Loading...
12-20-2011 - (3)City of West Covina 0 Memorandum AGENDA TO: Andrew G. Pasmant, City Manager ITEM NO. 7 and City Council DATE December 20, 2011 FROM: Shannon A. Yauchzee Public Works Director/City Engineer SUBJECT: AWARD OF BID FOR CONSTRUCTION OF BUS STOP PADS, CURB AND GUTTER. REPAIR, SIDEWALK REPAIR, AND THE UPGRADE OF WHEELCHAIR RAMPS (PROJECT NOS. SP-12101, SP-12102, SP-12103, AND SP-12104) RECOMMENDATION: It is recommended that the City Council accept the bid of Gentry Brothers, Inc. of Irwindale in the amount of $291,330.00 as submitted at the bid opening on November 29, 2011 and authorize the Public Works Director/City Engineer and City Clerk to execute an agreement with Gentry Brothers, Inc. for the work to be done. DISCUSSION: The City of West Covina repairs damaged concrete curb, gutter, sidewalks, and driveway aprons caused by extensive wear and tear, sub -grade settlement or growth of tree roots, and constructs new and upgraded wheelchair ramps each year in an effort to maintain its existing infrastructure. It is required by American Disability Act (ADA) to continually replace or upgrade wheelchair ramps that no longer meet current standards for the mobility of physically challenged individuals. In addition, when funds are available, the City constructs concrete bus pads at bus stops in various locations. Staff compiled a list, of locations to be repaired and/or upgraded as part of the Fiscal Year 2011- 2012 Capital Improvement Program (CIP). The work to be performed includes the removal and replacement of existing damaged concrete curb, gutter, sidewalk, and driveway aprons, construction of upgraded concrete wheelchair ramps and new concrete bus pads, including all incidental and appurtenant works at various locations citywide. A notice inviting bids. for this project was advertised in the San Gabriel Valley Tribune on November 10, and 17, 2011. In addition, the project was advertised in the Contractor's Green Sheet and Daily Construction, which notifies contractors of upcoming projects in Southern California., The bids for this project were opened in the City Clerk's office on November 29, 2011. A total of eleven (11) bids were received, opened, and checked for errors. The lowest responsive bid was $2911,330.00 from Gentry Brothers, Inc., of Irwindale, California. The following is a summary of the bids received. l . se.i Gent Brothers, Inc. laK� 8A4 ♦ 3J�v -t z��K 4 Irwindale _�e 1� Yd�A Bmonnt ,a $291,330.00 2. FS Construction Sylmar $291,493.00 3. Black Rock Construction Company, Inc. Brea $326,500.00 4. Interlog Hym Engineering Brea $334,731.00 5. Martinez Concrete* Azusa $354,424.60 6. S. J. Grigolla Construction Co., Inc. La Verne $357,128.50 7. Southland Construction Irvine $408,500.00 8. EBS General Engineering, Inc. Corona $421,720.00 9. 1 All American Asphalt Corona $444,444.00 10. Kalban, Inc. Sun Valley $447,361.60 11. Silvia Construction, Inc. Rancho Cucamonga $528,990.00 nejecteu uue cu incumpcere oia nona,jorm. Andrew G. Pasmant, City Manager and City Council Page 2 — December 20, 2011 If the contract is awarded, the physical work for this project is scheduled to commence in January 2012, and is expected to be completed by the end of March 2012. For safety purposes and to facilitate the dropping off and picking up.students, there will be no construction around schools at least 45 minutes before and after the schools' start and finish time. ALTERNATIVES: 1. Award the project to the lowest responsive bidder. 2.' Reject all bids received and re -advertise. Since a favorable bid was received, it is unlikely that seeking new bids would reduce costs any further. FISCAL IMPACT: Funds were approved as part of the Capital Improvement Program (CIP) budget by the City Council. The funds available for this project are as follows. x p 53Yr'd > i"k ' SAS 'Y • i'F'Y Tit 53 qZ ,85.2'Ys4tb.+ iY cSw. ' FsFunds�;����.��. �Accrlunt�frNc��"_...��Amount,�'=� 1. SP-12101 , Measure R 224.81.8209.7200 $50,000.00 2. SP-12102 Community Development Block 131.81.8210.7200 25,000.00 124.81.8210.7200 50,000.00 Grant (CDBG) and Gas Tax. 3. SP-12103 Transportation Development Act 128.81.8211.7200 80,000.00 (TDA) Fund 4. SP-12104 Community Development Block 131.81.8212.7200 200,000.00 Grant (CDBG) Total F$405,000.00 Project funding will be allocated as follows. 1. Bid amount $291,330.00 2. Preliminary Engineering and Construction Administration/Inspection 50,000.00 3. Contingencies 63,670.00 Total $405,000.00 Prepared by: Oscar Caplin Reviewed/Approved by: Shannon A. Yauchzee Civil Engineering Associate Director/City Engineer Reviewed/Approved by: Finance Attachment No. 1 Location Map for Curb and Gutter, and Sidewalk Repair. Attachment No. 2 Location Map for Construction of Wheelchair Ramps and Bus Pads ZAIAGENDA - 201 RAward of Bid for SP-12101, SP-12102, SP-12103, SP-12104.doc S C&G Attachment No. 1 City Proiect SP-12101 SP-12102 SP-12103 SP-12104 CURB & GUTTER/ SIDEWALK LOCATIONS No. Location C&G (1Ft) C&G (2Ft) Sidewalk (S Ft) Cross Gutter Driveway (S Ft) Other 1 2661 Altamira Dr. 4 16 2 2662 Altamira Dr. 4 16 3 Amar @ Westport (South East Comer) 471 4 646 Atwood 100 5 324 S. Ashdale 37 6 Barranca @ N. Garvey (North west Comer) 300 7 2735 Brookfield 35 8 2549 Cameron 34 112 9 2129 Cameron Avenue 155 10 1740 Cameron Avenue 240 11 Camino De Gloria (Between Mill Ridge and Calle Baja) NB 30 12 330 Conlon* 20 13 912 Coral Tree 56 14 Cortez and Azusa (North East Comer) 24 139 15 1421 Craig 25 16 1900 Cumberland 20 17 1954 Cumberland 60 18 1952 Cumberland 75 19 Donna Beth South of Calico E40 125 20 1827 Dumess Street 21 Eldred east of Orange (Monte Vista School) 50 22 1237 E. Elgerua 30 23 - 1741 Gleuridge 10 24 2100 Grandview 10 25 2633 Greenborough 10 264 32** 26 Across from 1957 Greenleaf 44 192 27 1030 Grovecenter 20 28 1632 Hillbom 30 29 3104 Hillside 40' 150 30 2993 Hillside 124 31 1420 Indian Summer 20 32 1205 Lark Ellen 109 33 410 La Sena Ave N* 30 34 236 Lang Avenue north 30 35 1222 Leaf 32 36 1302 Leaf 15 37 1327 Loma Vista 50 38 Maplegrove East of Valinda (EB) 35 1176 39 2634 East Maureen St. 16 40 Meeker @Elder 250 41 1027 Meeker Avenue 66 42 1145 Meeker Avenue 15 43 1422 Meeker Avenue 33 44 804 E. Merced Avenue 25 115 45 1148 E. Merced Avenue 35 46 1729 E. Merced Avenue 325 47 1717 W Merced Avenue* 30 48 1224 Merr 1 '10 49 1528 Nomura Ave E 27 50 1520 Norma Ave E 38 51 1604 Orange 75 52 1613 Orange 79 53 Orange and Dumess (Orangewood School) 2120 54 Orange and Roseway 250 55 1901 Pacific. Avenue 460 56 ' Pionneer School Rowland 2320 57 1210 Robin Road 61 58 1213 Robin Road 40 59 1223 Robin Road 24 60 1235 Robin Road 20 61 1252 Robin Road 45 62 1027 Rodilee 36 63 1644 E.. Rowland Ave 78 64 1305 E. Sandy H ll drive 15 65 Shadow Oak 500' North of Gemini 207 66 Shadow Oak 500' North of Nogales 280 67 Shadow Oak 500' North of Wood ate 230 68 Shake ear 100 feet North of Nogales 49 320 69 1822 Sherway Street 24 70 3125 Sunset hill 20 71 Valinda Avenue @ Ma le ove (South east Comer) 40 360 72 1606 Vemess St E* 20 73 1933 Viola Ct 368 74 141 Walnuthaven* 20 75 137 Walnuthaven* 25 76 234 Willow Ave* 36 TOTAL 1780 136 10770 500 30 32 *CDBG ** 4. feet Gutter Page 1 IE NOW OKI T rM in [IM MU� S. r Ramps Attachment No. 2 City Project SP-12104 Construction of Wheelchair Ramps Locations Location - NE NW SE SW Cl)Bandy Dalewood x x 2 2 Blue Ash St. Maio X 1 3 California Durness x x 2 4 California Michelle x x 2 5 California Lucille x x 2 6 California Bainbridge x x x x 4 7 California Glenmere x x 2 8 California Del Haven x x 2 9 California Rudyard x x 2 1 Cortez Hillborn x x 2 1 Cortez Hillward x x 2 1 Cortez Glenn Alan x x 2 1 Cortez Arturo x x 2 1 Cortez La Cuta x x 2 1 Donna beth Aroma (north) X X X X 4 1 Donna beth Aroma (south) X X 2 1 Evanwood Durness X, x 2 1 Lark Ellen Michelle . x x 2 1 Lark Ellen McWood x x 2 Michelle Neff x x 2 Maplegrove Pass & Covina x 1 Maplegrove Vanderwell x x 2 2 No. Garvey Hartly x x 2 2 No. Garvey Vincent x x 2 2 Orange Garvey Avenue S. X X 2 2 Rebecca Rachel x x 2 2 Renown Barham X X 2 2 Rita Shadow Oak x x 2 2 Rita Regina x x 2 3 Rodney Barham X 1 3 Rodney Ajax X X 2 3 Ruth Rachel x x 2 3 Samantha Rebecca x x 2 3 Samantha Sally x x 2 3 Samantha Shinlee x x 2 3 Valinda Florence x x 2 3 Valinda Charlinda x x 2 3 Vincent Walnut Creek X 1 3 Vine Pima x x 2 4 Vine Lark Ellen x x x 3 4 Vine Leaf x x 2 4 Vine Glenview x x 2 4 Vine Cajon x x 2 Vine Donna Beth x x 2 TOTAL 89 Page 1 Attachment No. 2 City Project SP-12101 Bus Pad Locations Location Direction . Dimensions Area (Sq Ft) 1 I Toluca north of Cameron SB 240 x 10 2400 2 Merced west of Walnut EB 90 x 10 900 Total- 3300