLO) plats that depict the Project site. Additionally, Psomas will request the Native American Heritage Commission (NAHC) conduct a search of the Sacred Lands File (SLF) of the Project site. KTGY ARCHITECTURE + PLANNING SCOPE OF WORK • Psomas will also provide support to the City to fulfill the agency -to -agency consultation requirements under Assembly Bill (AB) 52 and Senate Bill (SB) 18. This includes assisting with consultation with California Native American Tribes, identification of tribal cultural resources, and developing appropriate mitigation measures. This task assumes the preparation of up to six letters on City letterhead and up to five hours of telephone consultation in concert with the City, as needed to fulfill Native American consultation requirements. Psomas can provide further support related to AB 52 and SB 18 consultation, such as additional meetings, minutes, development of non- standard mitigation measures, or additional site visits, subject to a scope and budget augment. The results of the records searches and tribal consultations will be compiled and described in the Cultural and Tribal Cultural Resources (TCR) sections of the IS/ MND. • Energy. Please see Task 5.2, above. • Geology and Soils. This section of the IS/MND will discuss and assess the potential physical impacts pertaining to seismic hazards, underlying soil characteristics, slope stability, erosion, and liquefaction that may result from the update to the Development Code. Psomas will use the City's General Plan EIR in addition to the California Geological Survey (CGS), U.S. Geological Survey (USGS), and other pertinent data to obtain information pertaining to geology and soils. Psomas will also request a paleontological resources records search and literature review for the City from the Vertebrate Paleontology Section of the Los Angeles County Museum of Natural History. The Natural History Museum provides a letter summarizing information on geological formations and known paleontological localities (if any) near the City, and a determination of the paleontological sensitivity of the geologic units underlying the region. • Greenhouse Gas Emissions. Please see Task 5.2, above • Hazards and Hazardous Materials. This section of the IS will discuss and assess the potential impacts pertaining to exposure to hazards and hazardous materials that could result from the update to the Development Code. More specifically, the analysis will discuss development or redevelopment on contaminated sites; interference with emergency response and evacuation plans; and the risk of exposure to wildland fires. • Hydrology and Water Quality. The Hydrology and Water Quality section of the IS will discuss and analyze the potential impacts associated with hydrology and water quality that could result from the update to the Development Code. The conditions analyzed in the General Plan EIR such as the regional and local watershed characteristics, including water quality, drainage and infiltration patterns, and Hood hazards will be discussed as the baseline. Psomas will use the City's General Plan and General Plan EIR in addition to the Water Quality Control Plan for the Los Angeles Region, and other pertinent sources. KTGY ARCHITECTURE + PLANNING SCOPE OF WORK • Land Use and Planning. Psomas will describe the conditions and land use characteristics and overall land use pattern discussed in the General Plan EIR in comparison to the implications that the update to the Development Code would have on land use compatibility. Psomas will also evaluate the proposed Project's consistency with relevant local and regional land use plans, policies, or regulations, including but not limited to, the 2016 General Plan policies. • Mineral Resources. The City of West Covina does not contain any areas of known mineral resources appropriate for mineral extraction. The IS will discuss and identifying the City's lack of such resources. • Noise. Please see Task 5.2, above. • Population and Housing. Psomas will evaluate the population and housing trends in the City using the most current data available from the United States Bureau of the Census, the California Department of Finance (DOF), the 2016 General Plan and General Plan EIR, the Regional Housing Needs Assessment (RHNA), and the Southern California Association of Governments (SCAG). Psomas will also evaluate the direct and indirect impacts and implications that the update to the Development Code could have on population, housing, and employment forecasts. • Public Services and Recreation. This section of the IS will discuss and analyze the potential impacts and implications that the update to the Development Code could have pertaining to public services, including fire and police protection, parks, schools, and libraries. Information will be sought from West Covina Fire Department, West Covina Police Department, various school districts as well as obtained from the General Plan EIR as the baseline. • Transportation. Please see Task 5.2, above • Utilities and Service Systems. This section of the IS will discuss and analyze the potential impacts and implications the update to the Development Code could have pertaining to wet and dry utilities, including water, wastewater, storm drain, solid waste, electricity, natural gas, and communication. Information will be sought from the City, the Suburban Water Systems, Los Angeles County Sanitation Districts (LACSD), Main San Gabriel Groundwater Basin Watermaster, and Victorville Sanitary Landfill, and obtained from the General Plan EIR. • Wildfire. According to Cal Fire, for the Local Responsibility Area (LRA) lands, the City includes Very High Fire Hazard Severity Zones (VHFHSZs) within the City limit along the eastern boundary of the City extending into the middle within the southern half of the City. For the State Responsibility Area (SRA) lands, there are no fire hazard zones within the City limits. The fire hazard zones within the City will be identified and described in detail in the IS, and potential implications and impacts of the update to Development Code in terms of compatibility with these zones will be discussed. KTGY ARCHITECTURE + PLANNING SCOPE OF WORK Upon completion, the Administrative Draft IS will be submitted to the City for review and comment. Initial Study/Mitigated Negative Declaration for Distribution: Following review of the Administrative Draft IS/MND by the City, Psomas will revise the document to incorporate comments received. This task anticipates that comments received would require only one set of revisions. Psomas will then resubmit the document for final approval prior to distribution. The IS/MND will be submitted to the City for review before being prepared for distribution. Based on discussion with the City, if it is determined that the proposed Project will be submitted to the State Clearinghouse (SCH), a 30-day public review period will be required. Per the current requirement of the Office of Planning and Research (OPR), Psomas will post the IS/MND, including the appendices, the Notice of Intent (NOI), the Notice of Completion (NOC), and the State Clearinghouse (SCH) Summary Form on the SCH's website, and no hard copies will be submitted. Psomas will file the NOI to adopt an MND and the NOC with the County Clerk. A notice is also required to be published in local newspapers. It is assumed that Psomas will prepare the notice, but the City will post it at the Project site and submit it to the newspaper for publication. In addition to submittal to the SCH, CDs of the IS/MND and copies of the NOI will be provided to the City, decision makers, and agencies. Psomas will distribute the CDs using a distribution list to be provided by the City. Final Initial Study/Mitigated Negative Declaration: Once the public review period has ended, Psomas will coordinate with the City to review the comments received and develop an approach on how to address the comments. Preparation of responses to comments on an IS/MND is not required by CEQA but recommended to assist the City in the decision - making process. All environmental comments on the IS/MND will receive responses. The Response to Comments (RTC) document will be submitted to the City for review and then revised based on comments received and transmitted to the City. The City's decision - making body must consider the proposed IS/MND together with any comments received during the public review process. A total of 30 hours of technical staff time is assumed to prepare the RTC document. Should a large number of comments be received, the estimated budget for completing the RTC document may need to be revised and a budget augment requested. One round of review by the City is assumed for the Final IS/MND. Psomas will prepare the Notice of Determination (NOD) for the Project, which will be signed by the City upon certification of the IS/MND and action on the Project. Psomas will file the NOD with the County Clerk. This SOW does include payment of the filing fees, which will be provided at the time the NOD is filed. KTGY ARCHITECTURE + PLANNING SCOPE OF WORK 5.4 Mitigation Monitoring and Reporting Program Through the course of IS/MND preparation, if mitigation measures are identified, in compliance with Section 21081.6 of the California Public Resources Code, Psomas will prepare a Mitigation Monitoring and Reporting Program (MMRP). The MMRP will be prepared in matrixformat and will provide the timing and responsibility for each mitigation measure. It should be noted that, later during the public hearings, if the Planning Commission or City Council modify the Project and/or recommend standard conditions of approval/mitigation measures for the proposed Project, Psomas will revise the MMRP. However, substantial modifications to the MMRP are not assumed in the SOW and fees for this Project. Task 5 Work Products: Project Description, Draft and Final (electronic) Administrative Draft IS (electronic and up to three (3) hard copies) IS/MND (electronic and up to 10 hard copies for Planning Commission and City Council, and up to 30 copies on CDs for Agencies) IS/MND and Appendices, NOI, NOC, and SCH Summary Form to be Posted on the SCH Website (electronic) Preparation of Newspaper Notice Responses to Comments (electronic) Final/Certified IS/MND (electronic and up to two (2) hard copies) NOD (electronic) MMRP, Draft and Final (electronic) KTGY ARCHITECTURE + PLANNING performance of this Agreement and shall advise City of any changes in any laws that may affect Consultant's performance of this Agreement. Consultant shall keep itself informed of State and Federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Consultant shall at all times observe and comply with all such laws and regulations. City officers and employees shall not be liable at law or in equity for any claims or damages occurring as a result of failure of the Consultant to comply with this section. 1.3. Performance to Satisfaction of Citv. Consultant agrees to perform all the work to the reasonable satisfaction of the City. Evaluations of the work will be conducted by the City Manager or his or her designee. If the quality of work is not satisfactory, City in its discretion has the right to: (a) Meet with Consultant to review the quality of the work and resolve the matters of concern; (b) Require Consultant to repeat the work at no additional fee until it is satisfactory; and/or (c) Terminate the Agreement as hereinafter set forth. 1.4. Warranty. Consultant warrants that it shall perform the services required by this Agreement in compliance with all applicable Federal and California employment laws, including, but not limited to, those laws related to minimum hours and wages; occupational health and safety; fair employment and employment practices; workers' compensation; and all other Federal, State and local laws and ordinances applicable to the services required under this Agreement. 1.5. Non-discrimination. In performing this Agreement, Consultant shall not engage in, nor permit its agents to engage in, discrimination in employment of persons because of their race, religion, color, national origin, ancestry, age, physical or mental disability, medical condition, genetic information, pregnancy, marital status, sex, gender, gender identity, gender expression, sexual orientation, or military or veteran status, except as permitted pursuant to Section 12940 of the Government Code. 1.6. Non -Exclusive Agreement. Consultant acknowledges that City may enter into agreements with other consultants for services similar to the services that are subject to this Agreement or may have its own employees perform services similar to those services contemplated by this Agreement. 1.7. Confidentiality. Employees of Consultant in the course of their duties may have access to financial, accounting, statistical, and personnel data of private individuals and employees of City. Consultant covenants that all data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without written authorization by City. City shall grant such authorization if disclosure is required by law. All City data shall be returned to City upon the termination of this Agreement. Consultant's covenant under this Section shall survive the termination of this Agreement. 1.8. Public Records Act Disclosure. Consultant has been advised and is aware that this Agreement and all reports, documents, information and data, including, but not limited to, computer tapes, discs or files furnished or prepared by Consultant, or any of its subcontractors, 2 KTGY Group, Inc. Form Revised November 2020 SCOPE OF WORK TASK 6- DEVELOPMENT CODE ADOPTION 6.1 Public Hearing Preparation This scope of work assumes a full -service scope of work — meaning the KTGY will handle the production of all documents related to the public hearings. Public notices, staff reports, ordinances, and resolutions will be prepared by KTGY, in consultation and with input from the City. This task assumes that the City will provide the desired templates (if they have changed since we provided the same services for Queen of the Valley Specific Plan). 6.2 Public Hearing Attendance and Presentations Attend up to four (4) public hearings to present the project and respond to questions and concerns of the Planning Commission and City Council. Prepare presentation materials using text and graphics developed in the previous tasks. This task assumes that the City will introduce the item and turn it over to the Project team. If desired, the PowerPoint can be created by KTGY or we can use the City's template. KTGY and its team will work with the City to prepare a draft and final version of the PowerPoint for each public hearing. It is anticipated that the Planning Commission presentation will be detailed, whereas the presentation for City Council will be brief and highlight key topics and other sections Council would be interested in. 6.3 Quality Assurance Prepare a two (2)-hour presentation for City, highlighting key elements of the Development Code and answering questions. This presentation will be available for all City staff, but will be geared to those that use it most — Planning, Code Enforcement, etc. Also, approximately 2-3 months after the adoption of the Code, host a Q&A session highlighting any questions as a result of initial implementation of the Development Code Task 6 Work Products (in Electronic Format): Public Notices (two (2)— Planning Commission and City Council Staff Reports (four (4), Including Supporting Ordinances and Resolutions) Public Hearing Presentation Materials Task 6 Meetings: Up to Four (4) Public Hearings — Planning Commission and City Council Staff Presentation Post Implementation Q&A Session KTGY ARCHITECTURE + PLANNING PROJECT TIMELINE City of West Covina Mixed -Use Zoning Project Schedule . Code r Task 1: PROJECT MANAGEMENT 1.1 Project Kick-Off1.2 Project Management Task 2: BACKGROUND INFORMATION 2.1 Document Review and Zoning Code Audit 2.2 Zoning Code Parking Report Task 3: COMMUNITY OUTREACH 3.1 Develop Public Participation Plan (PPP) 3.2 Conduct Community Outreach Meetings 3.3 Community Outreach Collateral 3.5 Social Media Coordination 3.6 Community Outreach Summary Task 4: DEVELOPMENT CODE PREPARATION 4.1 Development Code Preparation 4.2 General Plan Amendments 4.3 Zoning Map Update 4.4 Informational Handouts, Applications, and Guides Task 5: CEQA DOCUMENTATION 5.1 Project Description 5.2 Technical Analyses 5.3 Initial Study/Mitigated Negative Declaration 5.4 Witigation Monitoring and Reporting Program Task 6: DEVELOPMENT CODE ADOPTION 6.1 Public Hearing Preparation 6.2 Public Hearing Attendance and Presentations 6.3 Quality Assurance* . To be contucted after formal completion of contract. KTGY ARCHITECTURE + PLANNING KTGY ARCHITECTURE + PLANNING cry �'• � � � �+. 't,f/ �j Y �- AIIII- - As s La Floresta Brea, CA �F - ATTACHMENT B The KTGY team is pleased to have the opportunity to work with the City of West Covina on this proposed project. We are pleased to submit the following fee proposal for the Development Code Update project. Task 1: Proiect Management 1.1 — Project Kick -Off $ 4,355 1.2 — Project Management $ 69,560 Task Total $ 73,915 Task 2: Background Information 2.1— Document Review and Zoning Code Audit $ 12,080 2.2 — Zoning Code Parking Report $ 8,375 Task Total $ 20,455 Task 3: Community Outreach 3.1 — Develop Public Participation Plan (PPP) $ 2,000 3.2 — Conduct Community Outreach Meetings $ 42,800 3.3 — Community Outreach Collateral $ 10,950 3.4 — Project Website $ 13,400 3.5 — Social Media Coordination $ 6,000 3.6 — Community Outreach Summary $ 12,700 Task Total $ 87,850 Task 4: Development Code Preparation 4.1 — Development Code Preparation $ 93,850 4.2 — General Plan Amendments $ 15,600 4.3 — Zoning Map Update $ 23,400 4.4 — Informational Handouts, Applications, and Guides $ 18,900 Task Total $151,750 Task 5: CEQA Documentation 5.1 — Project Description $ 2,590 5.2— Technical Analyses $ 33,500 5.3 — Initial Study/Mitigated Negative Declaration $ 58,811 5.4 — Mitigation Monitoring and Reporting Program $ 710 Task Total $ 95,611 KTGY ARCHITECTURE + PLANNING ATTACHMENT B Task 6: Development Code Adoption 6.1 — Public Hearing Preparation $ 19,300 6.2 — Public Hearing Attendance and Presentations $ 17,440 6.3 — Quality Assurance $ 0 Task Total $ 36,740 Proposed Labor Fee: $466,321 Proposed Reimbursable Expenses: $ 24,108 Overall Total Fee: $490,429 Notes: Tasks may occur concurrently. Fees are negotiable based upon the ultimate scope agreed upon between the City and the Consultant. Scope may be refined as necessary to achieve City goals while still meeting budgetary constraints. We propose to complete applicable work efforts on a "Time and Materials, Not to Exceed" basis, with a total labor fee not to exceed $466,321. This fee includes a "not to exceed" estimate for reimbursable expenses (e.g. printing costs, CEQA filing fees). Reimbursable expenses shall be charged at the cost invoiced to KTGY and shall not exceed $24,108. This is a maximum estimate for reimbursable expenses and the actual fee will likely be less. KTGY reserves the right to transfer fees between phases, provided that the total labor amount of $466,321 is not exceeded. KTGY ARCHITECTURE + PLANNING HOURLY RATE SCHEDULE EXHIBIT'N Level I: PRINCIPAL $340.00/Hour Level 11: PRINCIPAL $270.00/Hour (Associate Principal/Executive Director) Level III: DIRECTOR $220.00/Hou r (Production/Technical/Design/Planning) Level IV: SENIOR PROJECT MANAGER $190.00/Hour (Design/Planning/ Construction Administrator) Level V: PROJECT MANAGER $175.00/Hour (Design/Planning/ Business Development) Level VI: SENIOR JOB CAPTAIN $155.00/Hour (Senior Designer/Senior Planner/ Senior Graphic Designer) Level VII: JOB CAPTAIN $120.00/Hour (Job Captain/Designer/Planner/ Graphic Designer) LevelVill: PROJECT ASSOCIATE $1oo.00/Hour (Assistant Planner) Level IX: ADMINISTRATIVE STAFF $80.00/Hour KTGY ARCHITECTURE + PLANNING ENVIRONMENTAL SERVICES FEE SCHEDULE EFFECTIVE THROUGH 12/31/2021 CLASSIFICATION HOURLY BILLING RATES Principal -in -Charge $240—$265 Air Quality, Climate Change and Noise Manager $200—$220 Habitat Restoration Manager $195 Regulatory Permitting Manager $195 Senior Project Manager, Environmental $180—$230 Senior Environmental Planner $145—$195 Senior Restoration Ecologist $145—$180 Senior Project Manager/Biological Resources Manager $140—$195 Senior Archaeologist/Paleontologist $140—$150 Project Manager' $135—$160 Environmental Planner $130—$155 Regulatory Permitting Specialist $128—$155 Senior Field Technician' $125—$145 Certified Arborist $120—$160 Assistant Project Manager, Environmental $110—$150 Senior Biologist/Senior Ecologist $120—$155 Air Quality, Climate Change, and Noise Specialist $110—$145 Environmental Analyst $100—$135 Biologist $100—$135 Archaeologist/Paleontologist $90—$125 Field Technician2 $90—$125 GIS Manager $145—$155 Senior GIS Analyst $120—$145 GIS Specialist $95—$115 Graphic Artist $100—$125 Technical Writer/Editor $90—$120 Word Processor $100—$115 Project Assistant/Administrative Assistant $80—$100 REIMBURSABLE COSTS Mileage Federal Standard Mileage Rate Reprographics (Outside) at cost plus 10% Reprographics (Inside) Request Printing fee sheet Other Out-of-pocket Expenses at cost plus 10% Subconsultants at cost plus 10% Plotting: Color Bond $1.50 per sq ft Color Photo Gloss $2.50 per sq ft Aerial Maps: Fewer than 500 acres $200 Aerial Maps: 500-1,500 acres $350 Aerial Maps: Greater than 1,500 acres $500 Environmental Planning, Biological Resources and Cultural Resources 2 Air Quality/Climate Change/Noise Analysis, Biological Resources, and Cultural Resources y A u y 9 pursuant to this Agreement and provided to City may be subject to public disclosure as required by the California Public Records Act (California Government Code Section 6250 et seq.). Exceptions to public disclosure may be those documents or information that qualify as trade secrets, as that term is defined in California Government Code Section 6254.7, and of which Consultant informs City of such trade secret. The City will endeavor to maintain as confidential all information obtained by it that is designated as a trade secret. The City shall not, in any way, be liable or responsible for the disclosure of any trade secret including, without limitation, those records so marked if disclosure is deemed to be required by law or by order of the court. 2.0. COMPENSATION AND BILLING 2.1. Compensation. Consultant shall be paid in accordance with the fee schedule set forth in Exhibit A. Consultant's total compensation shall not exceed Four Hundred Ninety Thousand Four Hundred Twenty -Nine Dollars ($490,429.00). 2.2. Additional Services. Consultant shall not receive compensation for any services provided outside the scope of services specified in the Consultant's Proposal unless the City, prior to Consultant performing the additional services, approves such additional services in writing. It is specifically understood that oral requests and/or approvals of such additional services or additional compensation shall be barred and are unenforceable. Should the City request in writing additional services that increase the Scope of Services, an additional fee based upon the Consultant's standard hourly rates shall be paid to the Consultant for such additional services. Such increase in additional fees shall be limited to 25% of the total contract sum or to the maximum total contract amount of $25,000, whichever is greater. The Department Head or City Manager is authorized to approve a Change Order for such additional services. 2.3. Method of Billing. Consultant may submit invoices to the City for approval on a progress basis, but no more often than once a month. Said invoice shall be based on the total of all Consultant's services which have been completed to City's sole satisfaction. City shall pay Consultant's invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail the services performed, the date of performance, and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as "Additional Services" and shall identify the number of the authorized change order, where applicable, on all invoices. 2.4. Records and Audits. Records of Consultant's services relating to this Agreement shall be maintained in accordance with generally recognized accounting principles and shall be made available to City for inspection and/or audit at mutually convenient times from the Effective Date until three (3) years after the termination or expiration of this Agreement. 3.0. TIME OF PERFORMANCE 3.1. Commencement and Completion of Work. Unless otherwise agreed to by the parties, the professional services to be performed pursuant to this Agreement shall commence within five (5) days from the Effective Date of this Agreement. Said services shall be performed in strict compliance with the Project Schedule agreed upon by City and Consultant. The Project Schedule may be amended by mutual agreement of the parties. Consultant shall endeavor to complete the Scope of Services within twenty-five (25) months. Failure to commence work in a timely manner and/or diligently pursue work to completion may be grounds for termination of this Agreement. 3 KTGY Group, Inc. Form Revised November 2020 ORGANIZATIONAL CHART ■ KTGY Architecture+ Planning Staff CITY ■ PSOMAS Staff PRINCIPAL -IN -CHARGE DIRECTOR SR.PROJECT MANGER PROJECT MANAGER I I AIR QUALITY / GHG I I BIOLOGY TRANSPORTATION I I ARCHAEOLOGY POLICY KTGY ARCHITECTURE + PLANNING KEN RYAN Principal Education Bachelor of Science, Urban Planning California State Polytechnic University Pomona, CA Community Service City of Yorba Linda - Past Two -Term Mayor and Councilman - Past Planning Commissioner/Chairman - Past Parks & Recreation Commissioner/ Chairman Selected Affiliations Placentia Linda Hospital -Governing Board Member I Past Chairman Foothill/Eastern Transportation Corridor Agency -Past Board of Directors -Past Two Term Chairman Selected Presentations Elevating Design Through Public Involvement APA National Conference Project California Attorney General's State of California Roundtable That's Entertainment (Districts) ULI Denver Selected Publications "A Vision for Community - From Ancient Greece to Flying Cars" - EXPAND "Obtaining Community Consent - Top Ten Principles" Multi Housing News "Creative Urban Solutions'- Multifamily Trends "City Makeover" - BuilderNews Contact 949.812.1361 kryan@ktgy.com Ken Ryan has served as a leader on projects involving complex regeneration/ mixed -use development, large scale master plans, sustainable design, resort/ recreation plans, community participation programs and governmental coordination. Mr. Ryan oversees the firm's Community Planning and Urban Design Studio. Mr. Ryan is known for his leadership, strategic insight, creative thinking and communication skills. His experience overseeing projects from initial ideas to successful implementation provides him with and an understanding of the important interrelationship between marketplace, environmental setting, political sensitivities and design considerations. As a leading industry expert, Mr. Ryan is a sought after speaker and media resource for his insights and observations. He has been selected numerous times in Builder & Developer's "Who's Who in Homebuilding," was recognized as one of the 25 Most Influential People in North Orange County Magazine, and was one of three representatives from the United States invited to participate in an international roundtable discussion held at the SINO- International Real Estate Summit in Shanghai, China. He has guest lectured at USC, Cal Poly Pomona and UCI, published numerous articles regarding the planning profession and has participated in Orange County radio and television programs. Selected Project Experience Master Planning Richard Nixon Presidential Library Expansion Yorba Linda, CA Richard Nixon Foundation YokohlRanch Tulare Co., CA J.G Boswell Company La Floresta Brea, CA Chevron Land and Development Salado Creek Sports Town San Antonio, TX HollyHills Development Site Planning Melrose Heights Oceanside, CA California West Communities Soboba Town Center San Jacinto, CA Soboba Band of Luiseno Indians Urban Design Bolsa Row Westminster, CA I Westminster. LLC Anaheim Convention Center Plaza Anaheim, CA City of Anaheim Transit Oriented Development ARTIC Transit/Mixed-Use District Anaheim, CA City of Anaheim Commerce Executive Park Reston, VA Vornado / Charles E. Smith Resort Planning Desert Willow Resort Palm Desert, CA Palm Desert Golf Partners & City of Palm Desert Agua Caliente Resort and Casino Rancho Mirage, CA Agua Caliente Band of Cahuilla Indians Entitlement I Strategic Planning Chapman University Specific Plan & Campus Improvement Projects Orange, CA Chapman University Brewery X Anaheim, CA Brewery X JOHN MORELAND AICP Director, Planning Project Role: Project Manager/Policy Lead Education Masters of Urban and Regional Planning California State Polytechnic University, Pomona Pomona, CA Bachelor of Science, Business Administration Pepperdine University Malibu, CA Affiliations California Heights Neighborhood Association Long Beach, CA- Board Member American Planning Association, APA Community Service California Heights Neighborhood Association Long Beach, CA - Contributer,Writer for Bi-Monthly Newsletter California Heights Historic District Design Guidelines Long Beach, CA -Community Volunteer Contact 949.221.6216 jmoreland@ktgycom John Moreland oversees the entitlement processing and advance planning division of the CPUD studio at KTGY. He brings nearly 15 years of experience in managing, processing and coordinating entitlement and planning projects in over 80 jurisdictions throughout the western United States for both public and private sector clients. Using his extensive knowledge of development plans, entitlements, specific plans, environmental documents and zoning code research he provides valuable insight to each of his projects. As a well-rounded professional, Mr. Moreland's versatile expertise allows him to managecomplex development projects including, those that involve Specific Plans, general plan amendments, as well as zoning code amendments and design guidelines. He is also experienced in writing, preparing and processing policy documents and environmental documentation, as well as managing consultants that prepare this documentation. Selected Project Experience PubliclPrivate Partnerships 100-Acre Irvine, CA County of Orange/Lowe Enterprises West Alton Irvine, CA County of Orange/Lowe Enterprises Heritage Square Signal Hill, CA Signal Hill Petroleum Entitlement I Government Relations Rinker Health Science Campus Irvine, CA Chapman University Heritage Square Signal Hill, CA Signal Hill Petroleum Center for Science & Technology Orange, CA Chapman University Saddle Crest Homes Trabuco Canyon, CA Rancho Las Lomas Zoo & Event Center * Trabuco Canyon, CA Visioning I Public Outreach Specific Plan Amendment No. 7 Orange, CA Chapman University Terraces at Walnut Specific Plan Walnut, CA Sunjoint Development, LLC Specific Plans I Development Plans Queen of the Valley Specific Plan West Covina, CA City of West Covina Pepper Avenue Specific Plan Rialto, CA City of Rialto 100-Acre and West Alton Development Plans Irvine, CA County of Orange The Commons Specific Plan Claremont, CA Clare Properties, LLC Residences at Five Creek Development Plan Rohnert Park, CA MJW Investments, LLC Walnut Esplanade Specific Plan Walnut, CA Olson Company Hollywood Park Specific Plan* Inglewood, CA Hollywood Park Land Company LORA KENNEDY Senior Project Manager, Planning Education Bachelor of Arts, History University of California, Los Angeles Contact 949.567.3494 ext. 1494 Ikennedy@ktgy.com 101 N Aroh1tect +Phnnlnp Lora Kennedy has over 20 years of diverse experience in land use planning, policy development, entitlement processing , and design guidelines. She has been involved in a variety of public and private sector projects, including master planned communities, mixed -use infill development, campus improvements, community relations, community relations, resort and entertainment destinations. Ms. Kennedy excels at project management, client and consultant team coordination, and preparation and processing of specific plans, master plans, design guidelines, and other planning and entitlement documents. Selected Project Experience Entitlement I Specific Plans Fanita Ranch Santee, CA HomeFed Corporation YokohlRanch Tulare County, CA J.G. Boswell Company Chapman University Orange, CA Chapman University Brea 265 Brea, CA Aare Energy Bolsa Row Westminster, CA I Westminster, LLC Lytle Creek Ranch Rialto, CA Lytle Development Company Serrano Summit Lake Forest, CA Lewis Operating Corp. Arantine Hills Corona, CA Bluestone Communities Village One/Walkup Ranch Lincoln, CA Lake Development Group Master Plans ARTIC Transit/Mixed-Use District Anaheim, CA City of Anaheim The Experience at Gene Autry Way Anaheim, CA New Urban West Anaheim Resort Hotel & Spa Anaheim, CA Lake Development Group Design Guidelines Pavilion Park at Great Park Neighborhoods Irvine, CA Five Point Beacon Park at Great Park Neighborhoods Irvine, CA Five Point Parasol Park at Great Park Neighborhoods Irvine, CA Five Point Cadence Park at Great Park Neighborhoods Irvine, CA Five Point Novel Park at Great Park Neighborhoods Irvine, CA Five Point Rise at Great Park Neighborhoods Irvine, CA Five Point District One at Valencia Valencia, CA Five Point Rancho Miramonte at The Preserve Chino, CA Trumark Companies Menifee Valley Menifee, CA Brookfield Residential New Haven at New Model Colony Ontario, CA Brookfield Residential JIHAD OTHMAN Project Manager, Planning Education Master of Public Administration Cal State San Bernardino San Bernardino, CA Bachelor of Science in Urban & Regional Planning Cal Poly Pomona Pomona, CA Contact 949.221.6219 jothman@ktgy.com Jihad Othman brings over ten years of experience in the development industry working both in the public and private sector with high level entitlement and permitting experience. Having worked for the city of Covina, city of West Covina, private permit expediting organizations as well as architectural and engineering firms with experience from both sides of the permit counter at a variety of different jurisdictions, Ms. Othman has gained expert abilities in navigating and interpreting municipal zoning ordinances and building codes, conducting public meetings and presenting at public hearings. This insight and experience allow for the ability to craft unique solutions to resolve policy issues. Ms. Othman's extensive, versatile expertise includes completing due diligence and permitting for a diverse collection of major commercial retailers ranging from small tenant improvements to new construction and remodels of retail super -centers, shopping malls, fuel stations and auto dealerships. With Ms. Othman's diverse background, she provides a deep understanding of the development process, from initial concept to planning through permitting. Selected Project Experience Multifamily OC PACE Anaheim, CA Innovative Integrated Health Casa Paloma Midway City, CA American Family Housing Commercial EchoPark Automotive* Nashville, TN Sonic Automotive Poway Honda* Poway, CA Sonic Automotive Subaru Fresno* Fresno, CA Lithia Motors Retail Walmart Supercenter** Nationwide Walmart Starbucks North California Region Starbucks Clean Energy Fuel Stations Nationwide Clean Energy 38 38 * Project completed by WD Partners for its client while Jihad Othman was a Project Manager **Project completed by WD Partners for its client while Jihad Othman was a Permit Manager PSOMAS Alia HOW, AICP Senior Project Manager Alia Hokuki is a Senior Project Manager with 24 years of experience in the environmental and policy planning field with a focus on environmental impact assessments for public and private sector clients. Alia's expertise includes the preparation, management, and peer review of environmental compliance documents pursuant to the CEQA and NEPA. She has managed and prepared a number of CEQA and NEPA documents for a variety of projects, including mixed - use; urban infill and redevelopment; commercial and retail; high - density residential and planned communities; institutional (including universities and healthcare); and infrastructure projects. She has EDUCATION extensive knowledge of CEQA and NEPA, and planning and zoning 1996/Masters of Urban Planning/ law. University of California, Irvine 1991/BA/Development Studies/ Experience University of California, Los Angeles Newport Village Mixed -Use Project Environmental Impact Report, Newport Beach, CA: Project Manager for the project, which involves demolishing CERTIFICATIONS existing structures and redeveloping the project site as a mixed -use American Institute of Certified development encompassing approximately 9.4 acres on the north and Planners/#112796/American south sides of the West Coast Highway within the City of Newport Beach's Planning Association Mariners' Mile corridor. The project consists of 14 residential condominium PROFESSIONAL units on the South Parcel and 108 apartment units on the North Parcel and AFFILIATIONS 128,640 SF of nonresidential floor area. The project also includes a new American Planning Association\ publicly accessible waterfront promenade. Association of Environmental Magnolia Tank Farm Specific Plan Environmental Impact Report, Huntington Professionals Beach, CA: Project Manager for this project which proposes redevelopment Society of American Military of the 29-acre site (within the coastal zone) with a mixed -use redevelopment Engineers consisting of a 230,000 SF lodge and ancillary resident- and visitor -serving retail and dining; up to 250-unit for -sale residential village; 2.8 acres of FuturePorts Coastal Conservation area adjacent to Magnolia Marsh; and 2.8 acres of EXPERIENCE park. In addition, the Specific Plan designates the area adjacent to Magnolia With Psomas for 4 years; with Street as Open Space Park along the project sites entire eastern boundary. other firms for 18years Mission Viejo General Plan Update Program Environmental Impact Report, Mission Viejo, CA: Senior Project Manager for the project. The EIR analyzed the impacts related to the comprehensive update of the General Plan's Land Use, Conservation/Open Space, and Circulation elements in addition to managing preparation of a Sustainability Action Plan. El Toro,100-Acre Parcel Development Plan Project Environmental Impact Report, Irvine, CA: Project Manager for this project located in the City of Irvine at the southern edge of the former Marine Corps Air Station El Toro k. The project proposes a mixed -use, low -impact development, in addition to parks and trails with 2,103 residential units,1.8 million SF of office, 220,000 SF of retail, and a 242-room hotel in addition to parks and trails. The Queen of the Valley Hospital Specific Plan Program Environmental Impact Report, West Covina, CA: Senior Quality Assurance/Quality Control Manager for an EIR for a Specific Plan for the Queen of the Valley Hospital in West Covina. The project involves expansion of existing and development of new hospital facilities over four phases of development. PSOMAS Tin Cheung Air Quality/GHG/Energy/NoiseNibration Manager Tin Cheung has 25 years of experience conducting air quality, climate change, noise, and vibration studies for CEQA and NEPA compliance. His experience includes preparing air pollutant emissions inventories, dispersion modeling, climate change, and health risk t assessments (HRAs) using a variety of computer data models. He is also proficient in conducting noise and vibration studies for stationary and mobile sources. He has employed monitoring equipment for the measurement of noise, vibration, and particulate matter. Tin's project experience includes analyses of land uses, including large-scale infrastructure, residential, commercial, industrial, educational, energy, EDUCATION and recreational uses. He has extensive knowledge of the CEQA/ 1993/BA/Geographyand Environmental Studies/University NEPA regulatory process and impact assessment methods established of California, Santa Barbara by USEPA, the California Air Resources Board (CARB), and local air quality management districts. PROFESSIONAL AFFILIATIONS Experience Association of Environmental San Gabriel Plaza Project Air Quality and Greenhouse Gas Emissions Professionals Analysis, San Gabriel, CA: Air Quality/GHG and Noise Manager for an EIR EXPERIENCE for the San Gabriel Plaza Project. The mixed -use development proposed With Psomas for 2 years; with for the project includes 163 one- to two -bedroom condominiums, other firms for23 years 28,655 SF of commercial (retail/restaurant uses), a community center, and 585 parking spaces within three subterranean levels on a 3.59- acre lot. Special consideration of impacts to sensitive receptors, located directly adjacent to the project site, were made due to the demolition of eleven buildings and grading activities at the project site during the three -phased project schedule. Magnolia Tank Farm Specific Plan Environmental Impact Report, Huntington Beach, CA: Air Quality/GHG and Noise Manager for the project which proposes redevelopment of the 29-acre site (within the coastal zone) with a mixed -use development consisting of a 230,000 SF lodge that includes a maximum of 175 guest rooms and guesthouse -style, budget -oriented, family/ group overnight accommodations with 40 beds, and ancillary resident- and visitor -serving retail and dining; up to 250-unit for -sale residential village; 2.8 acres of Coastal Conservation area adjacent to Magnolia Marsh; and 2.6 acres of park. Oak Knoll 88 Residential Project, Pasadena, CA: Air Quality/Greenhouse Gas and Noise/Vibration Manager for the technical studies for a 0.82-acre lot with the development of an 83,802 SF, seven -story mixed -use building with 72 residential units, 5,365 SF of commercial space, and 173 parking spaces within three subterranean parking levels. These studies involved the assessment of regional and localized impacts based on coordination with the developer and City planning staff. Catalina 170 Housing Condominium Project, Pasadena, CA: Air Quality/ GHG Manager for the proposed 16,965-SF, four-story residential building with nine units and 20 parking stalls within the 9,216 SF subterranean parking level located at 170 North Catalina Avenue in the City of Pasadena. Existing development on the project site includes three residential structures totaling 3,100 SF, which would be demolished to allow for construction of the proposed project. Potential air quality and greenhouse gas emission impacts associated with the project in pursuant to CEQA were prepared. PSOMAS Darlene Danehy, PE, TE, PTOE, ENV SP LEED AP Transportation Engineer Darlene Danehy is a Registered Professional Engineer in Arizona (civil) and California (traffic) and is a certified Professional Traffic Operations Engineer (PTOE). She has extensive experience with a variety of traffic engineering projects, including traffic impact studies, traffic reports, safety studies, signal warrant studies, corridor studies, signal timing and coordination, signing and striping design, and traffic signal design. Darlene has also prepared and overseen numerous traffic studies pursuant to CEQA and NEPA in southern California for both public and private projects. She also has experience with design and studies for alternate modes of travel, Road Safety Assessments, transportation REGISTRATION planning, and roadway design. Darlene is well -versed in Synchro, 2017/CA/Traffic Engineer/2827 SimTraffic, HCS, SIDRA, and GIs, and has experience with AutoCAD, 2009/AZ/Professional Engineer/ MicroStation, and InRoads. Civil/50215 Experience EDUCATION 2006/MS/Civil Engineering/Cornell Huntington Plaza Mixed -Use Project, Arcadia, CA: Transportation Engineer University for the preparation of an Initial Study/MND. The project site includes 2.1 acres 2004/BS/Civil Engineering/ located adjacent to the Metro's Gold Line Railroad which is fully developed University of Arizona with urban land uses. The project would develop 170 residential units, 2,290 SF of clubhouse,12,600 SF of ground -level retail land uses, and one level of CERTIFICATIONS subterranean parking. The property is covered by the Downtown Parking Professional Traffic Operations Overlay and is located within both the Downtown Mixed Use (DMU) zone and Engineer/Transportation the Central Business District (CBD) zone with the Downtown Overlay. Professional Certification Board Inc. Newport Village Mixed -Use Project Environmental Impact Report, Newport Beach, CA: Transportation Engineer for the project, which involves demolishing Envision Sustainability existing structures and redeveloping the project site as a mixed -use Professional/Isfor t Sustainable Infrastructure development encompassing approximately 9.4 acres on the north and south sides of the West Coast Highway within the City of Newport Beach's Mariners' LEED Accredited Professional/U.S. Mile corridor. The project consists of 14 residential condominium units on the Green Building Council South Parcel and 108 apartment units on the North Parcel and 128,640 SF of PROFESSIONAL nonresidential floor area. The project also includes a new publicly accessible AFFILIATIONS waterfront promenade and 827 parking spaces. Institute of Transportation Inglewood Oil Field Specific Plan Project Environmental Impact Report, City Engineers of Culver City, CA: Transportation Engineer for the preparation of an EIR for a American Society of Civil Specific Plan that sets forth safeguards and regulations on oil and gas extraction Engineers activities in Culver City. The project site is adjacent to the Newport -Inglewood Fault, and up to 30 new wells would be allowed (along with associated storage EXPERIENCE tanks and pipelines), with requirements and restrictions to ensure the health With Psomas for 14 years and safety of the surrounding residential, recreational, and commercial land uses. Mt. San Antonio College, EIR for the Educational Facilities Master Plan and Parking and Circulation Master Plan (PCMP), Walnut, CA: Transportation Engineer responsible for a traffic study in support of the EIR for the EFMP and PCMP for Mt. SAC. The traffic study includes 27 intersections in five jurisdictions, as well as six Caltrans ramp intersections. Loker Medical Arts Pavilion Traffic Study, Los Angeles, CA: Transportation Engineer for a traffic study for the construction of a 65,000 SF medical office building adjacent to the California Medical Center. The report analyzed traffic impacts to more than 10 intersections in downtown Los Angeles, including several ramps on and off 1-10 and 1-110. The Critical Movement Analysis method was used to evaluate the need for mitigation at the study intersections. PSOMAS Amber Heredia Senior Biologist Amber Heredia is a Senior Project Manager and Senior Biologist with 23 years of experience in the preparation of Biological Technical Reports to meet the requirements of the FESA, CESA, CEQA, NEPA, and the CWA. Amber has a wide range of knowledge on the plants, wildlife, and vegetation communities of Southern California, especially those listed as Threatened or Endangered. Amber has experience preparing Biological Technical Reports; Biological Constraints Reports; Biological Resources Reports; Focused Survey Reports; Biological Assessments; Natural Environment Studies (NESs) and Natural Environment Studies (Minimal Impact [MI]) for Caltrans; Biological Assessments/ EDUCATION Biological Evaluations (BA/BE) and Management Indicator Species 2005/MS/Biology/University of (MIS) Reports for the U.S. Forest Service (USFS), Habitat Assessments; California, Riverside and Determination of Biologically Equivalent or Superior Preservation 1998/BS/Ecology and Evolution/ (DBESP) Reports for the Western Riverside County MSHCP. University of California, Santa Barbara Experience 1998/BS/Environmental Studies/ Metropolitan Transportation Authority's Regional Connector Transit Corridor University of California, Santa Barbara Project, Various Pre -Construction Nesting Bird Surveys, Los Angeles, CA: Biological Resources Manager for several pre -construction nesting bird surveys CERTIFICATIONS related to this project. The project will construct a 1.9-mile light rail line Principal r Ps that will extend services between the Gold Line Light Rail Transit lines from EntiInvty SScienttor ific ding CDFW Entity Scientific Collecting Pasadena and East Los Angeles to the Blue Line (to Long Beach) and to the new Perm iVS C-190240016/California Expo Line to Culver City, with the provision of new tracks through downtown Department of Fish and Wildlife Los Angeles mainly within twin tunnels. Amber oversaw the nesting bird 10(a)(1)(A) Permit for coastal surveys prior to the removal of any trees; preparation of memos documenting California gnatcatcher, survey results; and follow-up monitoring of active nests if required. southwestern willow flycatcher, Agoura Hills Road Widening Project, Agoura Hills, CA: Project Manager for this and yellow -billed cuckoo/TE- project, the widening of Agoura Hills Road from approximately Reyes Adobe 148554-5/U.S. Fish and Wildlife Road to Kanan Road. The project also included the addition of a bike path and Service repairs and slope stabilization on Canwood Street. Amber oversaw preparation of a Jurisdictional Delineation Report that evaluated project impacts on PROFESSIONAL jurisdictional resources. AFFILIATIONS Urban Land Institute Orange El Toro,1OO-Acre Parcel Development Plan Project Environmental Impact County/Inland Empire Report, Irvine, CA: Biological Resources Manager for this project located in Sea &Sage Audubon Society the City of Irvine at the southern edge of the former Marine Corps Air Station El Toro. The project proposes a mixed -use, low -impact development, which American Ornithological Society proposes 2,103 residential units,1.8 million SF of office, 220,000 SF of retail, Southern California Botanists parks, trails, and a 242-room hotel. Amber managed vegetation mapping; The Wildlife Society general plant and wildlife surveys; and focused surveys for special status California Native Plant Society plant species, coastal California gnatcatcher, least Bell's vireo, and western burrowing owl on all three parcels. She also oversaw focused surveys for EXPERIENCE roosting bats and preparation of a jurisdictional delineation. With Psomas for 21 years; with Park to Playa Trail Project Initial Study/Mitigated Negative Declaration, other firms for 2 years Baldwin Hills, CA: Biological Resources Manager for the Park to Playa Trail that would connect the parks and open spaces in the Baldwin Hills area to the Pacific Coast. The Park to Playa Trail would be an approximate seven -mile system of walking, hiking, and bicycle trails in parks and open space areas owned and operated by various State, County, and City agencies. Amber oversaw biological survey efforts including vegetation mapping, general plant and wildlife surveys, and focused surveys for special status plants and coastal California gnatcatcher. Charles Cisneros, MS, RPA Senior Archaeologist PW ~ II EDUCATION 2008/MS/European Archaeology/ University of Edinburgh, United Kingdom 2004/BA/Anth ropology/California State University, Los Angeles CERTIFICATIONS Registered Professional Arc haeolog ist/28575983/Register of Professional Archaeologists Orange County Certified Archaeologist/Orange County Riverside County Certified Archaeologist/Riverside County EXPERIENCE With Psomas for 2 years; with other firms for 13 years PSOMAS Charles Cisneros is a registered professional archaeologist with is years of experience in archaeological assessment and field experience in California and Nevada. He has directed numerous field projects in support of compliance with the California Environmental Quality Act (CEQA), the National Environmental Policy Act (NEPA), and Sections 106 and 110 of the National Historic Preservation Act (NHPA). Charles has managed a wide range of projects involving archaeological survey, testing, data recovery, monitoring, and laboratory analysis. He is skilled at research and data management, as well as maintaining and organizing digital and print publications. His training and background meet the U.S. Secretary of the Interior's Professional Qualifications Standards for prehistoric and historic archaeology. Experience Glendale -Hyperion Complex of Bridges Improvement Project, Los Angeles, CA: Senior Archaeologist for the Project Report (PR) and Plans, Specifications, and Estimate (PS&E) for rehabilitation of this complex of six bridges. Improvements include widening the Glendale Boulevard bridges; realigning the 1-5 northbound off -and on -ramps and Los Angeles River bike path; adding a median barrier on the Hyperion Avenue Viaduct, designing retaining walls, traffic signals, drainage system improvements, and infiltration basins; and improving pedestrian facilities including the Red Car pedestrian bridge and the Sunnynook pedestrian loop trail. NorthLake Specific Plan Supplemental Environmental Impact Report, Los Angeles County, CA: Senior Archaeologist for preparation of environmental documentation for development of an approximate 1,330-acre project site near Castaic Lake in unincorporated Los Angeles County. This project involves development of a mix of single-family units; multi -family units; commercial, industrial, and recreational uses; open space and trails; and school and park facilities. LACMA Parking Structure Project, Los Angeles, CA: Lead Archaeologist for paleontological and cultural resources monitoring during construction of the Los Angeles County Museum of Art parking structure. His responsibilities included checking the site for fossils of both extinct mega -fauna and prehistoric artifacts, supervising the field crews, preparing daily monitoring logs, excavating Pleistocene mega -fauna, advising construction crews and the client, and attending to project engineering details. 2nd Street and Pacific Coast Highway Retail Center, Long Beach, CA: Senior Archaeologist for this 10-acre site development. This retail complex area features a mix of upscale lifestyle tenants, restaurants, entertainment, local shops and gourmet grocery. Psomas also provided offsite improvements and coordination for Marina Drive revitalization, 2nd Street, and Pacific Coast Highway street widening, sidewalk, storm drain, driveway, striping, and traffic signal improvements. 3.2. Excusable Delays. Neither party shall be responsible for delays or lack of performance resulting from acts beyond the reasonable control of the party or parties. Such acts shall include, but not be limited to, acts of God, fire, strikes, material shortages, compliance with laws or regulations, riots, acts of war, or any other conditions beyond the reasonable control of a party. If a delay beyond the control of the Consultant is encountered, a time extension may be mutually agreed upon in writing by the City and the Consultant. The Consultant shall present documentation satisfactory to the City to substantiate any request for a time extension. 4.0. TERM AND TERMINATION 4.1. Term. This Agreement shall commence on the Effective Date and continue through March 31, 2024, unless previously terminated as provided herein or as otherwise agreed to in writing by the parties. 4.2. Notice of Termination. The City reserves and has the right and privilege of canceling, suspending or abandoning the execution of all or any part of the work contemplated by this Agreement, with or without cause, at any time, by providing at least fifteen (15) days prior written notice to Consultant. In the event of such termination, Consultant shall immediately stop rendering services under this Agreement unless directed otherwise by the City. If the City suspends, terminates or abandons a portion of this Agreement such suspension, termination or abandonment shall not make void or invalidate the remainder of this Agreement. If the Consultant defaults in the performance of any of the terms or conditions of this Agreement, it shall have ten (10) days after service upon it of written notice of such default in which to cure the default by rendering a satisfactory performance. In the event that the Consultant fails to cure its default within such period of time, the City shall have the right, notwithstanding any other provision of this Agreement, to terminate this Agreement without further notice and without prejudice to any other remedy to which it may be entitled to at law, in equity, or under this Agreement. The City also shall have the right, notwithstanding any other provisions of this Agreement, to terminate this Agreement, at its option and without prejudice to any other remedy to which it may be entitled to at law, in equity, or under this Agreement, immediately upon service of written notice of termination on the Consultant, if the latter should: a. Be adjudged a bankrupt; b. Become insolvent or have a receiver of its assets or property appointed because of insolvency; C. Make a general assignment for the benefit of creditors; d. Default in the performance of any obligation or payment of any indebtedness under this Agreement; e. Suffer any judgment against it to remain unsatisfied or unbonded of record for thirty (30) days or longer; or f. Institute or suffer to be instituted any procedures for reorganization or rearrangement of its affairs. KTGY Group, Inc. Form Revised November 2020 15, Row Specifi CA rN 0-1 gp� FIRM PROFILE Founded in 1991, KTGY Architecture + Planning is a leading full - service planning and design firm focused on residential, mixed -use, and commercial developments as well as creating a sense of place with all of our projects. KTGY seamlessly delivers innovation, artistry, and attention to detail across multiple studios, ensuring that clients and communities get the best no matter the building type or location. KTGY's architects and planners combine big picture opportunities, leading -edge sustainable practices, and impeccable design standards to create memorable destinations of enduring value. KTGY serves clients worldwide from six office locations including Chicago, Denver, Irvine, Los Angeles, Oakland, and Tysons (Virginia). KTGY ARCHITECTURE + PLANNING OUR VISION To Move the Discourse of Architecture & Planning Forward by Continuously Searching for Better. rl ' I. !ice ► ? '" _ ``� � f3� Al d flies x '•.`-tom �� By the Numbers: 29 Years since we opened our doors for business 7 CitieslCounties for Which KTGY Has Provided On Call Planning `��=Services ice" States in which '~ IL we have worked 125 Projects for Public Clients 333 Staff members in six offices located in growing metropolitan areas i Ranking in the 2019 Architecture Record Top 300 Architecture Firms 720 Awards won KTGY MAPS US Office locations Chicago, IL Oakland, CA � Denver, CO Tysons, VA Los Angeles, CA Irvine, CA States in which we have worked MA II T T KTGY ARCHITECTURE + PLANNING Firm Information Psomas, a California corporation, was founded in Southern California in 1946 and has grown into a full -service firm with 578 employees in 12 fully staffed offices throughout California, Arizona and Utah. Our firm specializes in transportation engineering, environmental consulting, survey, geographic information systems (GIS), site development, water and wastewater engineering, public works engineering, and construction management and inspection. Ranked nationally among ENR's Top 150 Engineering Firms, Psomas has achieved an award -winning reputation for innovation, creativity, and cutting -edge technical expertise. The cornerstone of our business approach is to focus on our clients' long-term needs and guide our strategic growth to meet those needs. Psomas' professional staff of industry leaders produces cost-effective and award -winning projects incorporating innovation, creativity, sustainability, and cutting edge technical expertise. For our environmental services, our mission is to meet our clients' needs by offering environmental consulting services and technically sound documentation. Psomas' experience and in-depth knowledge of the regulatory environment and CEQA and NEPA updates and case law facilitates preparing environmental documents that are legally defensible with analyses and findings that are supported by substantial evidence. Psomas' Environmental staff provides CEQA and NEPA documentation and analysis. Our in-house technical experts are qualified to prepare and peer review a wide range of CEQA and NEPA documents and technical studies. Our in-house staff has the expertise to prepare technical studies on environmental topics, including air quality, greenhouse gas (GHG) emissions, biological resources, cultural resources, energy, noise, tribal cultural resources, transportation studies, mapping and spatial analyses; as well as water and wastewater infrastructure engineering design, water supply assessment, hydrology/hydraulics, and water quality management plans (WQMP). -A ..,.e k RELEVANT E RI`t' 1 "r 100-ACRE PARCEL & WEST ALTON Project Manager: John Moreland DEVELOPMENT PLANS Director, Planning �1 jmoreland@ktgy.com Irvine, CA 949.221.6216 ...I County of Orange Architecture+Planning J l Typology The 100-Acre Parcel is a phased mixed -use development of approximately 108 acres Planning I Entitlement and the West Alton Parcel consists of approximately 32 acres - both located in the & Government Relations City of Irvine, California. The sites, part of the former Marine Corps Air Station, are located adjacent to the Orange County Great Park. The 100-Acre Parcel consists of Master Planning a public -private partnership between the County of Orange and Lowe Enterprises Services and involves adaptive reuse of the former West Coast Commissary Complex. This old warehouse building will serve as the heart and soul of a new mixed -use Development Plan community, which will include retail uses, offices, a hotel, and 3-5 story residential/ Project Management mixed -use buildings in a dynamic transit -oriented setting unique to Orange County. Visioning Land Use Planning For these projects, KTGY conducted numerous zoning studies, including, but not Urban Design limited to, a comprehensive density/intensity analysis for various uses within the City of Irvine. Due to unique agreements in place for this property, the Facts property lacked formal zoning requirements. Part of KTGY's scope included a "Development Plan" document for both sites. The Development Plan functions as a Area: +108 AC standalone zoning code and includes a vision; design guidelines; and streamlined, Office: 1,876,000 sq. ft. comprehensive, and easy to interpret development standards (including details such as signage, wireless facilities, performance -based uses). Being in the City of Irvine Retail: 220,000 sq. ft. but intended to be implemented by the County of Orange staff, the Development Plans were designed to blend City of Irvine standards and requirements with County High Density Res: 2,103 du of Orange permitting procedures. Furthermore, the Development Plan includes Hotel :242 Rooms new processing requirements, inclusive of the creation of a new reviewing body to hold hearings for project developments, new findings, and appeals procedures. Project Approval Date:11/14/17 KTGY was also involved in assisting with the environmental document review. On Project Duration: 2011-2017 November 14, 2017, the Orange County Board of Supervisors approved the 100-Acre Development Plan document and certified the Environmental Impact Report. On November 14, 2017, the Orange County Board of Supervisors approved the 100-Acre Development Plan document and certified the Environmental Impact Report. On June 6, 2018, the Orange County Board of Supervisors approved the West Alton Parcel Development Plan document and certified the Environmental Impact Report. QUEEN OF THE VALLEY SPECIFIC PLAN West Covina, CA City of West Covina Project Manager: John Moreland Director, Planning •] 1 jmoreland@ktgy.com 949.221.6216 ...I Architecture+Planning Typology The City of West Covina selected Psomas and KTGY Architecture + Planning to work Planning Entitlement with Citrus Valley Health Partners (now Emanate Health) to update and modernize Government Relations the nearly 30-year old Queen of the Valley Specific Plan and to allow for future improvements on this important medical campus in the City. In partnership with the Services City of West Covina and Psomas, KTGY worked with Emanate Health to assess the future needs of the campus as well as potential outcomes for meeting mandated OSHA Specific Plan requirements. KTGY also led community outreach meetings for the Specific Plan, where Contract Planner it was determined that design guidelines, pedestrian connectivity, and wayfinding Community Outreach were all important elements to stakeholders. After working with neighboring property Hearing Reports owners, KTGY developed a comprehensive Specific Plan that responds to the needs of the community, stakeholders, the City, as well as the hospital. KTGY also acted Facts as the Contract Planner for this project, including mailing all the public notices, Site Area: 28.79 ac and maintaining the public notification list, preparing the necessary staff reports, Project Duration: 2018-Present resolutions, and ordinances for the project, as well as preparing presentation materials for the public hearings. 4.3. Compensation. In the event of termination, City shall pay Consultant for reasonable costs incurred and professional services satisfactorily performed up to and including the effective date of the City's written notice of termination, within forty-five (45) days after the effective date of the notice of termination or the final invoice of the Consultant, whichever occurs last. Compensation for work in progress shall be prorated based on the percentage of work completed as of the effective date of termination in accordance with the fees set forth herein. 4.4. Documents. In the event of termination of this Agreement, all documents prepared by Consultant in its performance of this Agreement including, but not limited to, finished or unfinished design, development and construction documents, data studies, drawings, maps and reports, shall be delivered to the City within ten (10) days of the effective date of the notice of termination, at no cost to City. 5.0. INSURANCE 5.1. Minimum Scope and Limits of Insurance. Consultant shall obtain, maintain, and keep in full force and effect during the life of this Agreement all of the following minimum scope of insurance coverages with an insurance company authorized to do business in California, with a current A.M. Best's rating of no less than A:VII, and approved by City: (a) Broad -form commercial general liability, including premises -operations, products/completed operations, broad form property damage, blanket contractual liability, independent contractors, personal injury or bodily injury with a policy limit of not less than Two Million Dollars ($2,000,000.00), combined single limits, per occurrence. If such insurance contains a general aggregate limit, it shall apply separately to this Agreement or shall be twice the required occurrence limit. (b) Business automobile liability for owned vehicles, hired, and non -owned vehicles, with a policy limit of not less than One Million Dollars ($1,000,000.00), combined single limits, per accident for bodily injury and property damage. (c) Workers' compensation insurance as required by the State of California, with Statutory Limits, and Employer's Liability Insurance with a limit of no less than One Million Dollars ($1,000,000.00) per accident for bodily injury or disease. Consultant agrees to waive, and to obtain endorsements from its workers' compensation insurer waiving subrogation rights under its workers' compensation insurance policy against the City, its officers, agents, employees, and volunteers for losses arising from work performed by Consultant for the City and to require each of its subcontractors, if any, to do likewise under their workers' compensation insurance policies. By execution of this Agreement, the Consultant certifies as follows I am aware of, and will comply with, Section 3700 of the Labor Code, requiring every employer to be insured against liability of Workers' Compensation or to undertake self-insurance before commencing any of the work. KTGY Group, Inc. Form Revised November 2020 THE TERRACES AT WALNUT SPECIFIC PLAN Project Manager: John Moreland Walnut, CA Director, Planning ., 1 Sunjoint Development, LLC jmoreland@ktgy.com 949.221.5215 .mod Architecture+Planning Typology Single Family Detached I Multifamily I Retail Services Site Planning Entitlement Government Relations Community Outreach Specific Plan Facts Density: 11.5 du/ac Number of Units: 240 du Site Area: 49.0 ac Retail: 50,000 sq. ft. Project Duration: 2014-2020 KTGY's CPUD studio established a vision for the project site, conducted community outreach, and developed guiding principles for likely the largest undeveloped property in Walnut slated for development, The Terraces at Walnut. The most substantial challenges are is the hill in the center of the site and the sensitive context of the site, given the existing, adjacent single-family residential. Rather than grade the top of the 200-foot hill to create a fiat pad, the design created two terraces for housing, minimizing the grading impact and allowing for implementation of higher -density housing. The result is a master planned community of 240 single -family detached homes, 270 townhomes/fiats and 50,000 square feet of retail and restaurant space linked by a "String of Pearls," interconnected pocket parks. As part of the community outreach sessions, KTGY utilized Turning Point technology, an instantaneous polling software where project feedback from the surround community was obtained. KTGY also developed a Specific Plan, which is a visual land use policy document to implement the vision of the project. The Specific Plan includes unique provisions related to connectivity, share parking, and the site's multiple pocket parks. PEPPER AVENUE SPECIFIC PLAN Project Manager: John Moreland Rialto, CA Director, Planning ., 1 City of Rialto jmoreland@ktgy.com 949.221.6216 .mod Architecture+Planning Typology Planning I Entitlement & Government Relations Master Planning Services Specific Plan Consultant Management Visioning City Support and Processing Land Use Planning Facts Land Use: Retail, Multi -Family, Office, Public Services (Water District), Natural Open Space Site Area: 102 ac Project Duration: 2013-2017 The City of Rialto selected KTGY Architecture + Planning to lead a team of planners, environmental consultants, engineers and other consultants to develop the Pepper Avenue Specific Plan. The City initiated this project to take advantage of a new freeway off -ramp projected to open in 2018, which will create a new gateway into the city. Almost half of the site consists of protected, natural habitat. At least one fault line, a nearby levee and railroad spur add to the constraints for this project. Part of this process includes facilitation of the project with interested neighbors, a diverse group of property owners and other stakeholders, coordination with City Staff, and guiding the project through the City's Planning process. KTGY held an interactive workshop that utilized of Turning Point technology, an interactive, polling software program. The instantaneous results allowed the planning discussions to go deeper into people's values, wants and desires. The interactive workshop was hailed as a success by the city and resulted in beneficial information for the land use plan. KTGY represented the Specific Plan at the Planning Commission and City Council hearings, met with concerned citizens, and assisted with the preparation of Staff Reports. The Specific Plan was adopted on December 13, 2017 and will host a future, upcoming meting with City Staff to help facilitate and train on Specific Plan implementation. THE COLONY AT THE LAKES Project Manager: David Lacey West Covina, CA Executive Director ., 1 Lennar Multifamily Communities dlacey@ktgy.com 949.797.8316 .mod Architecture+Planning Typology Mixed -Use Wrap Apartments I Retail Facts Density: 73.87 du/ac Unit Plan Sizes: 644-1,165 sq. ft. Number of Units: 450 du Site Area: 6.09 ac Retail: 20,000 sq. ft. Number of Stories: 5 Parking: 916 spaces (2.03 sp./unit) Construction Type: I & IIIA Project Duration: 2013 - 2016 The Colony at the Lakes is a 5-story mixed -use development located in a prime location in the City of West Covina. Designed to appeal multiple demographics, the large development contains 450 units in one building that wraps around and completely hides two distinct parking garages. In addition, 20,000 square feet of retail space sits beneath the south side of the building. At the heart of The Colony at the Lakes is a substantial leasing and amenity building, forming the backdrop to a ceremonial entry drive. The majority of the building has been designed in a Mediterranean Style with the central amenity building being the departure. The Warehouse style there calls attention to it and leaves no doubt about its importance. RINKER HEALTH SCIENCE CAMPUS Irvine, CA Chapman University Q Sdgi Jeron Ming west Dead aanattg m'soeso Typology Planning Services Entitlement Government Relations Master Planning Facts Land Use: University I Institutional Site Area:18.78 ac Square Footage: 18.78 ac Users: 900+ (students) aat w ar 9 1+® Jx nines -� � H 'WY ,N��N pit JERONIMO RD FetureC Slgnal Project Manager: John Moreland Director, Planning ., 1 jmoreland@ktgy.com 949.221.6216 .mod Architecture+Planning 'MMM is 1 • 9 3 0 FN Sig KTGY Architecture + Planning currently processes and manages all zoning and entitlement services for Chapman University's Rinker Health Science Campus in the City of Irvine. Initiated in 2012, Chapman University acquired two properties, each consisting of a two-story office building, with the desire to establish Orange County's first graduate School of Pharmacy. In conjunction with multiple consultants, KTGY's planners led the project team and obtained the city's approval for the use and alterations unique to the campus, including a comprehensive sign program meeting Chapman's donor program needs while fitting into the surrounding Irvine Spectrum context. KTGY also worked with the city to secure approval for reduced parking stall sizes to avoid a complete redesign of the parking lot. KTGY has successfully processed two additional applications, bringing two other properties into the campus, a shuttle route, and a signalized -at grade crossing from an off -site parking lot. KTGY is currently working on entitling a campus master plan through the City. Services for this campus also include processing through The Irvine Company's design review process. Project Duration: 2012- Present Queen of the Valley Specific Program EIR Los Angeles County, CA/City of West Covina KEY PROJECT ELEMENTS ► In-fill/Redevelopment ► Four -Phase Redevelopment ► Program EIR ► Preparation of Multiple Technical Studies COMPLETION DATE Psomas prepared a comprehensive Program EIR for a new master plan and Specific November 2019 Plan for the Queen of the Valley Hospital in West Covina. The hospital proposed to expand its facilities from 1.1 to 1.58 MSF plus two parking structures in approximately REFERENCE five phases to provide expanded and more efficient medical and support services to Jo -Anne Burns the community. The work would involve adding several new buildings and renovating Planning Manager City of West Covina and demolishing a number of existing structures. The Psomas Team includes KTGY (626) 939-8761 to prepare the Specific Plan and HR&A to prepare a fiscal impact assessment for the jburns@westcovina.org project. Psomas also prepared air quality, greenhouse gas emissions, noise, and traffic studies. Psomas is currently working with the hospital and the City in implementing Phase I of the planned expansion. PSOMAS South Pasadena General Plan/Downtown Specific Plan Update EIR South Pasadena, CA/City of South Pasadena KEY PROJECT ELEMENTS ► General Plan and Specific Plan Update EIR in the San Gabriel Valley ► Planning for Metro Gold Line Station and Other Progressive Transportation Policies ► Key Issues: Historic Resources, Maintenance of Established Neighborhoods, Traffic, Water Supply COMPLETION DATE Psomas is preparing a Program Environmental Impact Report (PEIR) for this project, Ongoing which involves a comprehensive update to both the 1998 South Pasadena General Plan and the 1996 Mission Street Specific Plan (MSSP). The City of South Pasadena (City) REFERENCE occupies approximately 3.5 square miles on the western edge of the San Gabriel Valley Joanna Hankamer area of Los Angeles County. The proposed General Plan Update will serve as a long-term Planning and community Development Director policy guide for decision -making regarding the appropriate physical development, City of South Pasadena resource conservation, and character of the City, and establishes an overall development (310) 721-1224 capacity for the City through the year 2040. The General Plan Update would southhank mere pasadenaca.gov south accommodate a total of 500 residential dwelling units and 430,000 SF of retail and office development. As part of this effort, the City's General Plan has been reorganized and reformatted to reflect both current State regulations and the community's vision for the City. The Downtown Specific Plan (DTSP) Update expands the area covered in the 1996 MSSP to include a segment of Fair Oaks Avenue, in addition to Mission Street. The DTSP Update includes policies and strategies to preserve historic assets, encourage contextual infill development of vacant and under-utilized parcels, create jobs, and maintain and support existing compatible businesses and industry, as well as accommodate housing for a variety of income levels. Key environmental issues for the PEIR include preservation of historic resources, limiting the allowable growth and development in order to manage traffic and circulation, and water supply constraints. Additi­11,, the RETR r flP tc thP City's priorities foi and addressing th, PSOMAS Magnolia Tank Farm Specific Plan PEIR Huntington Beach, CA/City of Huntington Beach KEY PROJECT ELEMENTS ► Mixed -Use, Infill Redevelopment ► Brownfield Redevelopment ► Adjacent Sensitive Magnolia Marsh ► Preparation of Multiple Technical Studies ► Peer Review of Existing Technical Studies COMPLETION DATE Psomas prepared a Program Environmental Impact Report (PEIR) pursuant to CEQA for December 2019 the Magnolia Tank Farm Project. Psomas worked closely with the City in preparation of the NOP, draft and final EIRs, and Responses to Comments. In addition, Psomas REFERENCE conducted a Scoping Meeting and a Planning Commission Study Session. Ricky Ramos Senior Planner The project site is located within the Coastal Zone, adjacent to Magnolia Marsh in the Department of Community City of Huntington Beach. The project site previously contained three oil storage tanks Development City of Huntington Beach that were demolished in 2017. The Draft PEIR evaluated two development alternatives at (714) 536-5624 an equal level of consideration. The alternatives were identified as the proposed project rramos@surfcity-hb.org (mixed -use) and Alternative 1(residential). Under the proposed project, the Specific Plan will establish a land use plan and develop standards and guidelines to allow for creation of the proposed mixed -use development comprised of a 211,000 SF lodge/guest house accommodations with a maximum of 215 rooms, including 175 guest rooms and family/group overnight accommodations with 40 rooms;19,000 SF of ancillary and visitor -serving retail and dining; and up to 250 for - sale residential units (at 15 dwelling units per acre). Additionally, the proposed project includes 2.8 acres of Coastal Conservation area adjacent to Magnolia Marsh and 2.8 acres of park. Alternative 1 would eliminate the lodge, guesthouse, and retail components, and would include a residential { { (] - development at a maximum :„..... ................... n � of 250 residential units (at 11 dwelling units per acre). All other components, including park and open space described above under the proposed project, would remain the same. PSOMAS Aviation Station Transit -Oriented Development EIR Los Angeles County, CA/ Cox, Castle & Nicholson, LLP I County of Los Angeles KEY PROJECT ELEMENTS ► EIR for Mixed -Use Project Adjacent to Existing Established Residential Community ► Multiple Agency Involvement:Caltrans; Metro; City of Los Angeles; County of Los Angeles; LAFCO ► Key Issues: Air Quality and Noise from 1-105; Shade and Shadow; Traffic COMPLETION DATE Psomas prepared the EIR; a shade/shadow analysis; and the Air Quality, Greenhouse 2012 Gas, Noise, and Cultural Resources Technical Analyses. The project, located near Los Angeles International Airport (LAX), involves the demolition of existing land uses and the construction of an urban mixed -use development that would include 29,500 SF of ground -floor commercial uses and 390 multi -family residential units. Project entitlements include a General Plan Amendment, Conditional Use Permit and Zone Change, as well as approvals from the Airport Land Use Commission and the Local Agency Formation Commission for the County of Los Angeles. The Aviation Station project would relocate the Los Angeles County Metropolitan Transportation Authority (Metro) bus terminal from the southern side of Metro's Green Line Aviation/LAX station to the northern side of the station, resulting in the need to reconfigure an adjacent Caltrans Park -and -Ride lot. The project involves multiple stakeholders, including Metro and the California Department of Transportation (Caltrans) District 7, and required the de -annexation of property from the City of Los Angeles into the County of Los Angeles. Key environmental issues addressed in the EIR include multi -agency coordination; aircraft noise from LAX, light rail (Metro Green Line) and bus/vehicle noise (Metro bus terminal); shade and shadow casting on nearby single-family residential units; cut -through traffic and street parking; and construction dust impacts. PSOMAS REFERENCES City of Rialto Pepper Avenue Specific Plan Gina Gibson -Williams Former Planning Manager City of Rialto Currently Community Development Director City of Eastvale 12363 Limonite Avenue, Suite 910 Eastvale, CA 91752 (951) 703-4425 City of West Covina Queen of the Valley Specific Plan Jeff Anderson Former Community Development Director (626)827-0874 County of Orange 100-Acre Parcel Development Plan James Campbell Former Manager, Land Development Currently Administrative Manager II CEO Real Estate 601 N. Ross Street, 2nd Floor Santa Ana, CA 92701 (714) 834-3767 City of Walnut Terraces at Walnut Specific Plan Joelle Guerra Senior Management Analyst Community Development 21201 La Puente Road Walnut, CA 91789 (909) 595-7543 x405 KTGY ARCHITECTURE + PLANNING ATTACHMENT A XAttachment A NONCOLLUSION DECLARATION TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID The undersigned declares: I am the Principal foregoing bid. of KTGY Architecture + Planning , the party making the The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 1/14/2021 [date], at Irvine [city], CA [state]." Firm Name KTGY Architec ure + lanning Signat f Princ te) Ken Ryan, Principal (Print Name & Title) Comprehensive Development Code Update 13 The Consultant shall also comply with Section 3800 of the Labor Code by securing, paying for and maintaining in full force and effect for the duration of this Agreement, complete Workers' Compensation Insurance, and shall furnish a Certificate of Insurance to the City before execution of this Agreement by the City. The City, its officers and employees shall not be responsible for any claims in law or equity occasioned by failure of the consultant to comply with this section. (d) Professional errors and omissions ("E&O") liability insurance with policy limits of not less than One Million Dollars ($1,000,000.00), combined single limits, per occurrence or claim, and Two Million Dollars ($2,000,000.00) aggregate. Architects' and engineers' coverage shall be endorsed to include contractual liability. If the policy is written as a "claims made' policy, the retroactivity date shall be prior to the start of the work set forth herein. Consultant shall obtain and maintain said E&O liability insurance during the life of this Agreement and for five (5) years after completion of the work hereunder. If coverage is canceled or non -renewed, and not replaced with another claims -made policy form with a retroactive date prior to the effective date of this Agreement, Consultant shall purchase "extended reporting" coverage for a minimum of five (5) years after completion of the work. If the Consultant maintains higher limits or has broader coverage than the minimums shown above, the City requires and shall be entitled to all coverage, and to the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City. 5.2. Endorsements. The insurance policies are to contain, or be endorsed to contain, the following provisions: (a) Additional Insureds: The City of West Covina and its elected and appointed boards, officers, officials, agents, employees, and volunteers are additional insureds with respect to: liability arising out of activities performed by or on behalf of the Consultant pursuant to its contract with the City; products and completed operations of the Consultant; premises owned, occupied or used by the Consultant; automobiles owned, leased, hired, or borrowed by the Consultant. (b) Notice of Cancelation: Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City. (c) Primary Coverage: The Consultant's insurance coverage shall be primary insurance as respects the City of West Covina, its officers, officials, agents, employees, and volunteers. Any other insurance maintained by the City of West Covina shall be excess and not contributing with the insurance provided by this policy. (d) Waiver of Subrogation: Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Consultant agrees to obtain any endorsement that may be necessary to 6 KTGY Group, Inc. Form Revised November 2020 ATTACHMENT D Attachment D SUBCONTRACTOR CAMPAIGN CONTRIBUTION & ACKNOWLEDGMENT FORM Proposer [or Consultant] is required to identify any known subcontractor who will provide goods or services with an anticipated or actual value of $15,000 or more in connection with any contract which may be awarded pursuant to this Request for Proposal if the proposed contract with the Proposer [or Consultant] has an anticipated or actual value of $30,000 or more. By my signature below I certify that as a subcontractor I reviewed and am in compliance with the City of West Covina Municipal Code section 2-405.50, in reference to campaign contributions to any individual holding City elective office. CONTRACTOR: Company- KTGY Architecture + Planning By: �;,(/� Ken Ryan Title: Principal Date: 1/14/2021 SUBCONTRACTOR: Company: Psomas By: X L ` Title: V ce kresident Date: 1 /14/2021 Comprehensive Development Code Update 27 J S :!. J(1 Architecture +Planning JOHN MORELAND, AICP Planning Director 949.221.6216 jmoreland@ktgy.com Nam DOWNTOWN g Pu-mw'z. Downtown Superior Superior, CO affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. (a) Coverage Not Affected: Any failure to comply with the reporting provisions of the policies shall not affect coverage provided to the City of West Covina, its officers, officials, agents, employees, and volunteers. Coverage Applies Separately: The Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 5.3. Deductible or Self Insured Retention. If any of such policies provide for a deductible or self -insured retention to provide such coverage, the amount of such deductible or self -insured retention shall be approved in advance by City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self -insured retention may be satisfied by either the named insured or City. 5.4. Certificates of Insurance. Consultant shall provide to City certificates of insurance showing the insurance coverages and required endorsements described above, in a form and content approved by City, prior to performing any services under this Agreement. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. 5.5. Non -limiting. Nothing in this Section shall be construed as limiting in any way the indemnification provision contained in this Agreement. 6.0. GENERAL PROVISIONS 6.1. Entire Agreement. This Agreement constitutes the entire agreement between the parties with respect to any matter referenced herein and supersedes any and all other prior writings and oral negotiations. This Agreement may be modified only in writing, and signed by the parties in interest at the time of such modification. 6.2. Representatives. The City Manager or his or her designee shall be the representative of City for purposes of this Agreement and may issue all consents, approvals, directives and agreements on behalf of the City, called for by this Agreement, except as otherwise expressly provided in this Agreement. Consultant shall designate a representative for purposes of this Agreement who shall be authorized to issue all consents, approvals, directives and agreements on behalf of Consultant called for by this Agreement, except as otherwise expressly provided in this Agreement. 6.3. Key Personnel. It is the intent of both parties to this Agreement that Consultant shall make available the professional services of John Moreland, Lora Kennedy, Jihad Othman, and Alia Hokuki, who shall coordinate directly with City. Any substitution of key personnel must be approved in advance in writing by City's Representative. 7 KTGY Group, Inc. Form Revised November 2020