Loading...
01-17-2006 - Award of Bid for Street Rehabilitation Work for Residential Streets (Project #SP-06109)ti • • City of West Covina �t Memorandum TO: Andrew G. Pasmant, City Manager AGENDA and City Council ITEM NO. D-3b FROM: Shannon A. Yauchzee, Director/City Engineer DATE January 17, 2006 Public Works Department SUBJECT: AWARD OF BID FOR STREET REHABILITATION WORK FOR RESIDENTIAL STREETS (PROJECT NO. SP-06109) RECOMMENDATION: It is recommended that the City Council take the following actions: 1. Award a contract to Sully -Miller Contracting Company in the amount of $1,430,887.50, and authorize the Public Works Director/City Engineer and City Clerk to execute the contract for residential street rehabilitation. 2. Appropriate $325,000 from North Azusa Avenue Relinquishment fund (215.41.4521) to Project No. SP-06109 (215.81.8630.7200). 3. Appropriate $500,000 Community Development Block Grant (CDBG) fund and appropriate an additional $160,000 from the unappropriated CDBG fund balance to Project No. SP-06109 (131.81.8630.7200). DISCUSSION: This project was approved by the City Council in Fiscal Year 2005-2006 Capital Improvement Program budget. This project consist of grinding down (coldmilling) existing asphalt concrete pavement two inches and providing asphalt concrete overlay, repair of damaged curbs, gutters, sidewalks, construction of wheelchair ramps, adjustment of various manholes and new pavement messages, striping, and including all incidental and appurtenant works. The project consists of seventy-three segments of various residential streets (see Attachment No. 1) located within the CDBG area and other locations Citywide. The total length of the project is about nine miles (area about 1,480,000 square feet). Pursuant to the California Environmental Quality Act Guidelines Section 15302-Class 2, the aforesaid improvements are of a minor nature and, therefore, the project is categorically exempt from the requirements for Environmental Impact Report or Negative Declaration of Environmental Impact Report. A notice inviting bids for this project was advertised in the San Gabriel Valley Tribune on December 9 and December 16, 2005. In addition, the project was advertised in the Contractor's Green Sheet and the Daily Construction Service. On January 5, 2006, a total of eight bids were received and checked for errors, and all were determined to be valid. The following is a summary of the bids received: Contractor.,"".., a Sp C><t t .,... B><dAmount n . 1. Sully -Miller Contracting Company Anaheim $1,430,887.50 2. Mobassaly Engineering, Inc. La Verne $1,486,127.00 3. Gentry Brothers Irwindale $1,493,060.00 4. Hardy and Harper, Inc. Santa Ana $1,553,280.00 5. Silvia Construction Rancho Cucamonga $1,569,249.00 6. PALP, Inc. DBA Excel Paving Company Long Beach $1,724,553.00 7. All American Asphalt I Corona $1,835,000.00 8. 1 Vance Corporation I Rialto $1,889,889.00 The lowest responsive bid was $1,430,887.50 from Sully -Miller Contracting Company of Anaheim, California. If awarded, the project construction will commence near the second week of February 2006, and will be completed in about eight weeks. ZAAGENDA - 2006\SP-06109 Award of Bid for Street Rehabilitation Work for Residential Streets.doc • Andrew G. Pasmant, City Manager. and City Council Page 2 — January 17, 2006 ALTERNATIVES: Listed below are the alternatives for this project. - 1. To reject all bids received and re -advertise. Since a favorable bid was received, it is unlikely that seeking new bids would reduce costs any further. 2. To reduce the scope of work by eliminating some segments from the proposed location of streets. This alternative requires negotiation of a change or a re -bid. This will also increase the City's backlog of street rehabilitation work, which is unnecessary as there is adequate funding for this project. FISCAL IMPACT: These funds were approved as part of the 2005-2006 Capital Improvement Program budget by the City Council in July 2005. After the appropriation of funds as mentioned in the recommendation, the funds available for this project (Project No. SP-06109) are as follows; 1. CDBG 131.81.8630.7200 $125,000 2. State Grant Funds 125.81.8630.7200 ' 465,000 3. CDBG (appropriated)* 131.81.8630.7200 500,000 4. Additional CDBG (appropriated)" 131.81.8630.7200 160,000 5. Relinquishment fund (North Azusa Avenue)*** 215.81.8630.7200 325.000 Jhese funds are available now due to City Council action on December 20, 2005, to increase CDBG projects. **' 'Pending City Council approval on February 7, 2006 These funds are available due to the City Council action on September 20, 2005. Funds to be used to complete the project are as follows: ATTACHMENT NO. 1 City of West Covina City Project SP-06109 NO. STREET NAME BEGIN LOCATION END LOCATION: 1 ALASKA ST HOLLENBECK ST MANZANITA DR 2 ALLEY WY RIO VERDE DR CORTEZ ST 3 ALLEY WY* PHILLIPS AVE END OF STREET 4 ALLEY WY SHASTA ST MANZANITA DR 5 IALLEY WY* BADILLO ST END OF STREET 6 ALLEY WY LARKWOOD AVE END OF STREET 7 AMANDA ST NOGALES ST END OF STREET 8 ARDILLA AVE* CHANNING ST PACIFIC AVE 9 ARTURO ST CORTEZ ST RIO VERDE DR 10 ASTELL AVE* GROVECENTER ST ELGENIA AVE 11 BARBARA AVE* CALIFORNIA AVE DUFF AVE 12 BROADMOOR AVE MARIANA ST MARGARITA DR 13 BURWOOD AVE* WORKMAN AVE END OF STREET 14 CAMINO DE ROSA* POINT CEDAR DR CITY BOUNDARY 15 CASAD AVE MAPLEWOOD AVE END OF STREET 16 DAWLEY AVE LARKWOOD AVE MOBECK ST 17 DAWLEY AVE CAMERON AVE MOBECK ST 18 DEL CERRO AVE LOLITA ST DEL CERRO DR 19 DUFF AVE* LUCILLE AVE MICHELLE ST 20 DURNESS ST SUNSET AVE CALIFORNIA AVE 21 ELGENIA AVE* VINCENT AVE CARVOL AVE 22 ELGENIA AVE* CARVOL AVE ASTELL AVE 23 ELLESFORD AVE* VALLEY VIEW AVE HOLLINGWORTH ST 24 EMERALD AVE ROSE MARY DR SUNSET HILL DR 25 FARLINGTON ST SUNKIST AVE END OF STREET 26 FARLINGTON ST CONLON AVE ORANGE AVE 27 FARLINGTON ST WILLOW-AVE END OF STREET 28 FIRCROFT ST CORTEZ ST RIO VERDE DR 29 GLENMERE ST ORANGE AVE CONLON AVE 30 GLENN ALAN AVE RIO VERDE DR CORTEZ ST 31 GOODWICK DR* FORECASTLE AVE END OF STREET 32 GROVECENTER ST* CARVOL AVE ASTELL AVE 33 HACKLEY AVE* VALLEY VIEW AVE HOLLINGWORTH ST 34 HILLBORN ST CORTEZ ST RIO VERDE DR 35 HOLLINGWORTH ST' HACKLEY AVE CITY BOUNDARY 36 HOLLY PL FLORENCE AVE MERCED AVE 37 JAMES AVE CALVADOS AVE END OF STREET 38 LA SENA AVE* SWANEE LN PUENTE AVE 39 LANESBORO DR* FOXLAKE AVE MORGANFIELD AVE 40 LANG AVE* THELBORN ST HOWELLHURST DR 41 LOLITA ST CAMERON AVE END OF STREET 42 LUCILLE AVE HOLLY PL SERENADE AVE 43 MANDERLY ST* VALLEY VIEW AVE MERRYGROVE ST 44 MAPLEWOOD AVE WORKMAN AVE END OF STREET 45 MAPLEWOOD AVE* ROWLAND AVE ECKERMAN AVE 46 MAPLEWOOD AVE* NORTH GARVEY AVE WORKMAN AVE 47 MERRYGROVE ST* MANDERLY ST MORGANFIELD AVE 48 MONTEZUMA WY VINE AVE END OF STREET 49 MONTEZUMA WY CORTEZ ST LARKWOOD ST 50 NORMA AVE CALVADOS AVE CITRUS AVE 51 1 OAK PARK PL* CALIFORNIA AVE END OF STREET 52 PADRE DR* PADRE DR END OF STREET 53 PADRE DR* ORANGE AVE LANG AVE 54 PHILLIPS AVE* SHAMWOOD ST WORKMAN AVE 55 PINE ST* END OF STREET CALIFORNIA AVE 56 PINEFALLS DR* MORGANFIELD AVE FORECASTLE AVE 57 PLATEAU DR VANDERHOOF DR END OF STREET 58 QUINELL DR. NEARPOINT DR. FORECASTLE AVE 59 RODILEE AVE RIO VERDE DR END OF STREET 60 SANDY HOOK ST* WESCOVE PL VINE AVE 61 ST. MALO ST* MERCED AVE END OF STREET 62 ST. HALO ST* VINE AVE END OF STREET 63 ST. THIRA CT* ST. MALO ST END OF STREET 64 Sunset Ave -Frontage Rd Puente Ave North City Boundary 65 SUNSET HILL DR EMERALD AVE END OF STREET 66 SUNSET HILL DR VANDERHOOF DR EMERALD AVE 67 SWANEE LN MAPLEWOOD AVE END OF STREET 68 THACKERY AVE LARK ELLEN AVE LEAF AVE 69 VALLEY VIEW AVE* NOGALES ST CITY BOUNDARY 70 VALLEY VIEW AVE* SENTOUS AVE MORGANFIELD AVE 71 VERMILLION ST* MANDERLY ST MORGANFIELD AVE 72 VERMILLION ST* MORGANFIELD AVE END OF STREET 73 VINE AVE.* CALIFORNIA AVE. SANDY HOOK ST. * WITHIN CDBG PROJECT AREA