01-20-1998 - BKK Landfill Closure Plans Status ReportCity of 'West Covina
Memorandum
To: City Manager and City Council AGENDA
From: Waste Management Enforcement Agency ITEM NO. B-4e
DATE January 20, 1998
Subject: BKK Landfill Closure Plans ®PRINTED ON RECYCLED PAPER
Status Report
Summary: This is an updated report on the STATUS OF PLANS FOR BKK
LANDFILL CLOSURE and other related BKK matters. This is a
part of the City program to keep the community informed of the
progress toward implementation of the closure plans for the BKK
The latest edition of the STATUS OF PLANS FOR BKK LANDFILL CLOSURE is
attached. This is a part of the City Community Outreach Program to keep the community
informed of the progress toward implementation of the closure plans for the BKK
Landfill. Staff recommends the Commission receive and file this report.
The changes in;status since last month's report are in bold in the attachment. Without
repeating the comments in the STATUS OF PLANS FOR BKK LANDFILL
CLOSURE, the highlights of activities regarding the Landfill for the last 30 days are:
The Status of Plans for BKK Landfill Closure is a summary of closure activities. The
processing and implementation of the following:
1. Ridgeline Grading Plans
2. Class III Landscape Plans
3. Class I Landscape Plans
4. Class I Landscape Screening Plans
5. Dust Control Plan
6. Class III Final Closure and Postclosure Plans
7. Class I Postclosure Plan
Staff recommends the City Council receive and file this report.
Steven L. Sama iego, R.E.H.S.
Waste Management Enforcement Manager
Attachments
bkk/statl8comm I PRINTED ON RECYCLED PAPER
SLS
1/15/98
STATUS OFWANS FOR BKK LANDFAL CLOSURE
as of January 15,1998
1.
GRADING PLAN
Grading of the Southwest ridge continues as planned. The clay stockpile
behind the slope adjacent to Azusa Avenue is also being graded for use as
final cover.
2.
LANDSCAPING OF CLASS III LANDFILL
The landscape plan submitted by BKK is acceptable to the City subject to
modification of the Settlement Agreement to allow less than 7.5 feet of
vegetative soil thickness at the slope benches. City Staff approved the
landscape plan for Phase A Phase A covers an area of approximately 32.3
acres of the lower South and West slopes. Trees, shrubs and hydroseed
have been planted on the lower two slopes. Plant installation has been
completed on slope B, third slope from the bottom of the Phase A
landscape plan.
Slope C is being prepared for landscaping. Irrigation system is being
installed on slope C. Phase A landscape scheduled to be completed the
first quarter of 1998 has been extended due to rainy weather
conditions. The landscape in place has not been impacted by the rains.
Slope A which has been hydroseeded has noticeable bare spots. BKK
has required their landscape contractor to re-hydroseed slope A on
January 7,1998 due to their hydroseed mix having an apparent low
seed count.
Planning Director approved the irrigation system portion of the landscaping
plan on July 25. Installation of the irrigation system is complete on the
bottom two slopes. The irrigation system is being adjusted for adequate
coverage.
Installation of the final cover of the Class III disposal unit called for in
Phase B is underway. Phase B final cover installation including vegetation
is expected to be completed by the third quarter of 1998.
3.
LANDSCAPING OF THE CLASS I LANDFILL
BKK submitted a revised plan and their landscape consultant responded to
most City comments on the previous Plan. The tree root growth data was
submitted by BKK September 18. City review is in progress.
4.
LANDSCAPING TO SCREEN CLASS I DISPOSAL UNIT
BKK has installed landscaping which begins north of the weather station
and extends to that area above City Water Reservoir No. 2. BKK requested
a delay in the installation of the screening landscape to the south of the
Class I Landfill. BKK proposes the delay to allow time to consider the
possible installation of a major road to service the possible development
along Azusa Avenue. This, proposed delay of the landscape installation is
under legal review.
5.
DUST CONTROL
Plans and specifications for the irrigation system and the landscape '
screening were found to conflict with existing underground utilities. The
design is to be adjusted to accommodate underground utilities. Once
BKKSTATUS18 Note: Class I = closed hazardous toxic waste landfill.
SLS Class III = closed household waste landfill.
1/15/98 DTSC = California Department of Toxic Substances Control
USEPA = United States Environmental Protection Agency
CIWMB = California Integrated Waste Management Board
STATUS OFWANS FOR BKK LANDFA CLOSURE
as of January 15,1998
revised plans are received, Planning Director can review for final approval.
BKK and the City are discussing the final design and schedule for
submittal. BKK wants the City to consider a delay on these improvements
subject to providing a bond or other security for this work. This plan is a
condition of the Settlement Agreement and is under legal review.
I
6.
CLASS
III FINAL CLOSURE AND POSTCLOSURE PLAN
On January 14,1998 the LEA has determined the Final Closure and
Postclosure Maintenance Plans to be accepted for the environmental review
process through the Planning Department.
Final cover soil placement installation has been completed in Phase A,
which includes portions of Slopes A, B, C, D, and E. Final cover soil
placement installation activities continue in Phase B nearing
completion.
The City Council approved staff recommendation to hire SCS Engineers to
prepare an Initial Study for the project and prepare a Scoping Outline for
preparation of an environmental impact report. This process will include
revising the Landfill's Unclassified Use Permit. The Planning Department
Will oversee preparation of this environmental report. The environmental
review and report will be based on the issues identified in the Initial Study
and listed during the Scoping Phase of the environmental review process.
BKK is to submit the accepted Final Closure and Postclosure Maintenance
Planto the City Planning Director as part of BKK's Specific Plan Land
Use Application. Upon CEQA certification, the LEA will approve the
Final Closure and Postclosure Maintenance Plans.
7.
CLASS I POSTCLOSURE PLAN
BKK submitted to DTSC on June 30, 1997 revisions to the Postclosure
Plan BKK indicated in a June 13, 1997, letter to DTSC that they needed
to address the issues in the City's January 29, 1997, letter. DTSC
requested all of the regulatory agencies to submit comments on the revised
Plan �by the end of August. The City submitted comments to DTSC on
August 26, 1997. DTSC has not responded to the City's comments. There
is no scheduled date for the commencement of the public review period or
the public hearing.
City sent another letter on June 20, 1997, to DTSC requesting their
preparation of an Environmental Impact Report instead of the Negative
Declaration of Environmental Impact. BKK has sent a letter to DTSC in
support of a Negative Declaration of Environmental Impact. DTSC has
responded in a letter dated October 7, 1997. They conclude that a negative
declaration of environmental impact is the appropriate environmental
review document.
BKKSTATUS 18
SLS
1/15/98
Note: Class I = closed hazardous toxic waste landfill.
Class III = closed household waste landfill.
DTSC = California Department of Toxic Substances Control
USEPA = United States Environmental Protection Agency
CIWMB = California Integrated Waste Management Board
0