02-01-1994 - City Project #PP-93211 - Approve Plans & Specs - Friendship Park Baseball Field LightingTO: _ City Manager and City Council City of West Covina Memorandum FROM: Harry W . Thomas SUBJECT: . CITY PROJECT PP-93211 - APPROVE PLANS AND SPECIFICATIONS - FRIENDSHIP PARK BASEBALL FIELD LIGHTING AGENDA ITEM NO. 0-1 DATE February 1, 1994 SUMMARY: The Plans and Specifications for City Project PP-93211 have been completed. The project will provide sports lighting for the baseball field in Friendship Park. The ultimate cost of this project is estimated to be $88,000. BACKGROUND Friendship Park is located along the east side of Sentous Avenue and north of the Hollingsworth School. There are three picnic shelters, restrooms, .concrete walks, on site parking and security lighting throughout the park. The existing baseball field is fenced and has bleachers and a concession stand. Three is no athletic lighting existing in Friendship Park. The Human Resources Commission recommended the installation of sports lighting for the baseball field and the project was included .in the 1992-93 Capital Improvement Program. The plans and specifications have been reviewed by the Human Services and Maintenance Departments. The Planning Commission and City Council have approved the amended specific_ plan. ANALYSIS This project will provide six galvanized steel support poles with a total of twenty-six 1000 watt Metal Halide lighting fixtures. The sports lighting system will provide average illumination levels of 30 and 20 footcandles on the infield and outfield, respectively. These illumination levels are in accordance with national standards. Staff has required that all fixtures be equipped with glare shields and that spill -over lighting onto abutting and nearby residential property shall not exceed .1 footcandle. . The sports lighting system shall be operated by a key switch located in the park restroom storage room. The ballfield lighting controls shall be designed to operate key switch on and off and time clock off. This is to say that if. the sports lighting is not manually turned off by 10:00 p.m., the time clock can automatically turn the lights off. The following is a projected work schedule for this project: IFebruary 8 - Plans and Specifications available for purchase; March 15 - Bid Opening; April 5 - Award of Contract; April 26 - Execution of contract and posting of surety bonds; May 10 - Order electroliers and appurtenant materials; July 5 to August 30 - Delivery of electroliers; July 19 to September 13 - Start of Construction; August 30 to October 25 - Energize ballfield lights. The delivery of electroliers and subsequent construction work is estimated to fall within an 18-week timeframe. The relatively large electroliers necessary for baseball sports lighting are not readily available from manufacturers and are. usually manufactured after receipt of the order from the Contractor. The typical timeframe for the manufacture and delivery of such electroliers varies from eight to sixteen weeks with the average at twelve weeks. Galaxie Little League will end its regular season during July. League officials have no' objections to beginning the construction before the end of their regular season. Provisions within the specifications prohibit any conduit installation or excavation within the fenced ballfield playing field. This provision will preserve the existing turf and avoid any conflict with Little League activities. agenda:pp93211.p&s City Manager and City Cold City Project PP-93211 Approve Plans and Specifications Page 2 February 1, 1994 ANALYSIS Pursuant to Government code, Section 65405(b), the above improvements are of a minor nature and, therefore, the project is categorically exempt from the requirements for an Environmental Impact Report. FISCAL IMPACT There is $100,000 budgeted in the 1992-93 Capital Improvement Program for the installation of sports lighting for the Friendship Park Baseball Field. These funds were allocated from CMD funds. The Engineer's estimate for the project is $88,000. This includes $80,000 for Construction and $8,000 for Engineering, Inspection and Contingencies. ALTERNATIVES There is no alternative to proceeding with this project if baseball field sports lighting is to be provided at Friendship Park. RECON01ENDATION It is recommended that the City Council approve the plans and specifications for PP-93211 and authorize the City Engineer to call for bids. 4rry W. Thomas Public Works Division Manager/City Engineer HWT:GJW:cn Attachments