Loading...
02-07-1995 - Curb Address PaintingTO:' FROM: lUlfJJ:l:l: SUA04ARY: ej oil The City contracted addresses throughout 24,000 addresses on took approximately ; acceptance of -the we of work and elected Council concerns as The specifications fc existing numbers an painted onto the bac. The specifications u: painting project aboi quality of the work. In the interim, out individuals, without background, heights quality of paint mate by 6" background a In many cases, it we numbering system R removal is not withi and various number: were ' written. Staff to the difference in 1 To prevent similar background size w painting• i None at this time. specifications for a City of West Covina Memorandum City Manager and City Council AGENDA ITEM NO. C-6b Patrick L Glover City Engineer/Public Works Director. DATE February 7, 1995 On January 17th, 1995, the City Council held over acceptance, of improvements from IPS, Inc., the curb address painting contractor, to provide an opportunity to respond to inquiries from the ,City Council concerning the quality of the work. vith IPS Inc., in June of 1994, to paint residential and commercial the City of West Covina. This project entailed the planing of some :he curb face of commensal and residential properties. The contract x months to complete and upon completion, Staff recommended rk performed. The City Council expressed some concern as to6'quality o hold over the acceptance of the work. This report addresses I' the o the curb painting contract. the project called for the scraping and removal of loose paint from the placing of a 12" by 6" white background with 4" black numbers ground. Glass bead material was then applied for reflective purposes. d for this project were the same as those used in the previous address five years ago. There were no complaints at that time concerning the treet number painting has been placed throughout the City by j uthorization and not to the required specifications. Various types of and lengths and numbers were used, all having been placed with varying ials and dimensions. IPS,Inc. was required to place the specified 12" r non -conforming existing backgrounds that could be up to 20" wide. old have been difficult to completely remove the previously existing shout high powered equipment such as sand blasting. This extent of the scope of the address painting contract. The various backgrounds were unexpected and were not addressed when the project specifications eceived several complaints concerning quality with the majority related z background sizes. Dblems on any future address painting contract, the required white W increased to 20 inches wide. This size should cover any previous er, an increase in cost will occur in future contracts with background area. City Council Report February 7, 1995 Page Two An alternative is to direct staff to negotiate a change order with IPS, Inc., for removal of excess previous background paint prior to acceptance of work. This alternative would be comparatively costly for the benefit to be gained. RECO1VIlViMATION: It is recommended that the City Council accept the work of IPS, Inc. for Curb Address Painting Project SP-94109. Atrick J. City Engineer/Public Works Director PJG:LMWawm-%ia