02-05-2008 - (2)t City of West Covina
• 0 Memorandum
1 AGENDA
TO:_ Andrew G. Pasmant, City Manager ITEM NO. D-6d
and City Council DATE February 5, 2008
FROM: Shannon A. Yauchzee, Director/City Engineer
Public Works Department
SUBJECT: CO-OPERATIVE AGREEMENT WITH THE COUNTY OF LOS
ANGELES DEPARTMENT OF PUBLIC WORKS TO FORMALIZE
MAINTENANCE RESPONSIBILITIES OF INTERSECTIONS THAT ARE
PART OF THE TRAFFIC SIGNAL SYNCHRONIZATION PROGRAM
PROJECTS
RECOMMENDATION:
It is recommended that the City Council authorize the Public Works Director/City Engineer to
execute a cooperative agreement with the County of Los Angeles Department of Public Works to
formalize maintenance responsibilities of intersections that are part of the traffic signal
synchronization program.
DISCUSSION:
Los Angeles County instituted the Countywide Traffic Signal Synchronization Program (TSSP)
to help improve mobility on congested local highways and streets. Since the TSSP's inception in
1988, the County's Public Works Department and with the technical and financial assistance of
numerous cities, the State of California Department of Transportation, and the Los Angeles
County Metropolitan Transportation Authority (MTA), has been implementing innovative, low-
cost operational improvements to the network of traffic signals on major street corridors
throughout Los Angeles County. The typical TSSP project involves upgrading all the traffic
signals along a route to keep the signals synchronized, placing vehicle detectors in the pavement
to detect the presence of vehicles, coordinating the timing of the signals between successive
intersections, and automatically adjusting the traffic signals to facilitate the movement of
vehicles through the intersections.
The following list shows streets in West Covina that are part of the County's TSSP and their
current progress.
■ Azusa Avenue from Badillo Street to Amar Road — Completed.
■ Pacific Avenue/West Covina Parkway/Valinda Avenue from Ardilla Avenue to Amar Road
Completed.
■ Amar Road from Valinda Avenue to Nogales Street — Completed.
■ Francisquito Avenue from Maryland Avenue to California Avenue— In Design.
■ Puente Avenue from Garvey Avenue to Macdevitt Street — In Design.
■ Grand Avenue from Fairway Lane to Holt Avenue — Completed.
■ Citrus Avenue from Workman Avenue to Norma Avenue — In Construction.
• Sunset Avenue from Badillo Street to Fairgrove Avenue — In Construction.
■ Vincent Avenue/Glendora Avenue from Badillo Street to Michelle Street — In Construction.
■ Nogales Street from Amar Road to Valley Boulevard — In Construction.
• Valley Boulevard from Gladbrook Avenue to Morganfield Avenue In Design.
■ Badillo Street from Orange Avenue to Phillips Avenue — In Design.
The purpose of the proposed agreement is to formalize maintenance responsibilities of City and
the County for the intersections that are part of the TSSP projects. This includes the projects for
which design has recently been completed and will soon be advertised, as well as those currently
in construction, and those that have been completed. This agreement does not change the City's
current maintenance and operation responsibilities, but only requires that the City inform the
County of any changes. to the TSSP improved traffic signals.
Andrew G. Pasmant City Manager
and City Council
Page 2 — February 5, 2008
FISCAL IMPACT:
None.
Prepared b iguel ilemandez u Reviewed/Approved by: Shannon A. Yauchzee
Civil Engineering Associate Director/City Engineer
Reviewed/Approved by: Approved Via E-mail
City Attorney
Attachment No. 1: Agreement
ZAAGENDA - 2008\Traffic Signal Synchronization Program Agreement.doc
,•
ATTACHMENT NO. 1
AGREEMENT
This AGREEMENT, made and entered into by and between the CITY OF WEST
COVINA, a municipal corporation in the County of Los Angeles, hereinafter referred to as
CITY, and the COUNTY OF LOS ANGELES, a political subdivision of the State of
California, hereinafter referred to as COUNTY:
WITNESSETH
WHEREAS, Azusa Avenue from Badillo Street to Amar Road, Pacific Avenue/West
Covina Parkway/Valinda Avenue from Ardilla Avenue to Amar Road, Amar Road from
Valinda Avenue to Nogales Street, Francisquito Avenue from Maryland Avenue to
California Avenue, Puente Avenue from Garvey Avenue to Macdevift Street, Grand Avenue
from Fairway Lane to Holt Avenue, Citrus Avenue from Workman Avenue to Norma
Avenue, Sunset Avenue from Badillo Street to Fairgrove Avenue, Vincent Avenue/Glendora
Avenue from Badillo Street to Michelle Street, Nogales Street from Amar Road to Valley
Boulevard, Valley Boulevard from Gladbrook Avenue to Morganfield Avenue, and Badillo
Street from Orange Avenue to Phillips Avenue, hereinafter referred to as ARTERIALS, are
roadways that are or will soon become a part of the County's Traffic Signal Synchronization
Program (hereinafter referred to as TSSP); and
WHEREAS, CITY and COUNTY are each responsible for their jurisdictional portion
of the operation and maintenance of the traffic signals and signal systems along each of
the ARTERIALS; and
WHEREAS, CITY and COUNTY have previously cooperated, in carrying out traffic
signal synchronization projects on ARTERIALS; and
WHEREAS, COUNTY and CITY desire to memorialize their understanding regarding
their relative rights, obligations, and duties with respect to the TSSP.
NOW, THEREFORE, in consideration of the mutual benefits to be derived by CITY
and COUNTY and of the promises herein contained, it is hereby agreed as follows:
(1) CITY AGREES:
a. Nothing in this AGREEMENT shall be construed as changing the role of CITY
in operating and maintaining the traffic signals within CITY's jurisdiction.
b. To be responsible for maintaining the basic traffic signal timing for the
intersections within the jurisdictional boundary of CITY.
C. To maintain the traffic signal coordination timing along ARTERIALS ; to
promote coordinated traffic operations, multi jurisdictional cooperation and
improve arterial traffic conditions and to make the COUNTY aware of any
changes implemented to the coordination timing that may impact the
Page 1 of 4
coordination of the traffic signals along the ARTERIALS.
d. To accept full and complete ownership of, responsibility for, and to maintain
in good condition and at CITY expense all improvements constructed through
individual TSSP Projects within CITY'S JURISDICTION, including the timing
of traffic signals .on ARTERIALS that supports coordination timing and
optimum synchronization of traffic signals on ARTERIALS.
e. To cooperate with COUNTY and provide requested information in a
reasonable and timely fashion in connection with COUNTY'S preparation of
an annual report for the MTA as referred to in Paragraph (2)c. below.
(2) COUNTY AGREES:
a. Nothing in this AGREEMENT shall be construed as changing the role of
COUNTY in operating and maintaining the traffic signals and signal systems
within CITY'S jurisdiction.
b. As".a part of construction of individual TSSP Projects, to develop and
implement the traffic signal coordination timing along the ARTERIALS that
will improve arterial traffic conditions and traffic flow thereby saving motorists
time and improving airquality. .
C. To file routine reports with the MTA on the efficiency of these Traffic Signal
Synchronization Projects by compiling an operational status from individual
cities along the ARTERIALS.
(3) IT IS MUTUALLY UNDERSTOOD AND AGREED AS FOLLOWS:
a. This AGREEMENT does not constitute any financial commitment between
the CITY and COUNTY.
b. The term of this AGREEMENT shall commence on the date it is approved by
the Board of Supervisors and shall continue until any.party terminates it upon
thirty (30) days prior written notice.
C. Any correspondence,;, communication,, or contact concerning this
AGREEMENT shall be directed to the following:
Page 2 of 4
CITY:
COUNTY: Mr. William Winter
Assistant Deputy Director
Traffic and Lighting Division
County of Los Angeles, Department of Public Works
P.O. Box 1460
Alhambra, CA 91802-1460
d. Neither COUNTY nor any officer or employee of COUNTY shall be responsible
for any damage or liability occurring by reason of any act or omission on the part
of CITY under or in connection with any work, authority, or jurisdiction delegated
to, assumed by, or determined to be the responsibility of CITY under this
AGREEMENT. It is also understood and agreed that, pursuant to Government
Code, Section 895.4, CITY shall fully indemnify, defend, and hold COUNTY
harmless from any liability imposed for injury (as defined by Government Code,
Section 810.8) occurring by reason of any act or omission on the part of CITY
under or in connection with any work, authority, or jurisdiction delegated to or
determined to be the responsibility of CITY under this AGREEMENT.
e. Neither CITY nor any officer or employee of CITY shall be responsible for any
damage or liability occurring by reason of any act or omission 'on the part of
COUNTY under or in connection with any work, authority, or jurisdiction
delegated to or determined to be the responsibility of COUNTY under this
AGREEMENT. It is also understood and agreed that, pursuant to Government
Code, Section 895.4, COUNTY shall fully indemnify, defend, and hold CITY
harmless from any liability imposed for injury (as defined by Government Code,
Section 810.8) occurring by reason of any act or omission on the part of
COUNTY under or in connection with any work, authority, or jurisdiction
delegated to or determined to be the responsibility of COUNTY under this
AGREEMENT.
//
Page 3 of 4
IN WITNESS WHEREOF, the parties hereto have caused this
AGREEMENT to be executed by their respective officers, duly authorized, by the
CITY OF WEST COVINA on , 2007, and by the COUNTY OF LOS ANGELES
on , 2007.
ATTEST: COUNTY OF LOS ANGELES
By
Director of Public Works
APPROVED AS TO FORM:
RAYMOND G. FORTNER, JR.
County Counsel
By
Deputy
CITY OF WEST COVINA
By
City Manager
ATTEST:
By
City Clerk
By
City Attorney
P:\tlpub\WPFILES\FILESITRA\CO-OP AGREEMENTS\TSSP\TSSP Co -Op Agreement West Covina 3DOC
Page 4 of 4