Loading...
02-01-1994 - GP-94-312 - Maintenance of HVAC Equipment in 12 City Owned Bldgs.City of West Covina Memorandum To CITY MANAGER AND CITY COUNCIL AGENDArxoMPATRICK J. GLOVER ITEM NO. C-7b MAINTENANCE DIRECTOR SUBJECT: GP-94-312 - AWARD OF CONTRACT FOR THE DATE February 1 , 1994 MAINTENANCE OF HEATING AND AIR CONDITIONING EQUIPMENT IN TWELVE CITY OWNED BUILDINGS SUMMARY: On January 21, 1994, five bids were received and opened for this contract which provides for the maintenance of heating and air conditioning equipment for three yearn in twelve City owned buildings. The lowest bid received was $95,064 from Abban Industries of Rancho Cucamonga. BACKGROUND For the past 22 years, the maintenance of heating and air conditioning in City owned buildings has been done by private contractors. The current contractor is ACCO of Glendale, who has been maintaining the City's air conditioning equipment for the past nine years. The current contract price for maintaining heating and air conditioning equipment in 12 City buildings is .$4,026.00 per month or $48,312 per year. In October of last year, City Council approved new plans and specifications for this'contract. Requests for bids were advertised in the San Gabriel Tribune on January 4 and 1.1, 1994. A job walk-through was attended by eight contractors on January 13, 1994. On January 21, 1994, five bids for this project were opened and reviewed in the office of the City Clerk.., The lowest bidder was Abban Industries for $95,064 for a three year contract. This results in a monthly price of $2,641. This monthly cost is 34 % lower than our current contract price and is based on a new set of specifications which provide for a much higher level of service than the specifications currently in place.. A summary of the bids received is as follows: No. Contractor City Monthly Amount Bid Amount 1 Abban Industries Rancho Cucamonga $2,640.66 $ 95,064.00 2 ACCO Air Conditioning Glendale 4,575.00 164,700.00 3 Cal -Air Inc. Whittier 5,253.00 189,108.00 4 F.M. Thomas Brew 6,963.16 250,674.00 5 Barr Engineering, Inc. Santa Fe Springs_ 7,684.00 276,624.00 ANALYSIS Based on. the new specifications which provides for a much increased level of service, staff estimated the new contract price to be approximately $5,000 per month or $180,000 for a three year contract. The bid submitted by Abban Industries is $2,641 per month which is 34% lower than our current contract and 42 % lower than the second lowest bid by ACCO Air Conditioning of Glendale. Based, on this bid amount, staff requests additional time to investigate the bid submitted by Abban Industries. In addition, staff will contact other companies that are contracted with Abban Industries for heating and air conditioning maintenance to verify their past performance. standards. As the City of West Covina looks for every opportunity to save energy costs, it is imperative that our equipment is maintained. at its peak efficiency. FISCAL IMPACT Sufficient funds have been allocated in the Maintenance Department's budget to cover the service contract during FY 1993-94. RECOMMENDATION It is recommended that the City Council postpone the award of this contract until the March 1, 1994 City Council Meeting to allow staff adequate time to evaluate the performance capabilities of the low bidder, Abban Industries of Rancho Cucamonga. Approved _ atrick J. ove Maintenance etor W. Thomas Public Works Division Manager, City Engineer 202-94