This is an updated report on the STATUS OF PLANS FOR BKK
LANDFILL CLOSURE and other related BKK matters.
The latest edition of the STATUS OF PLANS FOR BKK LANDFILL CLOSURE is
attached. This is a part of the City Community Outreach Program to keep the community
informed of the progress toward implementation of the closure plans for the BKK
Landfill.
The following is a list summarizing the BKK Landfill Closure Activities Progress for the
last 30 days. Any changes made from last month's report will be in bold.
1. Grading Plans
2. Landscaping of Class III Landfill
3. Landscaping of the Class I Landfill
4. Landscaping to Screen the Class I Landfill
5. Azusa Frontage Screening
6. Dust Control Plan
7. Class III Landfill Final Closure and Postclosure Plan
8. Class I Landfill Postclosure Plan
RECOMMENDATION:
It is recommended that the City Council receive and file this report.
L,
Steven L. Samaniego, R.E.
Environmental Management Director
Attachments: Status of Plans for BKK Landfill Closure
bkk/stat59
SLS
1 /22/02
PRINTED ON RECYCLED PAPER
STATUS OOLANS FOR BKK LANDIOL CLOSURE
as of December 4, 2001
1.
GRADING PLAN
BKK has completed the placement of final cover soils in accordance with
the approved partial final closure plan. Since final cover soils are no
longer needed for partial closure, BKK has stopped the grading of the
southwest ridge and west ridge (along Azusa Avenue). Upon approval of
the complete site Final Closure Plan, BKK will continue the grading along
Azusa Avenue for landfill cover soils. The westerly ridgelines highest
elevation point prior to grading was approximately 675 feet. Since the
grading, the current elevation as of Wednesday, October 13, 1999 is
approximately 650 feet. Therefore, BKK has graded approximately 25 feet
of the hillside.
2. -
LANDSCAPING OF CLASS III LANDFILL
The landscape work has been divided into five major phases, termed
Phases A through E (see attached map). Phase A and B landscape work
has been completed. In February and March 2001, California Integrated
Waste Management Board, Regional Water Quality Control Board and
Local Enforcement Agency approved BKK's revision to the Partial Final
Closure Plan to defer Phase C Landscaping until the golf course is built.
The CIWMB on April 12, 2001 approved BKK's proposed Partial Final
Closure Plan Landscape C amendment to hydroseed and install a
temporary screen of boxed trees along the second and third uppermost
benches at the northwest corner of Phase C. The tree screening was
completed in May 2001. Landscaping of the remaining Phases D and E are
elements of the Final Closure Plan (See Item 7 below).
Phase A Slope C west facing in the central portion has a sparse number of
trees planted from pots. BKK has agreed to plant some additional trees on
that slope during the Phase C landscaping.
Weeding on the Class III Landfill is often very slow. Weeds have been
allowed to get tall, thick, flower and seed before weeding. Tall weeds
hinder irrigation coverage and inspections. The bermuda grass has been
spreading without adequate weed control management by BKK. It appears
that the weeding crew is not adequately staffed to manage the weeds.
Many trees have grown pretty tall and are in need of trimming. BKK has
trimmed some but there are still many that need trimming. Some trees that
are too close to environmental lines such as down drains, gas lines etc.
need to be trimmed or removed for access and inspection.
3.
LANDSCAPING OF THE CLASS I LANDFILL
BKK submitted a revised landscape enhancement plan in May 1997, after '
which the City provided comments in June 1998. BKK then submitted its
response in September 1998 coupled with a request to convene a meeting
to finalize the plan, after which the City met with BKK in December 1999.
The City and BKK have yet to meet and agree on the landscape plan,
including the resolution of the irrigation water quality. Upon agreement of
a landscape plan, the City and BKK will jointly submit the plan to DTSC
for approval. Per a meeting in December 1999, BKK has submitted to the
City in February 2000, a draft joint City/BKK document, which seeks
DTSC's clarification regarding the conditions under which the State will
allow the planting of trees on the Class I landfill. BKK is waiting for the
BKKSTATUS 59 Note: Class I = closed hazardous waste landfill. 1
SLS Class III = closed household waste landfill.
1.17/02 DTSC = California Department of Toxic Substances Control
USEPA = United States Environmental Protection Agency
CIWMB = California Integrated Waste Management Board
STATUS OWLANS FOR BKK LANDOLL CLOSURE
as of December 4, 2001
City's response to the draft paper.
A side issue that has arisen is BKK's January 1998 request to RWQCB to
revise and increase the permit limits for the quality of mixed irrigation
water that has been used since 1987 on the closed Class I landfill. This
water is a combination of potable water and smaller amounts of reclaimed
site water. While not planning to alter the water mix on -site, BKK had
asked to change the permit with increased salt levels so that the permit
matches true background groundwater condition. The City is opposed to
the increase in salts due to the potential detrimental impacts salts have on
plants, especially when the mixed water will be used for irrigation of the
proposed new landscaping. BKK submitted a proposed resolution to the
City in August 1998, which is pending the City's response.
4.
LANDSCAPING TO SCREEN THE CLASS I LANDFILL
In 1997 and 1998, BKK installed a perimeter screen of trees along the
south and southeast border of the closed Class I landfill. Because of a
potential conflict with a new road that may be built to accommodate future
site development, a portion of the screen (along the southern border) has
been temporarily installed with boxed trees instead of permanently planted
in the ground. The plan is for the boxed trees to be planted in the ground
once the road alignment is resolved. In April 2000 BKK requested an
extension, which is awaiting the City's response.
5.
AZUSA FRONTAGE SCREENING
If BKK proposes to excavate the westerly ridgeline below the trigger
elevation so that it no longer blocks the view from passing cars, BKK will
be required to install a tree screen along Azusa Avenue. BKK has not yet
made the noted grading proposal, so the tree screen issue is currently not
required. Whenever it is proposed, a potential conflict with under -ground
City utilities will have to be resolved which may require a modification to
the Settlement Agreement.
6.
DUST CONTROL PLAN
There is a requirement to implement a dust control plan for the future
graded pads at the proposed business park. The plan would remain in force
until development covered the building pads. This requirement does not
apply until BKK grades the westerly and southwest ridges down to the
proposed business park elevations, which has not yet occurred. BKK
submitted a plan to the City in 1996 for review and approval. The plan is
pending City's approval.
7.
CLASS III LANDFILL FINAL CLOSURE AND POSTCLOSURE PLAN
The first three (A, B and C) of the five major final closure construction
phases (A, B, C, D and E) have been completed under the approved Partial
Final Closure Plan. The Final Closure and Postclosure Plan covers those
three plus the remaining two construction Phases D and E (see attached
map).
In October 2000 the City Council certified the Final Environmental Impact
Report for the Final Closure, Postclosure and Development of the BKK
Landfill. The next step is for BKK to amend the Final Closure and
Postclosure plans to incorporate any additional changes and the EIR
mitigation measures. Upon the CIWMB, RWQCB, and LEA'S approval of
BKKSTATUS 59 Note: Class I = closed hazardous waste landfill 2
SLS Class III = closed household waste landfill.
1.17/02 DTSC = California Department of Toxic Substances Control
USEPA = United States Environmental Protection Agency
CIWMB = California Integrated Waste Management Board
STATUS O*LANS FOR BKK LANDFOL CLOSURE
as of December 4, 2001
the amended Final Closure and Postclosure Plan BKK may commence
implementation of Final Closure for Phases D and E.
Closure construction under the Partial Final Closure Plan for Phases A, B,
and C has been largely complete for some time. The relatively small
amount of work that remained to be performed included construction of the
stormwater downdrain inlet structures for the three phases, and landscaping
for Phase C (see Item 2 above). In February and March 2001, CIWMB,
RWQCB and LEA approved BKK's revision to the Partial Final Closure
Plan to resequence this work to Phase E.
BKK had proposed to extend the variance of less than 7.5-foot vegetative
final cover soil on the top deck of the Class III Landfill. BKK later
withdrew their proposal per their letter dated February 15, 2000. The
Final Closure Plan will be amended to reflect that 7.5 feet of vegetative soil
cover will be placed on the top deck of the Class III Landfill in accordance
with the Settlement Agreement.
8. 1 CLASS I LANDFILL POSTCLOSURE PLAN
The closed Class I Landfill has been operating since 1998 in accordance
with DTSC postclosure regulations, but DTSC has yet to issue a site -
specific postclosure permit. DTSC released a draft permit for public
comment in November 1999, and then held a public hearing in December
and a community meeting in January 2000. Both events occurred at City
Hall.
City comments were sent to DTSC on February 10, 2000. The next step in
the process is for DTSC to respond to all comments and take action on the
permit. DTSC has received a total of approximately 850 comments to
which they are currently preparing responses. DTSC said in March 2001
that response to the comments is expected to be completed by this summer.
BKKSTATUS 59 Note: Class I = closed hazardous waste landfill. 3
StS Class III = closed household waste landfill.
1.17/02 DTSC = California Department of Toxic Substances Control
USEPA = United States Environmental Protection Agency
CIWMB = California Integrated Waste Management Board
STATUS OOPLANS FOR BKK LANDOLL CLOSURE
. as of December, 4, 2001
r r
l
x�,--�� --� '- ``-- -" � ` ,f � 4—CIk55 I� OCf•G''ii. AF;FJ,
Fic•urc 1
BKKSTATUS59
SLS
1.17/02
Note: Class I = closed hazardous waste landfill.
Class III = closed household waste landfill.
DTSC = California Department of Toxic Substances Control
USEPA = United States Environmental Protection Agency
CIWMB = California Integrated Waste Management Board