02-06-2007 - Award of Bid for Construction of Median Landscape Improvement on North Azusa Avenue - Project #SP-071020 City of West Covina Memorandum TO: Andrew G. Pasmant, City Manager and City Council FROM: Shannon A. Yauchzee, Director/City Engineer Public Works Department AGENDA ITEM NO. D-4c DATE February 6, 2007 SUBJECT: AWARD OF BID FOR CONSTRUCTION OF MEDIAN LANDSCAPE IMPROVEMENT ON NORTH AZUSA AVENUE (PROJECT NO. SP-07102) RECOMMENDATION:. It is recommended that the City Council take the following actions: 1. Transfer $100,190 from Azusa Avenue North Design for Traffic Signal Improvements Project No. TP-05506 (Account No. 121.85.9547.7800) to Project No. SP-07102 (Account No. 121.81.8739.7200) 2. Transfer $75,000 from Concrete Bus Pad Program Project No. SP-07103 (Account No. 121.81.8740.7200) to Project No. SP-07102 (Account No. 121.81.8739.7200) 3. Transfer $100,000 from Construction of Equestrian Fence Project No. SP-07116 (Account No. 125.81.8778.7200) to Project No. SP-07102 (Account No. 125.81.8739.7200) if the Prop "C" funds are not available 4. Transfer $600,000 from Azusa Avenue Median Landscaping Project No. SP-05101 (Account No.. 215.81.8519.7200) to Project No. SP-07102 (Account No. 215.81.8739.7200) 5. Appropriate $100,000 Proposition "C" Funds ' to Project No., SP-07102 (Account No. 122.81.8739.7200) 6. Accept the bid of Mega Way. Enterprises in the amount of $729,516.35 as submitted at the bid opening 'on January 24, 2007, and authorize the Public Works Director/City Engineer and City Clerk to execute an agreement with Mega Way:Enterprises of Pomona, California, for the work to be done. DISCUSSION: The City Council, on February 18, 1997, approved a conceptual landscaping plan for the entire Azusa Avenue median from the north City limit to the south City limit.` This approval included the section between north City limit to South Garvey Avenue. The consultant has prepared plans and specifications on the basis of approved conceptual plan by the City Council similar to that of recently completed on South Azusa Avenue. The work on North Azusa Avenue median landscape between north City limit and South Garvey Avenue includes removal of the existing asphalt concrete from the existing median and, replacing it with hardscape, ground cover, trees, irrigation, electrical outlets for holiday lighting, removal and replacement of damaged curbs, gutter and sidewalk, and all appurtenant and incidental work. A notice inviting bids for this project was advertised in the San Gabriel Valley Tribune on January 10 and 17, 2007. In"addition, the project was advertised in the Contractor's Green Sheet and in the Daily Construction Service that notifies contractors of upcoming projects in Southern California. The bids for this project were opened in the Office of the City Clerk on January 24, 2007. A total of five bids were received, opened, and checked for errors, and all were determined to be valid. The lowest responsive bid was $729,516.35 from Mega Way Enterprises of Pomona, California. Z:\AGENDA - 2007\SP-07102_Award of Bid for Construction of Median Landscape Improvement on North Azusa Ave..doc I Andrew G. Pasmant, City Manager and City Council Page 2 — February 6, 2007 The following is a summary of the bids received: No.. Contractor city Bid Amount 1. Mega Way Enterprises Pomona $729,516.35 2. Vido Samarzich, Inc. Alta Loma $847,916.00 3. EC Construction Company South El Monte. $920,658.91 4. America West Landscape, Inc. Downey $988,187.53 5. 4-Con Engineering, Inc. Riverside $1,077.598.25 If the contract is awarded, the physical work for this project will commence the second week of March 2007 and should be completed within approximately 12 weeks. ALTERNATIVES: An alternative is to reject all bids and re -advertise. Since the lowest responsive bid is within the original project cost estimate and budget, it is unlikely that re -bidding the project would result in further cost reduction. FISCAL IMPACT: After the transfer, the following funds will be available for this project: Project No. Funding Source Account No. Amount SP-07102 Relinquishment Funds 215.81.8739.7200 $600,000 SP-07102 Pro "A" Funds 121.81.8739.7200 175,190 SP-07102 Proposition "C" Funds* 122.81.8739.7200 100,000 Total $875,190 *Pending MTA approval. Project funding will be allocated as follows: No. Type of Works Amount 1. Construction Contract $729,516.35 2. Preliminary Engineering, Construction Administration; and Contingencies 110,673.65 3. Consultant Design Fees 35,000.00 Total $875,190.00 Additional annual funds of approximately $8,000 to $10,000 will be required in the 2007-2008 operating budget in order to maintain the new median landscaping on North Azusa Avenue. P'� �-4' /,-AAA A 11 A , �, Prep aresh J. alkhiwala Reviewed/Approved b : Shannon A. Yauchzee Principal Engineer Director/City Engineer Reviewed/Approved by: Finance Attachment No. 1— Location Map Z:\AGENDA - 2007\SP-07102_Award of Bid for Construction of Median Landscape Improvement on North Azusa Ave..doc ATTACHMENT NO. 1 PROJECT SITE N NO SCALE - - SAN BERNgRDINo a L.; UN Q LaJ Q Q L+1:t.�81 O < CHO K < W Fi _ C1 OUISA AVE. _ !z zz71N GI c. LOUtSA AVE. S 3 z I-E � c77 CK RMAN A < ®PALM VIAe ® W PARK® � t;AA DMES DR_ < < R A nl PIONEER SC of S Fi SCHO DR. < SWANEE LN. Lj ® P ro -{{ ST. a c OLi. m a uTHFI PORN fn s i < yW V STELBO Sr. CCHO z d CREENDALE ST. m > a RNESS ST. � x = g W 3 OANOM SCHO 3 o SAN BERNARDINO E%W VE S. AVE. . CALIFO�2S OMRVEY AVE. < W Li o e A > & a a ; �_ w PKwy a n(O K NOIyY OqK DR. NOLLY OqK BLUE � 0 j � > s J ERVIC o I s CORTE AVE. < st. 71 LMKWOOD PROJECT NO., SP-07102 AZUSA AVENUE IMPROVEMENTS .MEDIAN LANDSCAPE