01-21-1997 - Construction of Sidewalks/Wheelchair Ramps - SP-961055 10 TO: City ager and City Council City of West Covina *'Memorandum AGENDA ITEM NO. C-5'a FROM: Patrick J. Glover City Engineer/Public Works Director DATE January 21, 1997 SUBJECT: PROJECT NO. SP-96105 CONSTRUCTION OF SIDEWALKSMHEELCHAIR RAMPS SUMMARY: Twelve (12) bids were received and opened on January 8, 1997, for this project which consists of the construction of concrete sidewalks and wheelchair ramps to provide for safer pedestrian use, and to remove barriers that hinder the mobility of physically .challenged persons. The lowest responsible bid is $89,450.00 from Chino Construction Inc. of Chino, California. BACKGROUND On December 17, 1996, the City Council approved plans and specifications and authorized the City Engineer to call for bids for Project SP-96105 which calls for the construction of sidewalks and wheelchair ramps in various locations throughout the City. Some of the locations were requested by residents and the remaining were recommended by the staff in order to provide for safer mobility of the residents. Two new locations have been selected for the construction of sidewalks. 1. Valley Boulevard (north side) from about 300 feet west of Morganfield to east City limit. Total length is about 1,015 feet and the width is 7 feet. 2. Rowland Avenue (south side) from Neil Street to east City limit. Total length is about 235 feet and the width is 4 feet. The other part of the project is the construction of one hundred six (106) wheelchair ramps as shown on the attached list. Bid opening was on January 8, 1997. Twelve (12) bids were received and checked for errors and all were determined to be valid. ANALYSIS The estimated construction cost for this project as submitted in our memorandum on December 17, 1996 was $109,000. The construction cost of the low bidder is $89,450.00. The attached tabulation indicates the summary of bids received. Due to. a favorable low bid, there is about $19,000 that can be used to have more locations added to the project. FISCAL IMPACT Funding for this project is from the Transportation Development Act (TDA) funds of $129,000. Funding should be provided as follows: 1. Project Construction Cost $89,450.00 2. Preliminary Engineering 5,000.00 3. Construction'Engineering Inspection 6,000.00 4. Contingencies 9,550.00 TOTAL $ 110,000.00 0 .0 SP-96105 CONSTRUCTION OF SIDEWALK / WHEELCHAIR RAMPS WHEELCHAIR RAMP LIST „l `p AZUSA AVE./WALNUT CREEK PARKWAY N/E 1 2 BADILLO ST.NINCENT AVE. SNW, S/E 2 3 CABANA/FRANCISQUITO AVE. NNW 1 CAMERON AVE./CAJON AVE. ALL FOUR 4 ng F, �5 CAMERON AVE./DONNABETH AVE. ALL FOUR. 4 6r" CAMERON AVE./GLEN ALAN AVE. ALL FOUR 4 CAMERON AVE./HILLWARD AVE. ALL FOUR 4 8� CAMERON AVE./TERRI ANN DR. ALL FOUR 4 E 9 W �I, DURNESS ST./BROADMOOR AVE. N/W, N/E 2 1p� DURNESS ST./CONLON AVE. S/E 1 DURNESS ST./SUNSET AVE. NNW, N/E, S/E 3 12� DURNESS ST./TROJAN N/W, N/E 2 13 FRANCISQUITO AVE./CALIFORNIA AVE. N/W, N/E 2 ��14 •,.3 GLENDORA AVE/@ ALLEY BEHIND 266 & 308 2 GRAND AVE./CORTEZ ST. NNW, N/E 2 ,16-rl MERCED AVE./BUBBLING WELL S/W, S/E 2 „r1 = MERCED AVE./HOLLENBECK ST. ALL FOUR 4 Mir 1'8 PUENTE AVE./BROADMOOR AVE. N/W, N/E 2 PUENTE AVE./CHAPMAN ST. ALL FOUR 4 20v PUENTE AVE./HARTLEY ST. N/W, N/E 2 y 2 g PUENTE AVE./MORADA AVE. NNW, N/E 2 �22 NEIPUENTE AVE./ORANGE AVE. ALL FOUR 4 �23 PUENTE AVE./SHADYDALE AVE. NNW, N/E 2 �24 PUENTE AVE./SUNSET AVE. ALL FOUR 4 25 PUENTE AVE./WALNUTHAVEN N/W, N/E 2 l" ROWLAND AVE./BROADMOOR AVE. N/W, N/E 2 27 _ ROWLAND AVEICHAPMAN ST. NNW, N/E 2 28 ROWLAND AVE./EDITH AVE. N/W, N/E 2 �29 ROWLAND AVE./HARTLEY ST. N/W, N/E 2 ROWLAND AVE./MORADA AVE. NNW, N/E 2 31 ROWLAND AVE./NEIL ST. S/E 1 32 ROWLAND AVE./SHADYDALE AVE. N/W, N/E 2 33; ROWLAND AVE./TAYLOR CT. N/W, N/E 2 VINCENT AVE./GROVECENTER ST. N/W 1 ' 35 VINE AVE./CITRUS AVE. N/W, N/E 2 VINE AVE./HOLLENBECK ST. ALL FOUR 4 NSEQ r-`. WORKMAN AVE./BROADMOOR AVE. SNW, S/E 2 WORKMAN AVE./ELLEN DR. SNW, S/E 2 33 WORKMAN AVE./HARTLEY ST. SAW, S/E 2 4Q WORKMAN AVE./MORADA AVE. SNW, S/E 2 41 = WORKMAN AVE./SHADYDALE AVE. SNW, S/E 2 42 WORKMAN AVE./SUNSET AVE. ALL FOUR 4 43 A JR WORKMAN AVE./WALNUTHAVEN DR. SNW, S/E 2 44 � WORMAN AVE./ORANGE AVE. N/E, S/E 2 TOTAL NUMBER OF WCR'S TO BE CONSTRUCTED07 WIN.XLS.BOB.WCRCONZ CONST BID SUMMARY PROJECT NO. SP-96105 I OF SIDEWALKSNVHEELCHAIR RAMPS BIDS RECEIVED 1 Chino Construction, Inc. Chino $89,450.00 2 Kalban Inca Sun Valley 93,210.00 3 J.D.C., Inc. Rancho Cucamonga 96,758.00 4 Rancho Corp. Brea 98,990.00 5 Calfon Construction, Inc. Rialto 99,844.00 6 Martinez Concrete Inc. Azusa 100,800.00 7 E.A. Mendoza Anaheim 104,110.00 8 J.H. Rental,j Inc. Orange 109,400.00 9 R. Fox Construction, Inc. Anaheim 116,286.00 10 Bopark Enterprises Huntington 117,450.00 11 Damon Construction Carson 117,800.00 12 EBS Inc. Tustin 128,242.00 City Manager and City Council January 21, 1997 Page Two ALTERNATIVES The only alternative is to reject all bids and re -advertise. Since a favorable bid was received, it is unlikely that costs would be reduced any further. RECOMMENDATION It is recommended that the City Council accept the bid of Chino Construction, Inc. in the amount of $89,450.00, as submitted at the bid opening on January 8, 1997, and authorize the Major and City Clerk to execute an Agreement with said Chino Construction, Inc. of Chino, California, for the work to be done. PJG:OC:ct SP96105.aWd Attachment