Loading...
01-07-2003 - Award of Bid for the Construction of Concrete Bus Pads (Project #SP-03106)City of West Covina ., Memorandum AGENDA TO: Andrew G. Pasmant, City Manager ITEM NO. g -� and City Council DATE January 7, 2003 FROM: Shannon A. Yauchzee, Director/City Engineer Public Works Department SUBJECT: AWARD OF BID FOR THE CONSTRUCTION OF CONCRETE BUS PADS (PROJECT NO. SP-03106) RECOMMENDATION: It is recommended that the City Council take the following actions: 1. Authorize the transfer of $40,000 (Proposition "A" funds) from Project No. SP-03115 (Account No. 121-320-3349-7200) to Project No. SP-03106 (Account No. 121-320-3340- 7200). 2. Accept the lowest responsive bid of Gentry Brothers in the amount of $122,275 as submitted at the bid opening on December 12, 2002. 3. Authorize the Public Work Director/City Engineer and City Clerk to execute an agreement with Gentry Brothers of Irwindale, California, for the work to be done. DISCUSSION: In the past, the Maintenance Division has repaired significant areas of damaged pavement near the bus stops. These repairs have been relatively short-lived because of continuing deterioration caused by arrival and departure of buses. The current project is part of a continuing program to reduce maintenance costs, as well as inconvenience to the traveling public by constructing longer -lasting pavement at bus stop locations. Notice inviting bids for this project was advertised in the San Gabriel Valley Tribune on November 25, and December 2, 2002. In addition, the project was re -advertised in the Contractor's Green Sheets and Daily Construction, which notify the contractors of upcoming projects in Southern California. On Thursday, December 12, 2002, thirteen (13) bids were opened and reviewed for errors in the office of the City Clerk. All bids were determined to be valid. The lowest responsible bidder was Gentry Brothers of Irwindale, California in the amount of $122,275. The project consists of removal and hauling of existing asphaltic pavement at the ten bus stop areas and constructing concrete pavement, including all incidental and appurtenant work on locations shown on attached Exhibit "A". The attached Exhibit `B" indicates the summary of bids as received. ALTERNATIVES: An alternative is to reject all bids and re -advertise. Since a favorable bid was received, it is unlikely that costs would be reduced any further. Another alternative is to not do this project. This would result in not achieving the benefits of these improvements. Z:\AGENDA - 2002\Project SP-03106 Award of Bid.doc Andrew G. Pasmant, City Manager and City Council Pate 2 — January 7.2003 FISCAL IMPACT: The funds available for this project are as follows: .Account No x Amount 1. SP-03106 Proposition "A" 121-320-3340-7200 $100,000 2. SP-03115 Proposition "A" (Transferred) 121-320-3349-7200 40,000 These funds were approved as part of the 2002-2003 Capital Improvement Program (CIP) budget by the City Council. Funds to be used to complete the project is as follows: _ Item (' 1. Bid amount $122,275 2. Preliminary design 5,725 3. Construction administration and contingencies 12,000 tt tal - x EA] hi. 11 1 l ry aresh . Palkhiwala Principal Engineer Reviewed/Approved by: Attachments: Exhibits "A" and "B" Reviewed/Approved b Shannon A. Yauchzee Director/City Engineer Finance Z:\AGENDA - 2002\Project SP-03106 Award of Bid.doc Project Site BusPad Construction Exhibit A City of West Covina City Project SP-03106 Bus Pad Construction -Various Locations Citywide Bid Results 1 2 CITY PROJECT NO. SP-03108 Gentry Brothers Nobest, Inc. Tyler Paving 3 Company E.C. 4 Construction J.O.C., 5 Inc. E.G.N. Construction, 8 Inc. Sylvia Construction, 7 Inc. ITEM WORK DESCRIPTION UNIT ESTIMATEED Irwindale 626 357-9631 Westminister 714 892-5583 Los Angeles South El Monte Rancho Cucamonga ng Pomona Rands Cucamonga NO. QUANTITY Unit Price Total Unit Price Total 323 225-8014 Unit Price 626 444.9596 gas e994s41 9os s22-e22s 909 481.8118 Sawcut, remove and haul A.C. pavement, base, and native soil, Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 1 average 12' deep, including rough and finish grading, base S.F. 19,100, $ 1.60 $ 30,560.00 $ 1.50 $ 28,650.00 $ 1.40 $ 26,740.00 $ 1.89 $ 36.099.00 $ 2.50 $ 47.750.00 preparation in place complete. $ 1.70 $ 32.470.00 $ 1.82 $ 34.762.00 Construct 8"pu Portland Cement Concrete (P.C.C.) pavement 2 including all appurtenant work in place complete. C.Y. 424 $ 160.00 $ 07.840.00 $ 130.00 $ 55,120.00 $ 142.78 $ 60,538.72 $ 142.63 $ 60,475.12 $ 123.00 $ 52,152.00 $ 151.00 $ 64,024.00 $ 148.00 $ 62,752.00 Provide, place and compact crushed aggregate base in place 3 complete. Tons 520 $ 15.00 $ 7,800.00 $ 35.00 $ 18,200.00 $ 26.65 $ 13,858.00 $ 22.55 $ 11.726.00 $ 33.00 $ 17,160.00 $ 39.40 $ 20,488.00 $ 38.95 $ 20,254.00 Remove and replace concrete crub and gutter including 1 ft. wide 4 asphaltic concrete and aggregate base adjacent in place L.F. 118 $ 30.00 $ 3.540.00 $ 25.00 $ 2,950.00 $ - 20.00 $ 2,360.00 $ 20.00 $ 2,360.00 $ 24.00 $ complete. 2,832.00 $ 35.00 $ 4,130.00 . $ 26.00 $ 3,068.00 5 Replace W X 6' traffc loops in place complete. EA. 5 $ 300.00 $ 1,500.00 $ 350.00 $ 1,750.00 $ 433.00 $ 2,165.00 $ 400.00 $ 2.000.00 $ 500.00 $ 2,600.00 $ 350.00 $ 1,750.00 $ 294.00 $ 1,470.00 Work required to Install traffic control system and to maintain 6 traffic, public convenience and safety. Lump Sum 1 $ 5,000.00 $ 5.000.00 $10,000.00 $ - 10,000.00 $ 8,500.00 $ 8,500.00 $ 11,774.88 $ 11,774.88 $ 6,000.00 $ 6.000.00 $ 3.100.00 $ 3,100.00 $ 13,600.00 $ 13,600.00 Remove and replace existing concrete sidewalk in kind in place 7 complete. S.F. 207 $ 5.00 $ 1.035.00 $ 5.00 $ 1,035.00 $ 5.00 $ 1.035.00 $ 5.00 $ 1,035.00 $ 4.00 $ 828.00 $ 6.50 $ 1,345.50 $ - 4.95 $ 1,024.65 8 Construct minimum 4" thick A.C. (C2-AR4000) Tons 50 $ 100.00 $ 5,000.00 $ 126.00 $ 6,300.00 $ 204.00 $ 10,200.00 $ 167.50 $ 8.375.00 $ 150.00 $ 7,500.00 $ . 330.00 $ 16,500.00 $ 171.50 $ 8,575.00 Base Bid Total $ 122,275.0a $ 124,005.00 S 125,396.72 $ 133,845.00 $ 136,722.00 $ 143,807.50 $ 1 145.505.66 8 Damon Construction Co. Carson 310 324-7141 Unit Price Total $ 1.28 $ 24,448.00 9 Ranm Corporation Brea 714 992-2500 Unit Price Total $ 2.58 $ 49,278.00 10 Kalban, Inc. Sun Valley 818 504-1065 Unit Price Total $ 2.50 $ 47,750.00 11 Olivas Valdez, Inc. Covina 626 915-7633 Unit Price Total $ 2:77 $ 52,907.00 12 E.A. Mendoza, Inc. Irvine 949 789.9100 Unit Price Total $ ' 3.85 $ 73,535.00 13 KDMG, Inc. Brea 714 993-7308 Unit Price Total $ 8.00 $ 152,800.00 $ 205.00 $ 86,920.00 $ 175.92 $ 74.590.08 $ 210.00 $ 89.040.00 $ 210.00 $ 89,040.00 $ 182.00 $ 77.168.00 $ 225.00 $ 95,400.00 $ 40.00 $ 20,800.00 $ 40.00 $ 20,800.00 $ 40.00 $ 20,800.00 $ 53.50 $ 27,820.00 $ 50.00 $ 26,000.00 $ 16.00 $ 8,320.00 $ 25.00 $ 2,950.00 $ 20.00 $ 2,360.00 $ 40.00 $ 4,720.00 $ 18.15 $ - 2,141.70. $ 30.00 $ 3.540.00 $ 32.00 $ 3,776.00 $ 500.00 $ 2,600.00 $ 300.00 $ 1,500.00 $ 310.00 $ 1.550.00 $ 420.00 $ 2.100.00 $ 400.00 $ -2,000.00 $ 50.00 $ 250.00 $ 5,000:00 $ 5,000.00 $ 2,000.00 $ 21.000.00 $ 4,000.00 $ 4,000.00 $ 7,900.00 $ 7,900.00 $ '5,000.00 $ _6.000.00 $ 12,000.00 $ 12,000.00 $ 6.00 $ 1,242.00 $ 4.25 $ 879.75 $ 5.00 $ 1,035.00 $ 4.00 $ 828.00 $. 5.00 $ 1,035.00 $ 8.75 $ 1,811.25 $ 100.00 $ 5.000.00 $ 135.00 $ 6,750.00 $ 105.00 $ 5,250.00 $-145.75 $ 7,287.50 $ 200.00 $ 10,000.00 $ 85.00 $ 4,250.00 $ 148,860.00 $ 158,157.83 $ 174,1 55.00 $ 190,024.20 $ 198,278.00 S 278,607.25 12 F-