01-06-1998 - Curb & Gutter Repair & Sidewalk Construction - Approval of Plans & Specs - Project #SP-98103Olemorandum
TO: City Manager and City Council AGENDA
ITEM NO. 13-7a
FROM: Patrick J. Glover
City Engineer/Public Works Director
DATE January 6, 1998
SUBJECT: PROJECT NO. SP-98103
CURBIAND GUTTER REPAIR AND SIDEWALK CONSTRUCTION
- APPROVAL OF PLANS AND SPECIFICATIONS
SUMMARY: Plans and specifications have been .completed for Project No. SP-
98103, which provides for the repair of damaged curb, gutter,
sidewalk, and driveway aprons, in various locations citywide.
Estimated cost for this project is $150,000.
BACKGROUND
The City repairs damaged curb, gutter and driveway aprons each year in an effort to
maintain its existing infrastructure at an acceptable level. This damage may be caused by
extensive wear and tear, subgrade settlement, or growth of tree roots.
Staff has complete
work as the preser
prepared and will k
consists of remova
approaches, concr(
Due to the availabi
four times the size
represent salary sa,
is funded, by the G
order to maintain &
vacancies have cre
to be completed.
ANALYSIS
a list of various locations (see attached) to accommodate as much
project funding will allow. The plans and specifications have been
available at the Council Meeting on January.6, 1998. The project
hauling and replacement of existing concrete curb, gutter, driveway
sidewalk and all incidental and appurtenant work.
y of additional Gas Tax Funds, this year's project is approximately
)f previous curb and gutter repair projects. These additional funds
ngs resulting from vacancies in the street maintenance section which
s Tax. The current vacancies are a result of not filling positions in
;ability in dealing with a possible sale of the Water Department. The
ted a backlog of curb, gutter, and sidewalk repair projects that need
A routine maintenance program is needed to preserve existing infrastructure in a cost-
effective manner. This will reduce potential public liability and reduce damage to the
existing asphaltic pavement by restoring the designed street drainage pattern. This
project will also aid the City's maintenance efforts.
Pursuant to the California Environmental Quality. Act, State Guidelines, Section 15302-
Class 2, the aforesaid improvements are of a minor nature and, therefore, excempt
from the requirements for Environmental Impact , Report or Negative Declaration of
Environmental Impact.
FISCAL IMPACT
The estimated total cost for this project is as follows:
1. Construction Cost $125,400
2. Preliminaary Engineering 6,000
3. Construction Engineering, Inspection 10,000
4. Contingencies 8,600
Total Project Cost Estimate: $150,000
e
City Manager and City Council
January 6, 1998
Page Two
The fund available for this project is as follows:
i
1. Project No. SP-98103 (Gas Tax Fund) $ 504000`
2. Salary Savings from Maintenance Sitreet Operations (Gas Tax Fund) 12$ 0,000
Total Cost: $170,000
ALTERNATIVES
The only viable alternative to this project is to perform the task in-house which requires
hiring more full-time personnel, purchasing and/or renting additional equipment and
appropriating additional funds.
RECOMMENDATION
It is recommended that the City Council approve the plans and specifications for Project
No. SP-98103, and authorize the City Engineer to call for bids.
4"Cl d&----
P rick J. Glover
City Engineer/Public Works Director
PJG:OC: ct:97-155
Attachment
PROJECT No. SP-98103
CURB AND GUTTER REPAIR
Owl
PROJECT LOCATIONS
1 Fr.
CURB & GUTTER
2 FT.
CURB & GUTTER
4" P.C.C.
SIDEWALK
DRIVEWAY
APPROACH
ALWOOD(638)
53.0.FT
2
ALWOOD(1930)
28.0 FT
3
ASTELL(204)
42:0 FT
4
BAINBRIDGE(1132)
36.o FT
5
BELMONT(1549)
74.0 FT
6
CABANA(1950)
57.0 FT
%
CARVOL(541)
50.0 FT
8
DELVALE(1513) .
115.0 FT
9
ELGENIA(1052)
38.0 FT
10
EVERGREEN(2301)
76.0 FT
11
FRANCISQUITO(1721)
67.0 FT
95.0 FTA2
12
FRANCISQUITO(1727)
110.0 FT
95.0, FTA2
13
FRANDALE(1429)
130.0 FT
14
FRANDALE(1441)
25.0 FT
15
FRANDALE(1447)
32.0 FT
160.0 FTA2
16
GLENVIEW(928)
162.0 FT
150.0 FTA2
17
GLENVIEW(1014)
42.0 FT
12.0 FTA2
18
GROVECENTER(1036)
49.0 FT
19
GROVECENTER(1046)
50.0 FT
90.0 FTA2
20
IDAHOME(1219)
88.0 FT
150.0 FTA2
21.
LANO(1619)
71.0 FT
22
LANO(1766)
42.0 FT
23
LANG(1770)
47.0 FT
24
LANO(1804)
31.0 FT
25
MARBURY E.(1539)
15.0 FT
26
MEEKER(1611)
52.0 FT
27
NEIL(411)
21.0 FT
2..8
NEIiL(415)
94.0 FT
29
NORMA(2035)
46.0 FT
30
RAMA(1611)
36.0 FT
31
SHADYDALE(302)
650 FT
32
SPRUCE(1106)
34.0 FT
33
VERNESS(1358)
59.0 FT
34
ALASKA E.(2251)
34.0 FT
37
38
39
40.
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
i
l
PROJECT LOCATIONS
CURB & GUTTER
CURB & CUTTER
SIDEWALK
EWAY
APR ACH 4
ALASKA E.(2319)
103.0 FT
ALASKA E.(2327)
75.0 FT
65.0 FT^2 1
ALWOOD W.(2021)
15.0FT
BAINBRIDGE W.(1310)
32.0 FT
f
BROOKFIELD S.(2712)
35.0 FT
CALIFORNIA S.(1.100)
36.0 FT
j
CAMERON E.(1700)
I
3 LO FT
288.0 FT^2
j
CHETNEY W.(1632)
42.0 FT.
140.0 FT^2�
CONLON S.(1541)
16.0 FT
CORTEZ E.(2035)
165.0 FT
i
DONNA BETH S.(1003)
54.0 FT
DONNA BETH S.(1008)
44.0 FT
DONNA BETH S.(1009)
40.0 FT
FARLINGTON W.(1320)
64.0 FT
FARLINGTON W.(1327)
75.0 FT
FARLINGTON W.(1621)
110.0 FT
FARLINGTON W.(1634)
91.0 FT
FERNWOOD S.(410)
48.0 FT
FERNWOOD S.(415)
25.0 FT
50.0 FT
FORREST S.(1618)
GLENDALE W.(1013)
27.0 FT
GLENDALE W.(1019)
20.0 FT
GLENDALE W.(1023)
3.0 FT
GLENDORA S.(801)
112.0 FT
59
GLENDORA S.(1415)
30.0' FT
60
GLENMERE W.(1302)
10.0 FT
61
GLENMERE W.(1308)
40.0 FT
i
62
GLENMERE W.(1920)
60.0 FT
r-63-1--
GLENN ALAN S.(1003)
23.0 FT
64
HAVENBROOK W.(2509)
65.0 FT
65
HEDGEROW S.(3532)
57.0 FT
I
66
HILLWARD S.(411)
51.0 FT
{
67
HILLWARD S.(414)
{ 39.0 FT
40.0 FT^2
68
HILLWARD S.(525)
37.0 FT
69
LA SENA N.(614)
79.0 FT
70
LA SENA N.(620)
60.0 FT
81.0 FT^2
71
_
LA SENA N.(643)
LANG S. 1623
46.0 FT
70.0 FT^2 1
72
21.0 FT
73
LLUCILLE E.(724)
66.0 FT
PROJECT LOCATIONS
CURB & GUTTER
CURB GUTTER
SIDEWALK
APPROACH
74
LYALLN.(608)
40.0 FT
75
LYALLIN.(612)
42.0 FT
76
MEADOW S.(401)
24.0 FT
77
MEEKER S.(1324)
81.0 FT
176.0 FT^2
78 .
MEEKER S.(1604)
34.0 FT
79
MEEKER S.(1605)
130.0 FT^2
80
MERCEDI W.(1018)
39.0 FT
81
MICHELLE E.(617)
80.0 FT2
82
MICHELLE E.(640)
30.0 FT
83.
MOBECK E.(1714)
100.0 FT2
84
MOBECK E.(1720)
55.0 FT^2
85
MULLENDER S.(1212)
31.0 FT
86
MULLENDER S.(1216)
28.0 FT
87
MULLENDER S.(1224)
51.0 FT
88
MULLENDER S.(1301)
58.6 FT
89
NADINE IS.(2445)
33.0 FT
100.0 FT^2
90
NOLANDAI! E W.(1621)
82.0 FT
80.0 FT^2
91
OAK PARK W.(931)
62.0 FT
92
OAK PARK W.(932)
- - - - OAK PARK W.(945)
52.0 FT
63.0 FT
---
----„
93
94
ORANGEIS.(1627) .
37.0FT
95
PINE W:(1107,)
38.0 FT
96
PORTNER E.(1808)
40.0 FT
97
PORTNER E.(1816)
95.0 FT
98
RIO VERDE E.(2147)
198.0 FT
99
RIO VERDE E.(2226)
181.0 FT
100
ROWLAND E.(1839)
53.0 FT .
114.0 FT^2
101
SERVICE E.(1140)
38.0 FT
102
SHADYDALE N.(426)
40.0 FT
103
SHADYDALE N.(509)
24.0 FT
104
SHADYDALE N.(523)
31.0 FT
105
SHADYDALE N.(531)
40.0 FT
106
SHADYDALE N.(537)
45.0 FT
107
SHADYDALE N.(540)
46.0 FT
108
SHADYDALE N.(547)
42.0 FT
109
SHAMWOOD E.(2023)
----------
63.0 FT
---------- -
-- ------ -----_
- -.
110
SIESTA S
-----------_. __._
111
ST. MALO S.(637)
33.0 FT
112
ST. MALOi S.(1407)
20.0 FT
125.0 FT^2
PROJECT LOCATIONS
I FT.
CURB & GUTTER
2 Fr.
CURB & GUTTER
4" P.C.C.
SIDEWALK
DRIVEWAY
APPROACH
113
TAMER S.(1649)
41.0 FT
114
TOLAND N.(311)
28.0 FT
115
TRENTON WAY W. 1015
( )
65.0 FT
116
VERNESS E.(1220)
31.0FT
117
VERNESS E.(1234)
21.0 FT
118
VINE E.(1405)
13.0 FT
280.0 FT
119 -
VINE E.(1901)
34.0 FT
120
VINE E.(1901)
30.0 FT
121
VINE E.(2519)
50.0 FT
122
WORKMAN E.(1832)
137.0 FT
123
WORKMAN E(2700)
53.0 FT
124
YARNELL; W.(2107)
31.0 FT
50.0 FT^2
125
YARNELL W.(2109)
26.O FT
TOTAL
4814 L.F.
1071 L.F.
1981 FT^2
1220. FT^2