Loading...
02-04-1992 - Amar Road Water Line - Phase II WP-87126• 0 City of West Covina Memorandum To: From: Subject: Location: City. Manager & City Council Harry W. Thomas AGENDA ITEM NO. C-6b DATE February 4, .1992 WP87126-AWARD OF BID-AMAR ROAD WATER LINE -PHASE II Amar Road, 600' West of Countryside, to Grand Avenue in the City of Walnut .Summary: Bids were opened on Wednesday, January 22, 1992 for the installation of a 30" water main on Amar, 600' west of Countryside Drive to Grand Avenue in the City of Walnut. The lowest responsible bidder is W.A. Rasic Construction of Arcadia in the amount of $939,212.00. Background: The bids for City Project WP87126-II were opened in the City Clerk's office on Wednesday, January 22, 1992. A total of twenty-three (23) bids were received, checked for errors and determined to be valid bids. This projectis the final phase of the construction of the Amar Road Water Line, which will extend from Reservoir No. 2 near the easterly City boundary to Grand Avenue. This water line will connect to the Grand Avenue Transmission Main and will provide a reliable secondary source of water for. the City's customers. The Walnut Valley Water District is the lead agency for the Grand Avenue line and the contract for the construction of this water line was awarded in November, 1991. Analysis The City Water Department has one primary connection and supply line to our water service area, which is the connection to the Metropolitan Water District's (MWD) middle feeder in Badillo Avenue and the City's transmission main in Azusa Avenue, respectively. If a major problem arose with the source of supply, the City would find it difficult to serve its customers for an extended period or during times of peak demand, even though the system has inter -ties with other water purveyors. The City is in need of a reliable secondary source of water supply in order to ensure its customers of adequate service. The City has no water rights and consequently cannot drill any wells and take any additional water from the main San Gabriel Basin. i • Fiscal Impact: -2- The funds for this project are available from the water bonds which were sold in 1990. The funds available are $1,800,000. The consultant's estimate for construction was $1,139,000 plus 10% for engineering, inspection, contingencies, etc. for a total project cost of $';1,253,000. The actual construction cost of the low bidder is $939,212. The attached tabulation indicates the summary of bids as received. When this line becomes operational, water can be delivered by gravity flow from the Grand Avenue line directly into the Zone II Reservoir.The savings from reduced pumping costs is estimated at $125,000 per year. Further, due to differing pricing policies between the Upper San Gabriel Valley Municipal Water District and the Three Valleys Municipal Water District, savings of $48,000 per year in water charges could be realized. Alternatives: There is no alternative to this portion of the project as construction on Phase I is nearing completion and the City has executed a Participation Agreement with Walnut Valley Water District for the Grand Avenue Transmission Main and is financially committed to share in� the costs of that project. RECOMMENDATION: It is recommended that the, City Council accept the bid of W.A. Rasic Construction Company Inc., of Arcadia in the amount of $939,212 and authorize the Mayor and City Clerk to execute an agreement with said W.A. Rasic for the work to be done. W. Thomas Public Works Division Manager/City Engineer /attachment HWT:JWG:lw-Secaward 0 0 0 -3- BID SUMMARY - CITY PROJECT WP87126 AMAR ROAD WATER LINE No. Contractor City Bid Amount 1 W.A.Rasic Const.Co. Arcadia $ 939,212.00 2 L.D.M. Pipeline Inc. Baldwin Park 978,948.00 3 Dorfman Const.Co.Inc. Woodland Hills 994,464.00 4 Albert W. Davies Inc. Rancho Cucamonga 1,004,086.00 5 Miramontes Const.Co.Inc. Industry 1,056,791.00 6 Williams Supply Co. Inc. Ventura 1,065,008.00 7 Simich/Masonovich,Joint Arcadia 1,081,054.00 8 McGrand & Assoc. Calimesa ' 1,100,765.00 9 Peter David Co. Inc. Laguna Hills 1,109,846.00 10 Calfon Const.Inc. Rialto 1,121,530.00 11 Cass Const. Inc. El Cajon 1,173,917.00 12 Kershaw Const.Co.Inc. Fontana 1,179,094.00 13 C.K. Construction Long Beach 1,257,350.00 14 B. Wayne Corp. Colton 1,273,825.00 15 W.M. Lyles Co. Fresno 1,326,075.00 16 Mike Prlich & Sons S.EI Monte 1,348,924.00 17 Anro Const.Co. Buena Park 1,411,013.00 18 C.P. Const. Co. Ontario 1,442,438.00 19 T.A. Rivard Inc. Riverside 1,444,444.00 20 Griffith Co. Santa Fe Springs 1,468,035.40 21 Bramak Corp Temecula 1,492,958.30 22 Murray Co. Rancho Dominguez 1,520,531.90 23 Byron L. Crume Inc. Corona 1,541,031.00 Engineer's Estimate $1,139,000 Low Bid below Engineer's Est. 17.54 % Average Bid $1,232,015 - 8.17% above Engineer's Estimate DE DRIVE '--,APROJECT SITE PHASE I (C-Ow%PLET6,15) VICINITY MAP. 140 SCALE 0 CITY PROJECT W.P.67126E AMAR ROAD WATER LINE