08-05-2015 - General Plan Update Status - StudySessionUpdate.Presentation (2).pdfGeneral Plan Update
Progress Report
8-5
scope
schedule
budget
scope
Focused General Plan update
Downtown Study
CEQA
tactical
implementation
Focused General Plan update
Downtown Plan
Downtown Code
Downtown Econ. Dev. Strategy
v
comprehensive
Lecture series
Downtown Tree Master Plan
CEQA
…
MMASJFAJJJSJFA JJ JA
2014 2015 2016
O N D M M O N D
Project Planning &
Coordination
Draft General Plan,
CBD Master Plan, &
CBD Code
Review, Refine, Assess AdoptionDiscoveryVisioning
schedule
1
23 months
2 3 4 5 6
budget
50%
task complete funds spent
50%
Direction
direction
involve everyone
host meetings throughout the City
Where are
we?
MMASJFAJJJSJFA JJ JA
2014 2015 2016
O N D M M O N D
Project Planning &
Coordination
Draft General Plan,
CBD Master Plan, &
CBD Code
Review, Refine, Assess AdoptionDiscoveryVisioning
50%
done
50%
remaining
Who’s
been
involved?
29
Public mtgs
3 Technical Advisory Committee
11 Focus Group meetings
5 speakers
8 charrette meetings
Youth Council
Student Government Day
•Glendora Ave business owners
•Glendora Ave property owners
•Citrus Valley Health Partners
•West Covina Plaza Mall
•Foothill Transit
•Library
•ESGV Japanese Community Center
•Faith Community Church
meetings
Meetings with:
technical advisory committee
•Appoint Focus Group Members
•Direct civic engagement strategy
•Provide direction
11focus groups Well-planned
&
Designed
Healthy
&
SafeAccessible
Natural
Prosperous
Active
Creative
Sustainable
Core Group
Health Demographics Retail Mobility Localism
What has changed?
Why must we change?
How can we change?
What are the opportunities?
speaker series
?
Charrette
Live
Favorite Place
Work
Need representation
monitor
participation
youth
council
planwc.org
planwc.org
social media
Yrs in West Covina
survey
www.planwc.org/survey.html
What have we
accomplished?
West Covina General Plan Update
April 2015
Market Context Report
www.planwc.org/market-study.html
urban form
Downtown First
downtown vision
I-10
I-10
Sunset AveGlendora AveVincent AveWest Covina Pkwy
Lakes DrCa
m
e
r
o
n
A
v
e Toluca AveW
a
l
n
u
t
C
r
e
e
k
Pk
w
y
parking
blank walls
Building Types
Midblock conditionwith underground parkingaccessed from alley
Mid-block conditionwith underground parkingand a service court accessed from street
Corner lot conditionwith underground parking
Mid-block conditionwith garage parkingaccessed from alley
ServiceCourtOpen Space
Work
Work
Live
Live
Live
Live
Open Space
Open Space
Open Space
Work
Work
Detached garages
Attached garages Corner units front the street
Carriage houses abovedetached garages
Tower is a building organized around a core service area. The first few floors of this building
are expressed as a base. This
allows a pedestrian scale mid-
rise building to define the street frontage with tall tower slabs extending higher, ensuring con-
textual massing and diminishing
shadows on the street and adja-
cent properties.
Coding Criteria
For the base of a tower, carefully crafted standards for a range of frontage types such as arcade,
gallery, forecourt, storefront
avoids dead walls and security
gates and activate the street.
The lot size controls the foot-
print of the tower. A larger lot size
encourages longer building masses which affects the human scale of the public environment and how we perceive and use outdoor space.
The tower’s base defines the streets edge and allows the build-ing to interact with the street experience.
Duplex consists of a pair of dwell-ing units located side-by-side or one above the other to create a
building that reads like a medium
or large house.
Triplex and quadplex is a res-
idential building of three and
four dwelling units respectively.
Depending on the lot size and con-text the units can be placed side-by-side, front-to-back or stacked, or
some combination of these options.
Coding Criteria
These medium to large footprint
buildings requires a minimum lot
width of 50 feet and a minimum
depth of 100 feet.
Duplex, triplex, and quadplexes
when packaged within house-like
form and detailing, with breaks in building elevations in the hori-zontal and vertical planes provide human scale and make the building
contextual.
Typical height of the building is 2 to 3 stories.
Rosewalk: Six or more single dwellings arranged in a linear manner along either side of a
common green. Pedestrian access
to the building entrances are
accessed from the common green and/or primary street.
Bungalow Court: Four or more
single dwellings arranged around a shared courtyard, with pedestrian access to the building entrances
from the courtyard and/or fronting
street.
Coding Criteria
The defining feature of Rosewalk
and Bungalow court is the com-
munal central open space. The lot width should be large enough to allow a functional public and private open spaces and area for
driveways.
The building size and massing of
individual buildings is similar to a
single dwelling unit.
Entrance to units shall be directly from the front yard or from the courtyard.
A building comprised of five or more attached two- or three-story dwelling units arranged
side by side, with the ground
floor raised above grade to pro-
vide privacy for ground floor rooms. The primary building sits at the front of the property, with
the garage at the rear, separated
from the primary building by a
rear yard.
Coding Criteria
The single family dwelling units can either be separated by property lines or located on narrow single tax lot 16 to 30 feet wide.
Design principles such as repe-tition, rhythm and order must be considered carefully to add interest and individuality.
Rowhouses have shallow front
yards, 5 to 10 feet, to maximize the size of a private open space in the rear yard. The rear yard should be
large enough to be functional and
receive sunlight and screened by
fence or wall to provide privacy.
Live/Work is an integrated resi-dence and work space located at street level, occupied and utilized
by a single household in an array
of at least 3 such structures, or
a structure with at least 3 units arranged side by side along the primary frontage, that has been
designed or structurally modified
to accommodate joint residential
occupancy and work activity.
Coding Criteria
The floor to ceiling height of the work floor is typically about 15 feet.
The main entrance to the street floor work space should be accessed directly from and face the street.
The dwelling unit above the work
space should be accessed by a sep-
arate entrance, and by a stair or elevator.
Each unit should have access
to private open space. The private
open space should be in the rear yard of each unit.
A group of dwelling units arranged to share one or more common courtyards. The
courtyard is intended to be a
semi-public outdoor room that is
an extension of the public realm. The units may be arranged in four possible configurations:
rowhouses, rowhouses over flats,
flats, and flats over flats. Court
buildings may accommodate ground floor commercial/flex uses in either a live-work configu-ration or as solely commercial/
retail space in qualifying zones
facing the primary street.
Coding Criteria
The main entry to ground floor units
should be directly off the courtyard
or from the street. Access to second story units should be directly from
the courtyard through stairs. Eleva-
tor access, if any, should be provided
between the underground garage and
courtyard-podium only.
The open space is designed as a cen-
tral court or partial, multiple, sepa-
rated or interconnected courtyards.
Hybrid Court is composed of two building types: the stacked dwelling and courtyard housing,
arranged around a courtyard.
This building type combines
a point-access portion of the stacked dwelling building type with a walk-up portion of the
courtyard housing building type.
The building may be designed for
occupancy by retail, service, or office uses on the ground floor, with upper floors also configured for those uses or for residences.
Coding Criteria
Stacked dwelling defines the street
edge and the building mass tapers
down to a courtyard building type.
The main entrance to all ground floor
units should be directly from the street. Entrance to the stacked dwell-
ing element can be through a dedi-
cated street level lobby, or through
a dedicated podium lobby accessible
from the street or through a side yard. Access to units above the second level
in the stacked dwelling element not
accessed from the podium is through
an interior, double-loaded corridor.
A liner building has a thin footprint that conceals parking garage or other large scale face-
less building, such as a movie the-
ater, or “big box” store to create a
pedestrian friendly environment. The building can be designed for occupancy by retail, service, and/
or office uses on the ground floor,
with upper floors configured for
retail, service, office, and/or resi-dential uses.
Coding Criteria
The main entrance to each ground floor storefront and the
theater or big box retail is directly
from the street. Entrance to the
upper levels of the building is through a street level lobby acces-sible from the street or through a side yard. Interior upper level
uses are accessed by a corridor.
Required parking is accommo-dated in an underground garage,
surface parking at the rear of the
lot, parking tucked under from the back, or a combination of any of the above.
Flex Block is a vertical mixed-use building typically of a single massing element, designed for
occupancy by retail, service, or
office uses on the ground floor,
with upper floors configured for retail, service, office, and/or res-idential uses. Second floor units
may be directly accessed from
the street through a stair. Upper
floors are accessed through a street level lobby. This building type is typically found in town centers and main streets.
Coding Criteria
The floor to ceiling height of the
first floor is greater than the rest
of the floors, typically about 15 feet to accommodate the unique needs of commercial space and increase the comfort of occu-
pants and guests.
The main entrance to each ground floor tenant bay should be
directly from the street. Required
parking is accommodated in an underground garage, surface park-ing, structured parking, tuck under parking, or some combination of
these options.
TowersHybrid CourtRow House Flex BuildingCourtRosewalk & Bungalow Court Liner BuildingLive workDuplex, Triplex, Quadplex
Downtown West Covina Code
LotPrivate Frontage R.O.WPublic Frontage LotPrivate Frontage R.O.WPublic Frontage
Dooryard: A frontage wherein the facade is set
back from the frontage line with an elevated
garden or terrace permitted to encroach. This type can effectively buffer residential quarters
from the sidewalk, while removing the private
yard from public encroachment. The terrace is
also suitable for cafes.
Stoop: A frontage wherein the facade is aligned
close to the frontage line with the first story
elevated from the sidewalk sufficiently to secure
privacy for the windows. The entrance is usually
an exterior stair and landing. This type is recom-
mended for ground-floor residential use.
Forecourt: A frontage wherein a portion of
the facade is close to the frontage line and the
central portion is set back. The forecourt with a
large tree offers visual and environmental vari-
ety to the urban street streetscape. The fore-
court may accommodate a vehicular drop-off.
Lightcourt: A frontage wherein the facade
is setback from the frontage line by a sunken
lightcourt. This type buffers residential use from
urban sidewalks and removes the private yard from public encroachment.
Shopfront: A frontage wherein the facade
is aligned close to the frontage line with the
building entrance at sidewalk grade. This type
is conventional for retail use. It has substantial
glazing on the sidewalk level and an awning that
may overlap the sidewalk.
Gallery: A frontage wherein the facade is aligned close to the frontage line with an
attached cantilevered shed or a lightweight
colonnade overlapping the sidewalk. This type is
conventional for retail use. The gallery shall be
no less than 10 feet wide and may overlap the
whole width of the sidewalk to within 2 feet of
the curb.
Arcade: A frontage wherein the facade is a
colonnade that overlaps the sidewalk, while the
facade at sidewalk level remains at the frontage
line. This type is conventional for retail use. The
arcade shall be no less than 12 feet wide and
may overlap the whole width of the sidewalk to
within 2 feet of the curb.
Porch: A frontage wherein the facade is set back
from the frontage line with an attached porch permitted to encroach. A fence at the front-
age line maintains the demarcation of the yard
while not blocking view into the front yard. The
porches shall be no less than 8 feet deep.
Frontage Types
Code
streets
6'
RIGHT OF WAY
10'
104'
9'10'
84'PAVEMENT
10'10'6'10'9'10'10'
6'
RIGHT OF WAY
39'
77'
5'8'6'5'8'8'6"
RIGHT OF WAY
12'
165'
18'
127'PAVEMENT
18'50'8'-6"12'20'18'
12'
RIGHT OF WAY 150'
14'8'
134'PAVEMENT
14'12'4'12'12'14'14'12'14'8'
RIGHT OF WAY 74'
13'
48'PAVEMENT
7'11'12'18'13'
RIGHT OF WAY 92'
16'
60'PAVEMENT
18'12'16'18'12'
RIGHT OF WAY 80'
8'
64'PAVEMENT
11'15'8'18'12'8'
12'
RIGHT OF WAY 150'
14'8'134'PAVEMENT
14'12'4'12'12'14'14'12'14'8'
RIGHT OF WAY 84'64'PAVEMENT
8'14'12'12'14'12'12'
RIGHT OF WAY 84'64'PAVEMENT
10'10'14'12'12'14'12'
12'12'14'12'12'18'4'84'PAVEMENT
10'10'
RIGHT OF WAY 104'
RIGHT OF WAY 165'
18'127'PAVEMENT
18'20'18'25'8'14'11'17'16'
RIGHT OF WAY 80'64'PAVEMENT
8'8'14'12'12'14'12'14'12'12'14'12'64'PAVEMENT 100'RIGHT OF WAY
8'8'4'4'12'
RIGHT OF WAY 74'
13'48'PAVEMENT
12'13'12'12'12'
RIGHT OF WAY
39'
77'
19'19'
RIGHT OF WAY 92'
10'60'PAVEMENT
12'10'8'6'10'12'10'8'6'
RIGHT OF WAY 84'64'PAVEMENT
10'10'14'12'12'14'12'
RIGHT OF WAY 84'64'PAVEMENT
8'14'12'12'14'12'12'
8'12'12'12'12'
64'PAVEMENT 100'RIGHT OF WAY
8'8'4'4'12'8'TURNING LANESIDEWALK TRAVELBIKE LANEbufferTRAVELSUICIDE LANETURNING LANESIDEWALK TRAVELBIKE LANEbufferTRAVELLANDSCAPEBIKE PATHWASHPEDESTRIAN PATHWalk along the WashLANDSCAPE BIKE PATHPEDESTRIAN PATHSIDEWALK TRAVELPARALLELPARKINGDIAGONAL PARKINGMEDIANSIDEWALK TRAVELPARALLELPARKINGDIAGONAL PARKINGBUS LANESIDEWALK TRAVELTRAVELTRAVELMEDIANTURNING LANETURNING LANETRAVELTRAVELBUS LANETRAVELSIDEWALK PARALLELPARKINGTRAVELTRAVELDIAGONALPARKINGSIDEWALK SIDEWALK DIAGONAL PARKINGTRAVELSIDEWALK DIAGONAL PARKINGTRAVELPARALLELPARKINGTRAVELPAINTED MEDIANSIDEWALK DIAGONAL PARKINGTRAVELSIDEWALK BUS LANESIDEWALK TRAVELTRAVELTRAVELMEDIANTURNING LANETURNING LANETRAVELTRAVELBUS LANETRAVELSIDEWALKTRAVELMEDIAN TRAVELTRAVELSIDEWALKTRAVELSIDEWALKSIDEWALKCITY HALLTRAVELTURNING LANETRAVELTRAVELTRAVELTURNING LANETRAVELTRAVELTRAVELTRAVELTRAVELMEDIANSIDEWALKSIDEWALK Sunset Ave.SIDEWALK TRAVELSIDEWALK DIAGONAL PARKINGTRAVELPARKINGTRAVELMEDIANHEAD IN PARKINGHEAD IN PARKINGSIDEWALK SIDEWALK TRAVELTURNING LANETRAVELTRAVELTRAVELTRAVELMEDIANTRAVELTRAVELTRAVELPLANTERSIDEWALKPLANTERPLANTERSIDEWALKSIDEWALK TRAVELSIDEWALK TRAVELTRAVELTRAVELWASH(existing)
Walk along the Wash(existing) West Covina Pkwy. 2(existing)
West Covina Pkwy. 1(existing) Walnut Creek Pkwy.(existing) Vincent Ave.(existing)
Lakes Dr.(existing)Glendora Ave.(existing) Cameron Ave.(existing)
(varies)SIDEWALK TRAVELPARALLELPARKINGTRAVELPLANTER Toluca Ave.(existing)SIDEWALK TRAVELPARALLELPARKINGTRAVELPLANTER Toluca Ave.(proposed)SIDEWALKSIDEWALKCITY HALLTRAVELTURNING LANETRAVELTRAVELTRAVEL West Covina Pkwy. 2(proposed)SIDEWALKTRAVELMEDIANTRAVELTRAVELSIDEWALKTRAVEL West Covina Pkwy. 1(proposed)CITY HALL Sunset Ave.(proposed)MEDIANTRAVELTRAVELTRAVELPLANTERSIDEWALKPLANTERPLANTERSIDEWALK Lakes Dr.(proposed)PARALLELPARKINGPARALLELPARKING Cameron Ave.(proposed)
Walnut Creek Pkwy.(proposed)
Glendora Ave.(proposed)
Vincent Ave.(proposed)
–Jaime Lerner, Architect, former mayor of Curitiba, Brazil
Disturbing the order of things …“The lack of resources is no longer an excuse not to act.
The idea that action should only be taken after all of the
answers & the resources have been found is a sure
recipe for paralysis.
The planning of a city is a process that allows for
corrections; it is supremely arrogant to believe that
planning can be done only after every variable has been
controlled.
๏ A deliberate, phased approach to instigating change;
๏ Local solutions for local challenges;
๏ Short-term commitment & realistic expectations;
๏ Low-risks, with a possibly a high reward; &
๏ Social capital & building of organizational capacity.
tactical
demonstration projects
What’s next?
Our
Natural
Community
Our
Prosperous
Community
Our
Well Planned
Community
Our
Accessible
Community
Our
Sustainable
Community
Our
Active
Community
Our
Creative
Community
Our
Healthy &
Safe
Community
MMASJFAJJJSJFA JJ JA
2014 2015 2016
O N D M M O N D
Project Planning &
Coordination
Draft General Plan,
CBD Master Plan, &
CBD Code
Review, Refine, Assess AdoptionDiscoveryVisioning